INDOT contract R-43702-A bid tabulation
ASPHALT RESURFACE, SMALL STRUCTURES AND TRAFFIC SIGNALS. Let by Indiana DOT on January 15, 2025, Hendricks, Marion, Crawfordsville, Greenfield. 4 bids received; low bid $8,309,991 by E & B Paving LLC.
- Owner
- Indiana DOT
- Letting
- 15 JAN 2025
- Pay items
- 135
- Data through
- 05 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | E & B Paving LLC | $8,309,991 | Low |
| 2 | Rieth-Riley Construction Co., Inc. | $8,840,000 | +6.0% |
| 3 | Calumet Civil Contractors Inc | $9,134,000 | +10% |
| 4 | Milestone Contractors LP | $9,594,000 | +15% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. E & B Paving LLC | 2. Rieth-Riley Construction Co., Inc. | 3. Calumet Civil Contractors Inc | 4. Milestone Contractors LP |
|---|---|---|---|---|---|---|---|
| 0001 | Construction engineering (105-06845) | LS | 1 | $22,000 | $21,905 | $30,000 | $28,520 |
| 0002 | Inspection hole, deeper than 3 FT (107-09358) | EACH | 25 | $650.00 | $800.00 | $400.00 | $550.00 |
| 0003 | Inspection hole, 3 FT deep or less (107-09367) | EACH | 25 | $400.00 | $600.00 | $200.00 | $275.00 |
| 0004 | Liquidated damages (109-08359) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0005 | Contract liens (109-08360) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0006 | Quality adjustments, HMA (109-08440) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0007 | Quality adjustments, temporary traffic control devices (109-08443) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0008 | Quality adjustments, failed materials (109-08444) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0009 | Project estimate adjustment (109-08463) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0010 | Payment adjustment, PG asphalt binder (109-09489) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0011 | Quality adjustments, failure to maintain temporary erosion and sediment control measures (109-11362) | DOL | 1 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0012 | Mobilization and demobilization (110-01001) | LS | 1 | $415,000 | $473,852 | $455,000 | $369,763 |
| 0013 | Clearing right-of-way (201-52370) | LS | 1 | $80,000 | $10,000 | $25,000 | $65,375 |
| 0014 | Curb, concrete, remove (202-02278) | LFT | 553 | $16.00 | $18.00 | $27.00 | $17.03 |
| 0015 | Curb and gutter, remove (202-02279) | LFT | 868 | $17.00 | $18.00 | $17.00 | $17.58 |
| 0016 | Regulated materials, dispose, type C (202-05545) | CYS | 49 | $175.00 | $175.00 | $200.00 | $175.00 |
| 0017 | Regulated materials, remove, type C (202-05550) | CYS | 49 | $175.00 | $175.00 | $200.00 | $175.00 |
| 0018 | Regulated materials, transport, type C (202-05555) | CYS | 49 | $175.00 | $175.00 | $100.00 | $175.00 |
| 0019 | Testing for wastes, type , type C (202-05571) | EACH | 2 | $2,500.00 | $2,500.00 | $500.00 | $2,500.00 |
| 0020 | Sidewalk concrete, remove (202-52710) | SYS | 783 | $30.00 | $25.00 | $22.00 | $70.04 |
| 0021 | Detector housing, remove (202-90277) | EACH | 56 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0022 | Manhole, remove (202-93047) | EACH | 1 | $950.00 | $1,000.00 | $1,000.00 | $1,437.27 |
| 0023 | Guardrail end treatment, remove (202-93741) | EACH | 1 | $750.00 | $425.00 | $400.00 | $400.00 |
| 0024 | Pipe, remove (202-96133) | LFT | 75 | $20.00 | $18.00 | $10.00 | $32.21 |
| 0025 | Excavation, common (203-02000) | CYS | 59 | $105.00 | $80.00 | $70.00 | $150.95 |
| 0026 | Pump around (205-11626) | EACH | 1 | $3,500.00 | $1,500.00 | $10,000 | $8,500.00 |
| 0027 | Stormwater management budget (205-12108) | DOL | 30,625 | $1.00 | $1.00 | $1.00 | $1.00 |
| 0028 | Stormwater management implementation (205-12616) | LS | 1 | $18,000 | $6,000.00 | $10,000 | $6,023.16 |
| 0029 | Subgrade treatment, type IC (207-09935) | SYS | 4,920 | $17.00 | $20.00 | $40.00 | $48.44 |
| 0030 | Structure backfill, type 2 (211-09265) | CYS | 152 | $65.00 | $120.00 | $80.00 | $71.84 |
| 0031 | Flowable backfill, non- removable (213-09269) | CYS | 9 | $160.00 | $330.00 | $225.00 | $136.69 |
| 0032 | Geotextile for pavement, type 1B (214-12237) | SYS | 4,914 | $1.00 | $1.00 | $3.25 | $1.39 |
| 0033 | Compacted aggregate, no. 53 (301-12234) | CYS | 37 | $85.00 | $300.00 | $125.00 | $134.79 |
| 0034 | HMA patching, full depth, type C (304-12625) | TON | 2,957 | $245.00 | $265.00 | $145.00 | $232.00 |
| 0035 | HMA patching, partial depth, type C (304-12626) | TON | 781 | $195.00 | $265.00 | $300.00 | $265.00 |
| 0036 | Milling, asphalt, 2 in. (306-08036) | SYS | 225,587 | $1.40 | $2.00 | $2.20 | $2.96 |
| 0037 | Milling, transition (306-08043) | SYS | 30 | $16.00 | $30.00 | $10.00 | $4.04 |
| 0038 | Milling, approach (306-08432) | SYS | 11,661 | $7.00 | $6.00 | $8.00 | $6.84 |
| 0039 | Milling, asphalt, 4 1/2 in. (306-10113) | SYS | 43,301 | $2.45 | $4.00 | $4.40 | $5.33 |
| 0040 | QC/QA-HMA, 3, 58H, surface, 9.5 MM (401-000005) | TON | 29,775 | $99.00 | $97.00 | $100.00 | $100.54 |
| 0041 | QC/QA-HMA, 3, 58H, intermediate, 19.0 MM (401-000041) | TON | 5,962 | $89.00 | $95.00 | $95.00 | $92.00 |
| 0042 | QC/QA-HMA, 3, 58S, base, 25.0 MM (401-000047) | TON | 25 | $195.00 | $165.00 | $150.00 | $150.00 |
| 0043 | Joint adhesive, surface (401-10258) | LFT | 195,984 | $0.30 | $0.50 | $0.40 | $0.31 |
| 0044 | Joint adhesive, intermediate (401-10259) | LFT | 32,663 | $0.50 | $0.80 | $0.45 | $0.45 |
| 0045 | Liquid asphalt sealant , rpe (401-11785) | LFT | 195,984 | $0.01 | $0.01 | $0.10 | $0.09 |
| 0046 | Inertial profiler, HMA (401-12169) | LS | 1 | $10,000 | $5,000.00 | $10,000 | $3,701.18 |
| 0047 | Asphalt for tack coat (406-05520) | TON | 100 | $1.00 | $0.01 | $500.00 | $545.66 |
| 0048 | Guardrail height transition, MGS (601-12289) | EACH | 1 | $1,100.00 | $1,100.00 | $2,300.00 | $2,300.00 |
| 0049 | Guardrail end treatment, type OS (601-94689) | EACH | 1 | $3,400.00 | $3,400.00 | $3,600.00 | $3,600.00 |
| 0050 | Sidewalk, concrete (604-06070) | SYS | 318 | $65.00 | $65.00 | $65.00 | $97.64 |
| 0051 | Curb ramp, concrete (604-08086) | SYS | 542 | $165.00 | $200.00 | $225.00 | $391.81 |
| 0052 | Detectable warning surfaces (604-12083) | SYS | 111 | $180.00 | $385.00 | $400.00 | $274.92 |
| 0053 | Curb, concrete (605-06120) | LFT | 576 | $80.00 | $30.00 | $29.00 | $37.74 |
| 0054 | Curb and gutter, concrete (605-06140) | LFT | 881 | $80.00 | $30.00 | $29.00 | $38.24 |
| 0055 | Curb and gutter, rolled curb (605-97937) | LFT | 20 | $125.00 | $30.00 | $55.00 | $42.52 |
| 0056 | Milled HMA corrugations, sinusoidal (606-12400) | LFT | 53,100 | $0.95 | $0.55 | $0.35 | $0.36 |
| 0057 | HMA for approaches, type C (610-07488) | TON | 1,466 | $150.00 | $200.00 | $165.00 | $190.00 |
| 0058 | Right-of-way marker (615-06490) | EACH | 8 | $225.00 | $225.00 | $165.00 | $165.00 |
| 0059 | Monument, type B (615-06505) | EACH | 116 | $850.00 | $850.00 | $975.00 | $975.00 |
| 0060 | Monument, type C (615-06510) | EACH | 9 | $400.00 | $400.00 | $726.00 | $726.00 |
| 0061 | Mobilization and demobilization for seeding (621-01004) | EACH | 6 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0062 | Mulched seeding, type U (621-06560) | SYS | 719 | $3.71 | $3.71 | $3.71 | $3.71 |
| 0063 | Sodding (621-06574) | SYS | 56 | $105.00 | $105.00 | $105.00 | $105.00 |
| 0064 | Computer system equipment (628-11976) | EACH | 4 | $540.00 | $1,000.00 | $500.00 | $1,050.17 |
| 0065 | Field office, type D (628-12683) | MOS | 12 | $5,500.00 | $6,000.00 | $6,000.00 | $5,621.18 |
| 0066 | Temporary shoring (702-04325) | LS | 1 | $2,500.00 | $1,500.00 | $10,000 | $7,215.29 |
| 0067 | Pipe, underdrain outlet, diameter 6 in. (715-05053) | LFT | 200 | $30.00 | $20.00 | $55.00 | $24.00 |
| 0068 | Pipe, type 1, circular, diameter 24 in. (715-05123) | LFT | 75 | $195.00 | $400.00 | $145.00 | $186.23 |
| 0069 | Pipe, type 4, circular, diameter 4 in. (715-05203) | LFT | 300 | $25.00 | $12.00 | $32.00 | $11.48 |
| 0070 | Video inspection for underdrain (718-06532) | LFT | 3,000 | $1.25 | $1.00 | $1.25 | $1.40 |
| 0071 | Casting, inlet, adjust to grade (720-12797) | EACH | 111 | $450.00 | $250.00 | $775.00 | $943.78 |
| 0072 | Casting, manhole, adjust to grade (720-12798) | EACH | 88 | $500.00 | $400.00 | $775.00 | $943.78 |
| 0073 | Casting, type 5, furnish and adjust to grade (720-44030) | EACH | 2 | $2,000.00 | $1,800.00 | $1,850.00 | $1,900.79 |
| 0074 | Casting, type 10, furnish and adjust to grade (720-44055) | EACH | 2 | $1,500.00 | $1,700.00 | $1,500.00 | $1,657.57 |
| 0075 | Casting, type 15, furnish and adjust to grade (720-44080) | EACH | 2 | $1,750.00 | $2,000.00 | $2,100.00 | $2,043.55 |
| 0076 | Manhole, type H4 (720-91973) | EACH | 2 | $7,000.00 | $8,000.00 | $6,500.00 | $5,250.44 |
| 0077 | Casting, water valve, adjust to grade (720-94840) | EACH | 41 | $250.00 | $200.00 | $425.00 | $382.80 |
| 0078 | Temporary pavement marking, removable, 6 in. (801-06209) | LFT | 33,829 | $1.68 | $2.95 | $1.68 | $1.87 |
| 0079 | Temporary pavement marking, removable, 24 in. (801-06577) | LFT | 128 | $9.69 | $11.80 | $9.69 | $5.00 |
| 0080 | Construction sign, type A (801-06640) | EACH | 128 | $159.00 | $165.00 | $159.00 | $300.00 |
| 0081 | Construction sign, type B (801-06645) | EACH | 33 | $61.00 | $98.00 | $61.00 | $100.00 |
| 0082 | Maintaining traffic (801-06775) | LS | 1 | $164,000 | $350,000 | $688,218 | $416,466 |
| 0083 | Energy absorbing terminal, CZ, TL-2 (801-07023) | EACH | 5 | $15,100 | $15,100 | $3,200.00 | $8,120.00 |
| 0084 | Barricade, type III-A (801-07118) | LFT | 24 | $12.00 | $12.00 | $12.00 | $25.00 |
| 0085 | Barricade, type III-B (801-07119) | LFT | 24 | $14.00 | $12.00 | $14.00 | $25.00 |
| 0086 | Temporary traffic barrier, anchored, type 2 (801-08508) | LFT | 485 | $115.00 | $50.00 | $130.00 | $125.59 |
| 0087 | Temporary curb ramp (801-11990) | EACH | 2 | $4,200.00 | $5,000.00 | $500.00 | $3,253.73 |
| 0088 | Portable signal (801-12081) | LS | 1 | $6,500.00 | $5,000.00 | $5,500.00 | $12,436 |
| 0089 | Temporary accessible pedestrian path (801-12641) | SYS | 118 | $62.00 | $120.00 | $90.00 | $61.28 |
| 0090 | Temporary pedestrian channelizer (801-12862) | LFT | 382 | $55.00 | $40.00 | $45.00 | $72.32 |
| 0091 | Sign, sheet, remove (802-04089) | EACH | 4 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0092 | Sign, sheet, with legend, 0.125 in. thickness (802-09842) | SFT | 48 | $50.00 | $50.00 | $50.00 | $50.00 |
| 0093 | Traffic signal equipment, remove (805-01300) | EACH | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0094 | Miscellaneous equipment for traffic signals (805-01579) | LS | 1 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0095 | Signal pole foundation, 36 in. X 144 in. (805-01815) | EACH | 4 | $6,000.00 | $6,000.00 | $6,000.00 | $6,000.00 |
| 0096 | Transportation of salvageable signal equipment (805-02087) | LS | 1 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0097 | Pedestrian signal head, countdown, 18 in. (805-02150) | EACH | 8 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0098 | Controller and cabinet, type P1 (805-02445) | EACH | 1 | $22,000 | $22,000 | $22,000 | $22,000 |
| 0099 | Cellular modem kit (805-08244) | EACH | 1 | $2,500.00 | $2,500.00 | $2,500.00 | $2,500.00 |
| 0100 | Contact closure card (805-09845) | EACH | 54 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0101 | Receiver processor (805-09846) | EACH | 54 | $750.00 | $750.00 | $750.00 | $750.00 |
| 0102 | Wireless magnetometer detector (805-10107) | EACH | 54 | $500.00 | $500.00 | $500.00 | $500.00 |
| 0103 | Wireless repeater (805-10108) | EACH | 54 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0104 | Handhole, signal, type 2 (805-11744) | EACH | 4 | $3,000.00 | $3,000.00 | $3,000.00 | $3,000.00 |
| 0105 | Conduit, PVC, 2 in. schedule 80 (805-11813) | LFT | 303 | $54.00 | $54.00 | $54.00 | $54.00 |
| 0106 | Pedestrian push button, APS (805-11817) | EACH | 8 | $2,000.00 | $2,000.00 | $2,000.00 | $2,000.00 |
| 0107 | Traffic signal head, no. 3 (805-78205) | EACH | 8 | $1,500.00 | $1,500.00 | $1,500.00 | $1,500.00 |
| 0108 | Span, catenary, and tether (805-78415) | EACH | 4 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0109 | Disconnect hanger (805-78420) | EACH | 4 | $800.00 | $800.00 | $800.00 | $800.00 |
| 0110 | Signal service (805-78445) | EACH | 1 | $3,500.00 | $3,500.00 | $3,500.00 | $3,500.00 |
| 0111 | Signal cable, service, copper, 3C/8 gauge (805-78467) | LFT | 35 | $10.00 | $10.00 | $10.00 | $10.00 |
| 0112 | Signal cable, roadway loop, copper, 1C/14 gauge (805-78470) | LFT | 25,413 | $3.00 | $3.00 | $3.00 | $3.00 |
| 0113 | Signal cable, control, copper, 3C/14 gauge (805-78480) | LFT | 1,120 | $6.00 | $6.00 | $6.00 | $6.00 |
| 0114 | Signal cable, control, copper, 5C/14 gauge (805-78485) | LFT | 1,580 | $7.00 | $7.00 | $7.00 | $7.00 |
| 0115 | Signal cable, detector lead-in, copper, 2C/16 gauge (805-78510) | LFT | 780 | $5.00 | $5.00 | $5.00 | $5.00 |
| 0116 | Signal detector housing (805-78785) | EACH | 60 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0117 | Saw cut for roadway loop detector and sealant (805-78795) | LFT | 6,479 | $20.00 | $20.00 | $20.00 | $20.00 |
| 0118 | Controller cabinet foundation, type P1 (805-78925) | EACH | 1 | $4,000.00 | $4,000.00 | $4,000.00 | $4,000.00 |
| 0119 | Signal pole, steel strain, 36 FT (805-81060) | EACH | 4 | $11,500 | $11,500 | $11,500 | $11,500 |
| 0120 | Loop detector delay amplifier, noncounting 2 channel (805-92504) | EACH | 8 | $400.00 | $400.00 | $400.00 | $400.00 |
| 0121 | Luminaire, remove and relocate (807-91082) | EACH | 2 | $5,000.00 | $5,000.00 | $5,000.00 | $5,000.00 |
| 0122 | Transverse marking, thermoplastic, crosswalk line, white, 24 in. (808-03439) | LFT | 589 | $7.34 | $5.95 | $7.34 | $12.00 |
| 0123 | Grooving for pavement markings (808-12032) | LFT | 229,067 | $0.40 | $0.34 | $0.40 | $0.40 |
| 0124 | Transverse marking, thermoplastic, yield line, white, 36 in. (808-12148) | LFT | 36 | $17.28 | $7.95 | $17.28 | $50.00 |
| 0125 | Line, thermoplastic, solid, white, 6 in. (808-75043) | LFT | 113,038 | $0.82 | $0.95 | $0.82 | $1.00 |
| 0126 | Transverse marking, paint, crosswalk line, white, 6 in. (808-75100) | LFT | 34 | $2.00 | $4.95 | $2.00 | $30.00 |
| 0127 | Line, thermoplastic, solid, yellow, 6 in. (808-75247) | LFT | 112,169 | $0.82 | $0.95 | $0.82 | $1.00 |
| 0128 | Transverse marking, thermoplastic, stop line, white, 24 in. (808-75297) | LFT | 1,216 | $7.34 | $5.95 | $7.34 | $12.00 |
| 0129 | Transverse marking, thermoplastic, crosswalk line, white, 6 in. (808-75300) | LFT | 3,543 | $1.84 | $1.45 | $1.84 | $3.00 |
| 0130 | Pavement message marking, thermoplastic, lane indication arrow (808-75320) | EACH | 76 | $152.00 | $85.00 | $152.00 | $100.00 |
| 0131 | Pavement message marking, thermoplastic, RXR (808-75340) | EACH | 2 | $679.00 | $595.00 | $679.00 | $1,000.00 |
| 0132 | Snowplowable raised pavement marker, remove (808-75996) | EACH | 1,587 | $18.35 | $10.00 | $5.00 | $12.00 |
| 0133 | Snowplowable raised pavement marker (808-75998) | EACH | 1,587 | $32.55 | $29.95 | $30.00 | $40.00 |
| 0134 | Line, thermoplastic, broken, white, 6 in. (808-96075) | LFT | 280 | $1.42 | $1.45 | $1.42 | $1.00 |
| 0135 | Line, thermoplastic, broken, yellow, 6 in. (808-96078) | LFT | 3,580 | $1.40 | $1.30 | $1.40 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from INDOT's tabulation for this contract. INDOT Unit Tab Results (AASHTOWare Tabulation of Bids PDFs), one per letting, January 2022 to November 2026. Bids that did not match their published total, mostly large contracts with alternate sets, are left out.
Every contract let that day: INDOT letting of January 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.