INDOT contract R-43541-A bid tabulation
CONCRETE PVMT RESTORATION, SMALL STR AND ASPHALT RESURFACE. Let by Indiana DOT on January 15, 2025, Howard, Tipton, Greenfield. 3 bids received; low bid $19,822,000 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 15 JAN 2025
- Pay items
- 145
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $19,822,000 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $22,721,796 | +15% |
| 3 | Milestone Contractors LP | $23,291,639 | +18% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Rieth-Riley Construction Co., Inc. | 3. Milestone Contractors LP |
|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $99,110 | $108,000 | $50,000 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 19 | $1,100.00 | $375.00 | $1,100.00 |
| 0003 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0004 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0005 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, PCCP (109-08441) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0009 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0010 | Quality adjustments, pavement traffic markings (109-09377) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0011 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0012 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 |
| 0013 | Mobilization and demobilization (110-01001) | LS | 1 | $991,100 | $631,501 | $1,164,581 |
| 0014 | Clearing right-of-way (201-52370) | LS | 1 | $99,110 | $18,500 | $116,458 |
| 0015 | Pavement removal (202-02240) | SYS | 2,493 | $22.00 | $30.25 | $22.00 |
| 0016 | Center curb, concrete, remove (202-02273) | SYS | 85 | $110.00 | $60.00 | $110.00 |
| 0017 | Curb, concrete, remove (202-02278) | LFT | 58 | $24.00 | $85.50 | $24.00 |
| 0018 | Signal cable, remove (202-12017) | LFT | 6,259 | $3.25 | $2.00 | $3.25 |
| 0019 | Pipe, remove (202-96133) | LFT | 72 | $125.00 | $86.00 | $84.50 |
| 0020 | Pole, remove (202-98370) | EACH | 43 | $1,100.00 | $400.00 | $1,100.00 |
| 0021 | Pipe end section, remove (202-98488) | EACH | 16 | $610.00 | $630.00 | $380.00 |
| 0022 | Excavation, common (203-02000) | CYS | 640 | $38.00 | $86.00 | $49.00 |
| 0023 | Borrow (203-02070) | CYS | 582 | $35.00 | $43.00 | $35.00 |
| 0024 | Stormwater management budget (205-12108) | DOL | 24,240 | $1.00 | $1.00 | $1.00 |
| 0025 | Stormwater management implementation (205-12616) | LS | 1 | $99,110 | $5,500.00 | $11,125 |
| 0026 | SWQCP preparation (205-12618) | LS | 1 | $3,500.00 | $3,500.00 | $5,000.00 |
| 0027 | Subgrade treatment, type II (207-08264) | SYS | 4,434 | $11.10 | $33.00 | $11.25 |
| 0028 | Subgrade treatment, type IC (207-09935) | SYS | 28 | $50.00 | $120.00 | $83.75 |
| 0029 | B borrow (211-02050) | CYS | 549 | $108.00 | $225.00 | $108.75 |
| 0030 | Structure backfill, type 2 (211-09265) | CYS | 193 | $180.00 | $98.00 | $173.75 |
| 0031 | Geogrid, type IB (214-11796) | SYS | 4,434 | $3.97 | $1.75 | $4.00 |
| 0032 | Compacted aggregate, no. 53 (301-12234) | CYS | 31 | $150.00 | $225.00 | $150.00 |
| 0033 | Compacted aggregate, no. 53 (303-01180) | TON | 2 | $50.00 | $225.00 | $378.75 |
| 0034 | Widening with HMA, type C (304-07494) | TON | 77 | $185.00 | $218.00 | $185.00 |
| 0035 | HMA patching, full depth, type C (304-12625) | TON | 2,433 | $175.00 | $252.00 | $175.00 |
| 0036 | HMA patching, partial depth, type C (304-12626) | TON | 6,509 | $145.00 | $182.00 | $145.00 |
| 0037 | Lean concrete base, 9 in. (305-12695) | SYS | 31,196 | $56.00 | $71.79 | $52.50 |
| 0038 | Milling, asphalt, 2 in. (306-08036) | SYS | 299,361 | $3.89 | $2.20 | $3.89 |
| 0039 | Milling, approach (306-08432) | SYS | 2,323 | $17.00 | $45.00 | $17.00 |
| 0040 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 33,363 | $102.00 | $106.00 | $102.00 |
| 0041 | Joint adhesive, surface (401-10258) | LFT | 179,930 | $0.39 | $0.71 | $0.39 |
| 0043 | Inertial profiler, HMA (401-12169) | LS | 1 | $8,000.00 | $5,900.00 | $8,000.00 |
| 0044 | HMA spray paver emulsion (401-12664) | TON | 138 | $800.00 | $750.00 | $800.00 |
| 0045 | HMA for temporary pavement, type C (402-10086) | TON | 94 | $393.00 | $175.00 | $393.00 |
| 0046 | Asphalt for tack coat (406-05520) | TON | 48.50 | $400.00 | $650.00 | $400.00 |
| 0047 | Cracks in asphalt pavement, fill (408-12028) | TON | 33 | $500.00 | $2,575.00 | $500.00 |
| 0049 | Retrofitted tie bars (503-03489) | EACH | 2,406 | $3.00 | $21.90 | $20.00 |
| 0050 | D-1 contraction joint (503-05240) | LFT | 13,494 | $4.50 | $15.90 | $17.50 |
| 0051 | PCCP stitching (503-09261) | EACH | 9,219 | $46.29 | $38.20 | $22.50 |
| 0052 | Terminal joint, retrofit polymer modified asphalt (503-12480) | SFT | 3,060 | $120.00 | $109.55 | $118.75 |
| 0053 | PCCP patching, full depth (506-06333) | SYS | 31,196 | $124.00 | $182.96 | $193.75 |
| 0054 | Joints in PCCP, filled (507-08271) | LFT | 8 | $1.30 | $20.00 | $41.25 |
| 0055 | Joint repair, partial depth (509-12191) | SFT | 13,723 | $50.00 | $50.15 | $125.00 |
| 0056 | Joint repair, bottom-half (509-12192) | SFT | 994 | $20.00 | $50.15 | $198.75 |
| 0057 | Guardrail, remove (601-02241) | LFT | 33,535 | $0.01 | $0.01 | $0.12 |
| 0058 | Guardrail end treatment, type MS (601-94690) | EACH | 3 | $6,100.00 | $5,385.00 | $5,385.00 |
| 0059 | Curb, concrete (605-06120) | LFT | 58 | $97.00 | $150.00 | $97.00 |
| 0060 | Curb, concrete , modified (605-06120) | LFT | 175 | $61.00 | $90.00 | $61.00 |
| 0061 | Center curb, concrete, type D (605-06255) | SYS | 189 | $233.00 | $121.50 | $233.00 |
| 0062 | Center curb, concrete, type D , modified (605-06255) | SYS | 126 | $195.00 | $162.50 | $195.00 |
| 0063 | Milled HMA corrugations, conventional (606-12399) | LFT | 63,286 | $0.65 | $0.33 | $0.85 |
| 0064 | HMA for approaches, type B (610-07487) | TON | 256 | $320.00 | $365.00 | $320.00 |
| 0065 | Monument, type B (615-06505) | EACH | 6 | $925.00 | $950.00 | $950.00 |
| 0066 | Riprap, class 1 (616-05688) | TON | 36 | $150.00 | $190.00 | $246.25 |
| 0067 | Riprap, revetment (616-06405) | TON | 43 | $200.00 | $140.00 | $332.50 |
| 0068 | Riprap, uniform (616-06451) | TON | 77 | $121.00 | $98.00 | $121.00 |
| 0069 | Geotextile for riprap, type 1A (616-12246) | SYS | 168 | $25.90 | $3.80 | $23.75 |
| 0070 | Geotextile for riprap, type 1B (616-12247) | SYS | 164 | $1.40 | $3.80 | $1.40 |
| 0071 | Mobilization and demobilization for seeding (621-01004) | EACH | 4 | $500.00 | $50.00 | $400.00 |
| 0072 | Fertilizer , for permanent seeding (621-06545) | TON | 1 | $1,500.00 | $1,800.00 | $1,950.00 |
| 0073 | Seed mixture, type U (621-06554) | LBS | 556 | $9.00 | $9.00 | $11.30 |
| 0074 | Mulched seeding, type R (621-06559) | SYS | 599 | $2.60 | $9.00 | $3.98 |
| 0075 | Mulching material (621-06565) | TON | 6 | $850.00 | $900.00 | $1,090.00 |
| 0076 | Topsoil (621-06570) | CYS | 491 | $64.00 | $108.50 | $64.00 |
| 0077 | Field office, type E (628-12684) | MOS | 18 | $7,200.00 | $5,100.00 | $10,250 |
| 0078 | Pipe, type 1, circular, diameter 15 in. (715-05119) | LFT | 78 | $127.00 | $105.00 | $127.00 |
| 0079 | Pipe, type 1, circular, diameter 18 in. (715-05121) | LFT | 100 | $181.00 | $128.00 | $165.00 |
| 0080 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 60 | $181.00 | $152.50 | $181.00 |
| 0081 | Pipe, type 2, circular, diameter 15 in. (715-05151) | LFT | 63 | $155.00 | $125.00 | $155.00 |
| 0082 | Pipe, type 2, circular, diameter 18 in. (715-05152) | LFT | 97 | $211.00 | $121.50 | $211.00 |
| 0083 | Pipe, slotted drain, diameter 18 in. , 0.07 inch (715-05424) | LFT | 53 | $257.00 | $148.50 | $257.00 |
| 0084 | HMA for structure installation, type B (715-08305) | TON | 219 | $128.00 | $223.00 | $128.00 |
| 0085 | HMA for structure installation, type C (715-08306) | TON | 244 | $128.00 | $223.00 | $128.00 |
| 0086 | Video inspection for pipe (715-09064) | LFT | 216 | $11.60 | $3.50 | $11.00 |
| 0087 | Pipe end section, diameter 12 in. (715-46000) | EACH | 5 | $1,100.00 | $1,435.00 | $2,125.00 |
| 0088 | Pipe end section, diameter 15 in. (715-46005) | EACH | 6 | $1,400.00 | $1,505.00 | $2,000.00 |
| 0089 | Pipe end section, diameter 18 in. (715-46010) | EACH | 9 | $1,500.00 | $2,340.00 | $2,375.00 |
| 0090 | Pipe end section, diameter 24 in. (715-46020) | EACH | 2 | $1,700.00 | $1,590.00 | $1,700.00 |
| 0091 | Pipe end section, diameter 36 in. (715-46040) | EACH | 2 | $2,100.00 | $2,242.00 | $3,000.00 |
| 0092 | Casting, inlet, adjust to grade (720-12797) | EACH | 1 | $750.00 | $620.00 | $750.00 |
| 0093 | Casting, type 15, furnish and adjust to grade (720-44080) | EACH | 1 | $3,100.00 | $1,840.00 | $3,100.00 |
| 0094 | Manhole, type C4 (720-45410) | EACH | 1 | $6,000.00 | $3,100.00 | $6,000.00 |
| 0095 | Construction sign, type C (801-03290) | EACH | 4 | $220.00 | $250.00 | $220.00 |
| 0096 | Road closure sign assembly (801-04308) | EACH | 20 | $225.00 | $325.00 | $225.00 |
| 0097 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 110,966 | $0.10 | $1.65 | $1.64 |
| 0098 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 86 | $9.14 | $10.00 | $9.14 |
| 0099 | Detour route marker assembly (801-06625) | EACH | 118 | $114.00 | $130.00 | $114.00 |
| 0100 | Construction sign, type A (801-06640) | EACH | 232 | $170.00 | $175.00 | $170.00 |
| 0101 | Construction sign, type B (801-06645) | EACH | 24 | $57.00 | $100.00 | $57.00 |
| 0102 | Flashing arrow sign (801-06710) | DAY | 248 | $15.00 | $10.00 | $15.00 |
| 0103 | Maintaining traffic (801-06775) | LS | 1 | $618,399 | $380,000 | $601,944 |
| 0104 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 2 | $10,250 | $10,000 | $10,000 |
| 0105 | Energy absorbing terminal, CZ, TL-3 (801-07024) | EACH | 1 | $23,500 | $25,000 | $25,000 |
| 0106 | Barricade, type III-A (801-07118) | LFT | 1,882 | $11.00 | $16.00 | $11.00 |
| 0107 | Barricade, type III-B (801-07119) | LFT | 166 | $12.00 | $16.00 | $12.00 |
| 0108 | Temporary traffic barrier, type 2 (801-08401) | LFT | 4,008 | $100.00 | $81.84 | $55.00 |
| 0109 | Portable changeable message sign (801-11642) | EACH | 9 | $2,495.00 | $5,250.00 | $2,495.00 |
| 0110 | Truck mounted attenuator (801-12042) | DAY | 140 | $460.00 | $1,830.00 | $460.00 |
| 0111 | Law enforcement officer (801-12324) | HRS | 1,744 | $60.00 | $60.00 | $60.00 |
| 0112 | Temporary speed feedback assembly (801-12832) | EACH | 2 | $2,681.00 | $3,500.00 | $2,681.00 |
| 0113 | Temporary worksite speed limit sign assembly, continuous (801-12883) | EACH | 12 | $227.00 | $400.00 | $227.00 |
| 0114 | Reference post (802-04893) | EACH | 8 | $300.00 | $200.00 | $750.00 |
| 0115 | Sign post, square, type 1, reinforced anchor base , modified (802-05701) | LFT | 1,160.50 | $26.00 | $24.00 | $26.00 |
| 0116 | Sign post, square, type 2, reinforced anchor base , modified (802-05702) | LFT | 192 | $23.00 | $13.00 | $23.00 |
| 0117 | Sign, sheet, relocate (802-07060) | EACH | 12 | $400.00 | $275.00 | $400.00 |
| 0118 | Sign, sheet, with legend, 0.100 in. thickness (802-09840) | SFT | 927.80 | $38.00 | $24.00 | $38.00 |
| 0119 | Conduit, steel, galvanized, 2 in. (805-01844) | LFT | 14,400 | $40.00 | $52.00 | $40.00 |
| 0120 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 45,760 | $1.00 | $3.00 | $1.00 |
| 0121 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 14,400 | $6.00 | $6.00 | $6.00 |
| 0122 | Signal detector housing (805-78785) | EACH | 78 | $1,500.00 | $4,000.00 | $1,500.00 |
| 0123 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 17,600 | $22.00 | $20.00 | $22.00 |
| 0124 | Pavement message marking, remove (808-05866) | SYS | 82 | $28.00 | $50.00 | $28.00 |
| 0125 | Transverse marking, remove (808-06368) | LFT | 4,807 | $3.70 | $5.50 | $3.70 |
| 0126 | Line, remove (808-06716) | LFT | 420,483 | $0.30 | $0.25 | $0.30 |
| 0127 | Retro-reflectivity testing (808-09381) | LS | 1 | $16,020 | $12,013 | $16,020 |
| 0128 | Line, multi-component, solid, white, 6 in. (808-10049) | LFT | 254,300 | $0.70 | $0.85 | $0.70 |
| 0129 | Transverse marking, multi-component, stop line, white, 24 in. (808-10051) | LFT | 1,015 | $10.00 | $10.50 | $10.00 |
| 0130 | Line, multi-component, solid, yellow, 6 in. (808-10057) | LFT | 239,249 | $0.70 | $0.85 | $0.70 |
| 0131 | Line, multi-component, broken, white, 6 in. (808-10071) | LFT | 14,230 | $1.00 | $1.10 | $1.00 |
| 0132 | Transverse marking, multi-component, crosshatch line, yellow, 24 in. (808-10119) | LFT | 1,624 | $10.00 | $15.00 | $10.00 |
| 0133 | Grooving for pavement markings (808-12032) | LFT | 572,235 | $0.50 | $0.58 | $0.50 |
| 0134 | Line, multi-component, solid, white, 10 in. (808-12781) | LFT | 24,334 | $1.50 | $0.58 | $1.50 |
| 0135 | Line, preformed plastic, dotted, white, 6 in. (808-12782) | LFT | 2,791 | $5.32 | $6.00 | $5.32 |
| 0136 | Line, preformed plastic, dotted, white, 10 in. (808-12848) | LFT | 666 | $9.43 | $12.00 | $9.43 |
| 0137 | Line, preformed plastic, solid, white, 6 in. (808-75052) | LFT | 368 | $4.62 | $5.50 | $4.62 |
| 0138 | Line, preformed plastic, broken, white, 6 in. (808-75055) | LFT | 36,297 | $5.32 | $6.00 | $5.32 |
| 0139 | Pavement message marking, preformed plastic, lane indication arrow (808-75071) | EACH | 92 | $489.00 | $420.00 | $489.00 |
| 0140 | Pavement message marking, preformed plastic, only (808-75073) | EACH | 91 | $749.00 | $540.00 | $749.00 |
| 0141 | Transverse marking, thermoplastic, crosshatch line, white, 24 in. (808-75272) | LFT | 4,437 | $7.01 | $10.00 | $7.01 |
| 0142 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 370 | $7.01 | $12.00 | $7.01 |
| 0143 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 30 | $223.00 | $160.00 | $223.00 |
| 0144 | Pavement message marking, thermoplastic, "only" (808-75325) | EACH | 4 | $194.00 | $250.00 | $194.00 |
| 0145 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 3,688 | $14.00 | $12.00 | $32.50 |
| 0146 | Snowplowable raised pavement marker (808-75998) | EACH | 3,175 | $35.00 | $40.00 | $35.00 |
| 0147 | Temporary worksite speed limit sign assembly, intermittent (801-12930) | EACH | 4 | $1,525.00 | $1,300.00 | $1,525.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.