| 0001 | Construction engineering (105-06845) | LS | 1 | $21,209 | $7,500.00 |
| 0002 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 |
| 0003 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 |
| 0004 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 |
| 0005 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 |
| 0006 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 |
| 0007 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 |
| 0008 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 |
| 0009 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 |
| 0010 | Mobilization and demobilization (110-01001) | LS | 1 | $110,000 | $115,000 |
| 0011 | Center curb, concrete, remove (202-02273) | SYS | 2 | $946.84 | $550.00 |
| 0012 | Excavation, common (203-02000) | CYS | 109 | $100.00 | $120.00 |
| 0013 | Linear grading (203-08607) | LFT | 1,368 | $7.00 | $10.00 |
| 0014 | Stormwater management budget (205-12108) | DOL | 8,892 | $1.00 | $1.00 |
| 0015 | Stormwater management implementation (205-12616) | LS | 1 | $12,000 | $1,750.00 |
| 0016 | Subgrade treatment, type IC (207-09935) | SYS | 5,532 | $10.40 | $30.00 |
| 0017 | Geogrid, type IB (214-11796) | SYS | 5,532 | $2.00 | $3.20 |
| 0018 | HMA patching, full depth, type C (304-12625) | TON | 4,003 | $174.00 | $205.00 |
| 0019 | HMA patching, partial depth, type C (304-12626) | TON | 2 | $174.00 | $1,100.00 |
| 0020 | Milling, asphalt, 1 1/2 in. (306-08034) | SYS | 45,408 | $1.50 | $2.60 |
| 0021 | Milling, approach (306-08432) | SYS | 7,601 | $4.30 | $5.25 |
| 0022 | QC/QA-HMA, 3, 58S, surface, 9.5 MM (401-000002) | TON | 3,747 | $100.00 | $120.00 |
| 0023 | Joint adhesive, surface (401-10258) | LFT | 19,504 | $2.42 | $0.95 |
| 0024 | Asphalt for tack coat (406-05521) | SYS | 45,408 | $1.42 | $0.25 |
| 0025 | Cracks in asphalt pavement, fill (408-12028) | TON | 2 | $600.00 | $650.00 |
| 0026 | Joint repair, partial depth (509-12191) | SFT | 1,408 | $212.00 | $72.00 |
| 0027 | Curb, remove (605-02278) | LFT | 55 | $30.00 | $68.00 |
| 0028 | Curb, integral concrete (605-06090) | LFT | 55 | $55.00 | $70.00 |
| 0029 | Center curb, concrete, type A (605-06200) | LFT | 4 | $1,000.00 | $750.00 |
| 0030 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 30,074 | $0.29 | $0.61 |
| 0031 | HMA for approaches, type B (610-07487) | TON | 980 | $125.00 | $147.00 |
| 0032 | Casting adjust to grade, monument (615-06525) | EACH | 6 | $1,475.00 | $1,400.00 |
| 0033 | Mobilization and demobilization for seeding (621-01004) | EACH | 2 | $400.00 | $200.00 |
| 0034 | Mulched seeding, type R (621-06559) | SYS | 456 | $5.48 | $16.00 |
| 0035 | Field office, type C (628-09403) | MOS | 9 | $4,300.00 | $4,200.00 |
| 0036 | Casting, manhole, adjust to grade (720-12798) | EACH | 2 | $1,300.00 | $1,400.00 |
| 0037 | Temporary pavement message marking, lane indication arrow (801-01504) | EACH | 3 | $245.00 | $150.00 |
| 0038 | Road closure sign assembly (801-04308) | EACH | 4 | $245.00 | $325.00 |
| 0039 | Temporary pavement marking, 6 in. (801-06206) | LFT | 67,620 | $0.25 | $0.35 |
| 0040 | Detour route marker assembly (801-06625) | EACH | 74 | $69.00 | $110.00 |
| 0041 | Construction sign, type A (801-06640) | EACH | 90 | $165.00 | $180.00 |
| 0042 | Construction sign, type B (801-06645) | EACH | 22 | $69.00 | $100.00 |
| 0043 | Flashing arrow sign (801-06710) | DAY | 21 | $25.00 | $16.00 |
| 0044 | Maintaining traffic (801-06775) | LS | 1 | $46,500 | $94,000 |
| 0045 | Barricade, type III-A (801-07118) | LFT | 336 | $10.00 | $17.00 |
| 0046 | Barricade, type III-B (801-07119) | LFT | 48 | $10.00 | $17.00 |
| 0047 | Truck mounted attenuator (801-12042) | DAY | 21 | $300.00 | $1,510.00 |
| 0048 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 2 | $1,200.00 | $1,313.00 |
| 0049 | Pavement message marking, remove (808-05866) | SYS | 46 | $29.95 | $50.00 |
| 0050 | Line, remove (808-06716) | LFT | 27,238 | $0.45 | $0.60 |
| 0051 | Retro-reflectivity testing (808-09381) | LS | 1 | $4,000.00 | $9,013.00 |
| 0052 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 13,499 | $0.98 | $1.00 |
| 0053 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 333 | $5.95 | $12.00 |
| 0054 | Pavement message marking, multi- component, only (808-10052) | EACH | 2 | $175.00 | $200.00 |
| 0055 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 10,959 | $0.98 | $1.00 |
| 0056 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 2,423 | $1.35 | $1.25 |
| 0057 | Pavement message marking, multi- component, lane indication arrow (808-10077) | EACH | 18 | $150.00 | $190.00 |
| 0058 | Grooving for pavement markings (808-12032) | LFT | 58,409 | $0.45 | $0.60 |
| 0059 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 21,890 | $0.98 | $1.25 |
| 0060 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 7,608 | $0.98 | $1.25 |
| 0061 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 24 | $14.95 | $12.00 |
| 0062 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 2 | $165.00 | $190.00 |
| 0063 | Prismatic reflector (808-75994) | EACH | 376 | $9.95 | $12.00 |
| 0064 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 147 | $39.11 | $25.00 |
| 0065 | Snowplowable raised pavement marker (808-75998) | EACH | 123 | $45.00 | $50.00 |
| 0066 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 1,674 | $1.35 | $1.50 |