MoDOT contract 250117-H01 bid tabulation
J9P3308 - ROUTE 74 - CAPE GIRARDEAU COUNTY. Let by Missouri DOT on January 17, 2025, Cape Girardeau, Southeast. 6 bids received; low bid $16,454,288 by Concrete Strategies, LLC.
- Owner
- Missouri DOT
- Letting
- 17 JAN 2025
- Pay items
- 64
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Concrete Strategies, LLC | $16,454,288 | Low |
| 2 | Freyssinet, Inc. | $17,898,125 | +9.0% |
| 3 | American Civil Constructors West Coast, | $19,800,000 | +20% |
| 4 | Southern Road & Bridge, LLC | $20,418,196 | +24% |
| 5 | Massman Construction Co. | $20,519,595 | +25% |
| 6 | KCI Construction Company | $21,934,655 | +33% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Concrete Strategies, LLC | 2. Freyssinet, Inc. | 3. American Civil Constructors West Coast, | 4. Southern Road & Bridge, LLC | 5. Massman Construction Co. | 6. KCI Construction Company |
|---|---|---|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $16,000 | $27,100 | $24,000 | $250,000 | $17,756 | $84,311 |
| 0030 | 6 in. concrete median strip (6083006) | SY | 48 | $122.00 | $216.00 | $300.00 | $325.00 | $100.00 | $700.00 |
| 0040 | Replacement sand barrel (6122020) | EACH | 20 | $492.00 | $657.00 | $374.00 | $5,000.00 | $381.63 | $342.69 |
| 0050 | Construction signs (6161005) | SF | 1,723 | $8.50 | $11.50 | $10.00 | $10.00 | $10.20 | $8.57 |
| 0060 | Advanced warning rail system (6161008) | EACH | 3 | $63.50 | $84.50 | $35.00 | $68.00 | $35.71 | $51.40 |
| 0070 | Channelizer (trim line) (6161025) | EACH | 150 | $24.00 | $32.00 | $22.00 | $30.00 | $22.45 | $22.85 |
| 0080 | Type III moveable barricade (6161030) | EACH | 23 | $162.00 | $216.00 | $155.00 | $195.00 | $158.16 | $199.90 |
| 0090 | Directional indicator barricade (6161033) | EACH | 28 | $91.00 | $123.00 | $125.00 | $125.00 | $158.16 | $85.67 |
| 0100 | Flashing arrow panel (6161040) | EACH | 2 | $1,094.00 | $1,460.00 | $1,000.00 | $2,000.00 | $1,020.41 | $1,999.00 |
| 0110 | Sequential flashing warning light (6161055) | EACH | 28 | $107.00 | $143.00 | $125.00 | $125.00 | $127.55 | $125.65 |
| 0120 | Tubular marker (6161070) | EACH | 288 | $93.00 | $36.50 | $75.00 | $135.00 | $76.53 | $56.11 |
| 0130 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 2 | $4,488.50 | $2,920.00 | $17,500 | $6,500.00 | $5,102.04 | $6,282.56 |
| 0140 | Mobilization (6181000) | LS | 1 | $2,366,822 | $1,785,000 | $1,900,000 | $2,000,000 | $1,950,000 | $2,300,000 |
| 0150 | Railroad plan submittal (6181015) | LS | 1 | $293,000 | $21,900 | $15,000 | $6,500.00 | $719,278 | $70,000 |
| 0160 | Preformed thermoplastic pavement marking, 6 in. white (6200009) | LF | 168 | $6.50 | $8.00 | $6.00 | $10.00 | $6.12 | $6.39 |
| 0170 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 58 | $24.00 | $33.50 | $25.00 | $25.00 | $25.51 | $23.41 |
| 0180 | Preformed thermoplastic pavement marking, 24 in. yellow (6200018) | LF | 893 | $24.00 | $26.50 | $20.00 | $25.00 | $20.41 | $23.41 |
| 0190 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 5 | $355.75 | $400.00 | $300.00 | $850.00 | $306.12 | $345.86 |
| 0200 | Preformed thermoplastic pavement marking, word (only) (6200030) | EACH | 2 | $438.00 | $600.00 | $450.00 | $1,150.00 | $459.19 | $425.67 |
| 0210 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 17,964 | $0.37 | $0.53 | $0.40 | $1.50 | $0.41 | $0.36 |
| 0220 | 6 in. yellow high build waterborne pavement marking paint, type L beads (6205903A) | LF | 15,272 | $0.37 | $0.53 | $0.40 | $1.50 | $0.41 | $0.36 |
| 0230 | Pavement marking removal (6207001) | LF | 53,062 | $0.55 | $1.05 | $0.80 | $0.45 | $0.82 | $0.53 |
| 0240 | Pavement marking removal (symbols) (6207002) | EACH | 7 | $82.00 | $133.00 | $100.00 | $450.00 | $102.04 | $79.81 |
| 0250 | 4 in temporary pavement marking paint (6208076) | LF | 39,907 | $0.24 | $1.05 | $0.80 | $0.45 | $0.82 | $0.23 |
| 0260 | Contractor furnished surveying and staking (6274000) | LS | 1 | $10,900 | $43,800 | $25,000 | $25,000 | $30,000 | $5,000.00 |
| 0270 | MGS guardrail (6061060) | LF | 750 | $30.50 | $47.00 | $28.00 | $35.00 | $28.28 | $28.00 |
| 0280 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 2 | $4,597.00 | $6,850.00 | $4,200.00 | $5,000.00 | $4,242.43 | $4,200.00 |
| 0290 | MGS end anchor (6061080) | EACH | 1 | $2,298.00 | $2,805.00 | $2,100.00 | $2,200.00 | $2,121.21 | $2,100.00 |
| 0300 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 1 | $4,160.00 | $6,845.00 | $3,800.00 | $4,500.00 | $3,838.38 | $3,800.00 |
| 0310 | Type C crashworthy end terminal (MASH) (6063020) | EACH | 1 | $28,463 | $48,450 | $32,000 | $45,000 | $32,323 | $26,000 |
| 0320 | 2 in. PSST post - 12 GA. (9031270A) | LF | 14 | $32.75 | $55.00 | $30.00 | $50.00 | $30.00 | $30.00 |
| 0330 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 1 | $137.00 | $278.00 | $125.00 | $225.00 | $125.00 | $125.00 |
| 0340 | SH-flat sheet (9035004A) | SF | 9 | $39.50 | $35.00 | $36.00 | $45.00 | $36.00 | $36.00 |
| 0350 | Removal of concrete wearing surface (2161502) | SF | 187,045 | $5.75 | $8.50 | $15.00 | $6.00 | $7.96 | $25.20 |
| 0360 | Removal of existing expansion joint & adjacent concrete (2164500) | LF | 83 | $1,120.00 | $1,870.00 | $2,500.00 | $250.00 | $1,439.69 | $2,500.00 |
| 0370 | Misc.removal of existing bearings (2169902) | EACH | 4 | $54,000 | $51,950 | $50,000 | $15,000 | $106,316 | $175,000 |
| 0380 | Misc.remove and replace barrier (2169903) | LF | 31 | $3,400.00 | $4,375.00 | $2,250.00 | $1,950.00 | $4,865.41 | $2,000.00 |
| 0390 | Misc.furnish polyester polymer concrete wearing surface (5029907) | CY | 1,910 | $3,009.00 | $3,150.00 | $2,750.00 | $3,325.00 | $2,864.62 | $3,010.00 |
| 0400 | Misc.place polyester polymer concrete wearing surface (5059905) | SY | 20,783 | $33.75 | $87.00 | $86.00 | $85.00 | $70.13 | $50.00 |
| 0410 | Penetrating concrete sealer (7033013) | SY | 489 | $15.50 | $21.50 | $40.00 | $45.00 | $26.98 | $31.00 |
| 0420 | Misc.sealer for PPC wearing surface (7039903) | LF | 12,682 | $4.25 | $13.00 | $3.25 | $6.00 | $3.24 | $4.00 |
| 0430 | Substructure repair (unformed) (7040102) | SF | 800 | $388.00 | $310.00 | $300.00 | $795.00 | $570.63 | $360.00 |
| 0440 | Epoxy pressure injecting (7040110) | LF | 1,800 | $108.00 | $136.00 | $200.00 | $148.00 | $251.71 | $100.00 |
| 0450 | Misc.replace conduit and junction boxes (7079901) | LS | 1 | $24,100 | $32,100 | $40,000 | $68,500 | $27,236 | $116,095 |
| 0460 | Protective coating - concrete bents and piers (epoxy) (7110200) | LS | 1 | $131,500 | $228,400 | $150,000 | $650,000 | $121,137 | $120,000 |
| 0470 | Surface preparation for recoating structural steel (7125200) | SF | 24,400 | $62.50 | $42.50 | $70.00 | $32.00 | $57.54 | $57.00 |
| 0480 | Field application of inorganic zinc primer (7125210) | SF | 24,400 | $2.25 | $16.00 | $3.50 | $22.00 | $2.02 | $2.00 |
| 0490 | Intermediate field coat (system G) (7125365A) | SF | 24,400 | $2.25 | $8.05 | $3.50 | $22.00 | $2.02 | $2.00 |
| 0500 | Finish field coat (system G) (7125370A) | SF | 24,400 | $2.25 | $8.05 | $3.50 | $15.00 | $2.02 | $2.00 |
| 0510 | Misc.repair restrainer cable sheath (7129901) | LS | 1 | $32,111 | $26,400 | $52,424 | $155,000 | $52,634 | $30,000 |
| 0520 | Misc.reset cable ties (7129901) | LS | 1 | $1,026,158 | $725,500 | $1,350,000 | $485,000 | $1,500,000 | $1,300,000 |
| 0530 | Misc.remove and replace modular joint control springs (7129902) | EACH | 96 | $1,427.00 | $388.00 | $1,000.00 | $3,250.00 | $1,970.00 | $1,464.37 |
| 0540 | Misc.remove and replace modular joint hold down springs (7129902) | EACH | 11 | $2,925.00 | $2,305.00 | $4,000.00 | $9,500.00 | $4,678.51 | $5,000.00 |
| 0550 | Misc.remove and replace shock transmission unit (7129902) | EACH | 1 | $606,000 | $602,600 | $1,000,000 | $315,000 | $1,547,144 | $300,000 |
| 0560 | Misc.remove and replace tower inspection hatch door hinges (7129902) | EACH | 2 | $3,560.00 | $728.00 | $3,000.00 | $19,250 | $18,814 | $2,726.00 |
| 0570 | Misc.repair cable protective sheathing (7129903) | LF | 20 | $1,845.00 | $901.00 | $3,000.00 | $1,250.00 | $303.21 | $8,800.00 |
| 0580 | Misc.HLMR bearing (7169902) | EACH | 4 | $65,405 | $54,000 | $50,000 | $95,000 | $110,398 | $200,000 |
| 0590 | Misc.clean expansion joint (7179903) | LF | 329 | $179.00 | $49.50 | $100.00 | $500.00 | $27.80 | $98.00 |
| 0600 | Misc.modular expansion joint system (7179903) | LF | 83 | $5,200.00 | $6,350.00 | $12,000 | $15,000 | $15,545 | $12,000 |
| 0610 | Misc.remove and replace modular joint seal (7179903) | LF | 80 | $643.00 | $507.00 | $800.00 | $1,250.00 | $775.96 | $578.00 |
| 0620 | Navigation lighting system (9019300) | LS | 1 | $17,500 | $22,450 | $40,000 | $125,000 | $19,883 | $22,328 |
| 0630 | Bridge lighting (9019301) | LS | 1 | $473,000 | $740,100 | $425,000 | $795,000 | $535,053 | $513,770 |
| 0640 | Misc.aviation lighting system (9019901) | LS | 1 | $17,500 | $23,450 | $40,000 | $150,000 | $20,000 | $38,316 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of January 17, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.