INDOT contract R-40648-A bid tabulation
INTERSECTION IMPROVEMENT. Let by Indiana DOT on January 14, 2026, Porter, LaPorte. 4 bids received; low bid $3,760,796 by Milestone Contractors LP.
- Owner
- Indiana DOT
- Letting
- 14 JAN 2026
- Pay items
- 151
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Milestone Contractors LP | $3,760,796 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $4,052,219 | +8.0% |
| 3 | Dyer Construction Co Inc | $4,208,021 | +12% |
| 4 | Grimmer Construction Inc | $4,312,374 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Milestone Contractors LP | 2. Rieth-Riley Construction Co., Inc. | 3. Dyer Construction Co Inc | 4. Grimmer Construction Inc |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $15,000 | $105,000 | $83,205 | $95,000 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Mobilization and demobilization (110-01001) | LS | 1 | $195,000 | $424,000 | $203,798 | $220,000 |
| 0010 | Clearing right-of-way (201-52370) | LS | 1 | $65,000 | $60,000 | $35,858 | $225,000 |
| 0011 | Structures and obstructions, remove (202-01000) | LS | 1 | $13,000 | $90,000 | $12,713 | $35,000 |
| 0012 | Headwall, remove (202-02271) | EACH | 1 | $2,000.00 | $1,100.00 | $820.74 | $796.00 |
| 0013 | Curb and gutter, remove (202-02279) | LFT | 4,276 | $8.50 | $8.70 | $7.26 | $6.00 |
| 0014 | Concrete apron, remove (202-02771) | EACH | 6 | $790.00 | $2,300.00 | $267.69 | $605.00 |
| 0015 | Sidewalk concrete, remove (202-52710) | SYS | 1,117 | $17.00 | $24.74 | $10.07 | $9.00 |
| 0016 | Inlet, remove (202-91385) | EACH | 8 | $163.00 | $163.00 | $388.04 | $163.00 |
| 0017 | Manhole, remove (202-93047) | EACH | 6 | $254.00 | $254.00 | $419.28 | $254.00 |
| 0018 | Pipe, remove (202-96133) | LFT | 757 | $16.00 | $16.00 | $22.26 | $16.00 |
| 0019 | Pipe, remove , water main (202-96133) | LFT | 220 | $14.00 | $14.00 | $22.40 | $14.00 |
| 0020 | Fire hydrant assembly, remove (202-97009) | EACH | 1 | $824.00 | $824.00 | $846.75 | $824.00 |
| 0021 | Excavation, common (203-02000) | CYS | 16,090 | $34.00 | $32.00 | $43.42 | $38.00 |
| 0022 | Excavation, unclassified (203-02020) | CYS | 225 | $66.00 | $70.00 | $46.51 | $53.00 |
| 0023 | Stormwater management budget (205-12108) | DOL | 32,521 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0024 | Stormwater management implementation (205-12616) | LS | 1 | $6,000.00 | $35,000 | $33,564 | $30,800 |
| 0025 | SWQCP preparation (205-12618) | LS | 1 | $1,800.00 | $1,800.00 | $3,480.00 | $4,950.00 |
| 0026 | Subgrade treatment, type II (207-08264) | SYS | 619 | $29.00 | $32.00 | $22.22 | $26.00 |
| 0027 | Subgrade treatment, type III (207-08266) | SYS | 2,267 | $0.85 | $3.85 | $1.68 | $4.00 |
| 0028 | Subgrade treatment, type IC (207-09935) | SYS | 647 | $50.00 | $32.00 | $37.31 | $45.00 |
| 0029 | Subgrade treatment, type ibc (207-12635) | SYS | 10,850 | $12.15 | $15.00 | $12.44 | $12.00 |
| 0030 | B borrow (211-02050) | CYS | 225 | $70.00 | $30.00 | $45.87 | $30.00 |
| 0031 | Structure backfill, type 2 (211-09265) | CYS | 882 | $68.00 | $0.01 | $60.67 | $68.00 |
| 0032 | Geogrid, type IB , triaxial (214-11796) | SYS | 11,473 | $1.10 | $1.28 | $2.42 | $1.00 |
| 0033 | Compacted aggregate, no. 53 (301-12234) | CYS | 2,103 | $69.00 | $64.00 | $88.48 | $79.00 |
| 0034 | Dense graded subbase (302-07455) | CYS | 104 | $87.00 | $100.00 | $94.34 | $142.00 |
| 0035 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 933 | $96.00 | $99.39 | $99.39 | $109.00 |
| 0036 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 1,170 | $89.00 | $85.39 | $85.39 | $93.00 |
| 0037 | QC/QA-HMA, 3, 58S, base, 19.0 MM (401-000053) | TON | 3,133 | $80.00 | $77.38 | $77.38 | $85.00 |
| 0038 | Joint adhesive (401-11526) | LFT | 4,060 | $0.90 | $1.28 | $1.28 | $1.30 |
| 0039 | Void reducing asphalt membrane for HMA (401-12439) | LFT | 4,060 | $5.30 | $4.50 | $4.90 | $6.00 |
| 0040 | Asphalt for tack coat (406-05520) | TON | 9 | $1,100.00 | $1,600.00 | $1,168.69 | $1,270.00 |
| 0041 | PCCP, 9.5 in. , colored and patterned (502-08201) | SYS | 516 | $150.00 | $151.07 | $151.07 | $172.00 |
| 0042 | PCCP, 4 in. (502-11543) | SYS | 1,889 | $50.00 | $58.57 | $58.57 | $70.00 |
| 0043 | D-1 contraction joint (503-05240) | LFT | 252 | $23.00 | $44.00 | $22.50 | $25.00 |
| 0044 | Fence, chain link, reset (603-06065) | LFT | 50 | $154.00 | $300.00 | $154.00 | $123.00 |
| 0045 | Sidewalk, concrete (604-06070) | SYS | 1,083 | $50.00 | $73.15 | $73.15 | $87.00 |
| 0046 | Curb ramp, concrete (604-08086) | SYS | 298 | $160.00 | $145.31 | $145.31 | $170.00 |
| 0047 | Detectable warning surfaces (604-12083) | SYS | 38 | $250.00 | $85.18 | $85.18 | $100.00 |
| 0048 | Curb, concrete , modified (605-06120) | LFT | 202 | $50.00 | $24.61 | $24.61 | $32.00 |
| 0049 | Curb and gutter, concrete , modified (605-06140) | LFT | 4,670 | $30.00 | $26.15 | $26.15 | $32.00 |
| 0050 | Center curb, concrete, type D (605-06255) | SYS | 387 | $175.00 | $120.70 | $120.70 | $145.00 |
| 0051 | Curb and gutter, rolled curb (605-97937) | LFT | 327 | $45.00 | $25.14 | $25.14 | $33.00 |
| 0052 | PCCP for approaches, 9 in. (610-09108) | SYS | 619 | $100.00 | $108.85 | $108.85 | $130.00 |
| 0053 | Mailbox assembly, single (611-06497) | EACH | 1 | $335.00 | $550.00 | $335.00 | $165.00 |
| 0054 | Monument, type B (615-06505) | EACH | 26 | $900.00 | $1,200.00 | $900.00 | $1,260.00 |
| 0055 | Monument, type C (615-06510) | EACH | 4 | $750.00 | $850.00 | $750.00 | $770.00 |
| 0056 | Monument, type D (615-06515) | EACH | 2 | $557.00 | $175.00 | $557.00 | $247.00 |
| 0057 | Riprap, revetment (616-06405) | TON | 17 | $135.00 | $440.00 | $131.06 | $89.00 |
| 0058 | Geotextile for riprap, type 1A (616-12246) | SYS | 20 | $32.00 | $24.66 | $35.13 | $28.00 |
| 0059 | Mobilization and demobilization for seeding (621-01004) | EACH | 3 | $500.00 | $250.00 | $475.00 | $550.00 |
| 0060 | Fertilizer for permanent seeding (621-06545) | TON | 1 | $1,100.00 | $1,100.00 | $1,475.00 | $1,650.00 |
| 0061 | Seed mixture, type U (621-06554) | LBS | 267 | $6.80 | $6.80 | $10.65 | $12.00 |
| 0062 | Mulching material (621-06565) | TON | 3 | $580.00 | $580.00 | $1,195.00 | $1,310.00 |
| 0063 | Water (621-06567) | KGAL | 27 | $150.00 | $150.00 | $5.00 | $6.00 |
| 0064 | Sodding, nursery (621-06575) | SYS | 6,989 | $8.70 | $8.70 | $9.40 | $16.00 |
| 0065 | Field office, type C (628-09403) | MOS | 10 | $3,000.00 | $4,100.00 | $4,730.90 | $3,240.00 |
| 0066 | Computer system equipment (628-11976) | EACH | 2 | $800.00 | $500.00 | $2,071.93 | $1,230.00 |
| 0067 | Topsoil processing and distribution (629-000149) | SYS | 13,562 | $11.20 | $4.60 | $10.21 | $4.00 |
| 0068 | Topsoil amendment budget (629-000150) | DOL | 27,124 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0069 | Water main , flushout assembly (715-02388) | EACH | 1 | $5,970.00 | $5,970.00 | $10,056 | $5,970.00 |
| 0070 | Water main , flushout assembly, remove (715-02388) | EACH | 1 | $500.00 | $500.00 | $846.75 | $500.00 |
| 0071 | Pipe, type 4, circular, diameter 6 in. (715-05048) | LFT | 912 | $30.00 | $30.00 | $25.10 | $30.00 |
| 0072 | Pipe, type 2, circular, diameter 12 in. (715-05149) | LFT | 1,957 | $80.00 | $80.00 | $119.34 | $80.00 |
| 0073 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 252 | $85.00 | $85.00 | $138.28 | $85.00 |
| 0074 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 244 | $110.00 | $110.00 | $142.59 | $110.00 |
| 0075 | Pipe, type 2, circular, diameter 24 in. (715-05154) | LFT | 159 | $115.00 | $115.00 | $167.17 | $115.00 |
| 0076 | Pipe, type 3, circular, diameter 15 in. (715-05169) | LFT | 59 | $85.00 | $85.00 | $126.19 | $85.00 |
| 0077 | Pipe extension, circular, diameter 8 in. , PVC (715-06051) | LFT | 5 | $250.00 | $250.00 | $312.67 | $250.00 |
| 0078 | Video inspection for pipe (715-09064) | LFT | 2,617 | $1.35 | $2.00 | $1.25 | $3.00 |
| 0079 | Insertion valve 12 in. (715-11360) | EACH | 1 | $29,700 | $29,700 | $31,500 | $29,700 |
| 0080 | Pipe end section, diameter 12 in. (715-46000) | EACH | 7 | $1,600.00 | $1,600.00 | $1,909.56 | $1,600.00 |
| 0081 | Pipe end section, diameter 15 in. (715-46005) | EACH | 2 | $2,000.00 | $2,000.00 | $2,028.83 | $2,000.00 |
| 0082 | Pipe end section, diameter 24 in. (715-46020) | EACH | 1 | $5,000.00 | $5,000.00 | $2,684.89 | $5,000.00 |
| 0083 | Water main, ductile iron, 12 in. , restrained (715-92544) | LFT | 210 | $348.00 | $348.00 | $493.63 | $348.00 |
| 0084 | Geotextile for underdrains, type 2A (718-12307) | SYS | 657 | $5.00 | $5.00 | $1.34 | $5.00 |
| 0085 | Aggregate for underdrains (718-52610) | CYS | 83 | $65.00 | $65.00 | $72.34 | $65.00 |
| 0086 | Manhole, type J15, modified (720-01092) | EACH | 23 | $5,000.00 | $5,000.00 | $6,609.37 | $5,000.00 |
| 0087 | Casting, manhole, adjust to grade (720-12798) | EACH | 2 | $500.00 | $500.00 | $828.96 | $500.00 |
| 0088 | Inlet, type R13 (720-45075) | EACH | 2 | $2,900.00 | $2,900.00 | $4,311.88 | $2,900.00 |
| 0089 | Manhole, type C4 (720-45410) | EACH | 4 | $3,500.00 | $3,500.00 | $4,170.19 | $3,500.00 |
| 0090 | Fire hydrant assembly (720-96999) | EACH | 2 | $8,900.00 | $8,900.00 | $12,643 | $8,900.00 |
| 0091 | Catch basin, type B15 (720-99416) | EACH | 16 | $3,650.00 | $3,650.00 | $5,457.49 | $3,650.00 |
| 0092 | Catch basin, type C15 (720-99417) | EACH | 3 | $3,750.00 | $3,750.00 | $5,464.23 | $3,750.00 |
| 0093 | Road closure sign assembly (801-04308) | EACH | 4 | $300.00 | $300.00 | $300.00 | $284.00 |
| 0094 | Detour route marker assembly (801-06625) | EACH | 31 | $175.00 | $175.00 | $175.00 | $172.00 |
| 0095 | Construction sign, type A (801-06640) | EACH | 12 | $225.00 | $225.00 | $225.00 | $228.00 |
| 0096 | Maintaining traffic (801-06775) | LS | 1 | $35,000 | $40,000 | $16,500 | $65,000 |
| 0097 | Barricade, type III-A (801-07118) | LFT | 156 | $15.00 | $15.00 | $15.00 | $17.00 |
| 0098 | Barricade, type III-B (801-07119) | LFT | 24 | $15.00 | $15.00 | $15.00 | $17.00 |
| 0099 | Portable changeable message sign (801-11642) | EACH | 5 | $2,500.00 | $2,500.00 | $2,500.00 | $4,390.00 |
| 0100 | Sign, sheet, remove (802-04089) | EACH | 5 | $86.58 | $86.58 | $86.58 | $95.00 |
| 0101 | Sign post, square, type 1, reinforced anchor base (802-05701) | LFT | 337 | $38.53 | $38.53 | $38.53 | $42.00 |
| 0102 | Sign post, square, type 2, reinforced anchor base (802-05702) | LFT | 21 | $35.44 | $35.44 | $35.44 | $39.00 |
| 0103 | Sign, sheet, with legend, 0.080 in. thickness (802-09838) | SFT | 208 | $37.14 | $37.14 | $37.14 | $41.00 |
| 0104 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 44 | $38.18 | $38.18 | $38.18 | $42.00 |
| 0105 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 20 | $40.98 | $40.98 | $40.98 | $45.00 |
| 0106 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $582.20 | $582.20 | $582.20 | $640.00 |
| 0107 | Handhole, signal, type 1 (805-01842) | EACH | 3 | $2,404.71 | $2,404.71 | $2,404.71 | $2,640.00 |
| 0108 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 2 | $1,248.71 | $1,248.71 | $1,248.71 | $1,370.00 |
| 0109 | Signal pole foundation, 24 in. X 24 in. X 36 in. (805-02645) | EACH | 2 | $1,133.01 | $1,133.01 | $1,133.01 | $1,250.00 |
| 0110 | Loop detector delay amplifier, counting, no. 2 channel (805-09539) | EACH | 2 | $456.96 | $456.96 | $456.96 | $502.00 |
| 0111 | Conduit, PVC, 2 in. schedule 80 (805-11813) | LFT | 300 | $17.87 | $17.87 | $17.87 | $20.00 |
| 0112 | Conduit, HDPE, 2 in. schedule 80 (805-11815) | LFT | 950 | $16.86 | $16.86 | $16.86 | $19.00 |
| 0113 | Pedestrian push button, APS (805-11817) | EACH | 2 | $1,271.75 | $1,271.75 | $1,271.75 | $1,400.00 |
| 0114 | Traffic signal head, no. 3 (805-78205) | EACH | 2 | $1,361.17 | $1,361.17 | $1,361.17 | $1,500.00 |
| 0115 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 1,400 | $1.24 | $1.24 | $1.24 | $1.37 |
| 0116 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 1,300 | $3.90 | $3.90 | $3.90 | $4.00 |
| 0117 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 1,200 | $3.22 | $3.22 | $3.22 | $4.00 |
| 0118 | Signal detector housing (805-78785) | EACH | 3 | $1,505.77 | $1,505.77 | $1,505.77 | $1,660.00 |
| 0119 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 500 | $15.68 | $15.68 | $15.68 | $17.00 |
| 0120 | Signal pole, pedestal, 10 FT (805-90005) | EACH | 2 | $1,212.72 | $1,212.72 | $1,212.72 | $1,330.00 |
| 0121 | Loop detector delay amplifier, noncounting 2 channel (805-92504) | EACH | 1 | $370.93 | $370.93 | $370.93 | $408.00 |
| 0122 | Handhole, lighting (807-02191) | EACH | 9 | $2,404.71 | $2,404.71 | $2,404.71 | $2,640.00 |
| 0123 | Luminaire, ornamental , 120W (807-03950) | EACH | 6 | $2,931.79 | $2,931.79 | $2,931.79 | $3,220.00 |
| 0124 | Luminaire, ornamental , 150W (807-03950) | EACH | 7 | $2,931.79 | $2,931.79 | $2,931.79 | $3,220.00 |
| 0125 | Light pole, ornamental (807-03951) | EACH | 13 | $3,299.20 | $3,299.20 | $3,299.20 | $3,630.00 |
| 0126 | Wire, no. 4 copper, in plastic duct, in trench, 4 1/C (807-07580) | LFT | 1,800 | $15.89 | $15.89 | $15.89 | $17.00 |
| 0127 | Illuminated sign (807-11694) | EACH | 2 | $3,579.24 | $3,579.24 | $3,579.24 | $3,940.00 |
| 0128 | Lighting foundation, conventional pole, concrete, with grounding (807-12791) | EACH | 13 | $1,811.86 | $1,811.86 | $1,811.86 | $1,990.00 |
| 0129 | Service point, type II (807-86810) | EACH | 1 | $10,088 | $10,088 | $10,088 | $11,100 |
| 0130 | Cable, pole circuit, THWN, no. 10 copper, stranded 1/C (807-86889) | LFT | 1,100 | $1.88 | $1.88 | $1.88 | $2.00 |
| 0131 | Connector kit, unfused (807-86910) | EACH | 13 | $47.61 | $47.61 | $47.61 | $52.00 |
| 0132 | Connector kit, fused (807-86915) | EACH | 13 | $47.61 | $47.61 | $47.61 | $52.00 |
| 0133 | Multiple compression fitting, non- waterproofed (807-86920) | EACH | 24 | $35.61 | $35.61 | $35.61 | $39.00 |
| 0134 | Multiple compression fitting, waterproofed (807-86925) | EACH | 20 | $44.61 | $44.61 | $44.61 | $49.00 |
| 0135 | Insulation link, non- waterproofed (807-86930) | EACH | 26 | $27.11 | $27.11 | $27.11 | $30.00 |
| 0136 | Insulation link, waterproofed (807-86935) | EACH | 40 | $35.11 | $35.11 | $35.11 | $39.00 |
| 0137 | Sign, underpass, and roadway lighting, location identification (807-86950) | EACH | 13 | $145.42 | $145.42 | $145.42 | $160.00 |
| 0138 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 416 | $7.00 | $7.00 | $7.00 | $15.00 |
| 0139 | Pavement message marking, remove (808-05866) | SYS | 17 | $30.00 | $30.00 | $30.00 | $65.00 |
| 0140 | Line, thermoplastic, solid, white, 4 in. (808-06703) | LFT | 476 | $1.15 | $1.15 | $1.15 | $1.00 |
| 0141 | Transverse marking, thermoplastic, yield line, white, 24 in. (808-10118) | LFT | 50 | $13.50 | $13.50 | $13.50 | $17.00 |
| 0142 | Line, thermoplastic, dotted, white, 6 in. (808-11650) | LFT | 218 | $3.00 | $3.00 | $3.00 | $8.00 |
| 0143 | Line, thermoplastic, dotted, white, 12 in. (808-11691) | LFT | 297 | $5.00 | $5.00 | $5.00 | $9.00 |
| 0144 | Grooving for pavement markings (808-12032) | LFT | 5,140 | $0.90 | $1.19 | $0.90 | $1.50 |
| 0145 | Line, thermoplastic, solid, yellow, 4 in. (808-75245) | LFT | 4,367 | $1.15 | $1.15 | $1.15 | $1.00 |
| 0146 | Transverse marking, thermoplastic, crosshatch line, white, 12 in. (808-75260) | LFT | 33 | $4.00 | $4.00 | $4.00 | $7.00 |
| 0147 | Transverse marking, thermoplastic, crosshatch line, yellow, 12 in. (808-75278) | LFT | 341 | $4.00 | $4.00 | $4.00 | $7.00 |
| 0148 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 64 | $6.00 | $6.00 | $6.00 | $15.00 |
| 0149 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 8 | $150.00 | $150.00 | $150.00 | $258.00 |
| 0150 | Sign post, type , ornamental (802-11648) | EACH | 2 | $2,745.29 | $2,745.29 | $2,745.29 | $3,020.00 |
| 0151 | Lighting foundation, concrete, with grounding, 24 in. diameter X 72 in. (807-12184) | EACH | 2 | $1,223.01 | $1,223.01 | $1,223.01 | $1,340.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 14, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.