MoDOT contract 250221-C02 bid tabulation
JKR0136, JKR0137 - ROUTES 50, BUS 50 - JOHNSON COUNTY. Let by Missouri DOT on February 21, 2025, Johnson, Kansas City. 3 bids received; low bid $9,062,330 by Clarkson Construction Company.
- Owner
- Missouri DOT
- Letting
- 21 FEB 2025
- Pay items
- 151
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Clarkson Construction Company | $9,062,330 | Low |
| 2 | Radmacher Brothers Excavating Co., Inc. | $9,632,962 | +6.0% |
| 3 | Amino Bros. Co., Inc. | $9,926,210 | +10% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Clarkson Construction Company | 2. Radmacher Brothers Excavating Co., Inc. | 3. Amino Bros. Co., Inc. |
|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Clearing and grubbing (2013000) | ACRE | 2 | $3,600.00 | $8,244.00 | $7,436.00 |
| 0030 | Removal of improvements (2022010) | LS | 1 | $360,000 | $257,783 | $386,829 |
| 0040 | Unclassified excavation (2035000) | CY | 23,117 | $16.00 | $10.30 | $47.70 |
| 0050 | Embankment in place (2035500) | CY | 1,310 | $6.75 | $18.35 | $29.70 |
| 0060 | Compacting embankment (2036000) | CY | 14,718 | $1.00 | $1.65 | $0.10 |
| 0070 | Compacting in cut (2037075) | STA | 10.20 | $1,400.00 | $2,715.50 | $2,764.00 |
| 0080 | Class 3 excavation (2063000) | CY | 1,537 | $15.00 | $18.60 | $13.45 |
| 0090 | Culvert cleanout (2063500) | EACH | 1 | $4,000.00 | $2,451.00 | $4,066.00 |
| 0100 | Linear grading class 1 (2071000) | STA | 19.20 | $1,125.00 | $2,376.00 | $1,117.00 |
| 0110 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 227 | $370.00 | $348.00 | $131.00 |
| 0120 | Type 5 aggregate for base (4 in. thick) (3040504) | SY | 2,255 | $9.00 | $11.25 | $13.60 |
| 0130 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 49,981 | $12.00 | $14.95 | $17.30 |
| 0140 | Misc.optional pavement (4019905) | SY | 2,254.70 | $78.00 | $75.05 | $62.90 |
| 0150 | Pipe collar, type A (6044011) | EACH | 9 | $450.00 | $2,694.50 | $1,619.00 |
| 0160 | 6 in. concrete median strip (6083006) | SY | 160.80 | $123.00 | $69.70 | $75.60 |
| 0170 | Rock lining (6097000) | CY | 6 | $230.00 | $123.00 | $157.00 |
| 0180 | Manhole frame and cover, type 2 (6143012) | EACH | 1 | $2,400.00 | $1,110.50 | $557.00 |
| 0190 | Construction signs (6161005) | SF | 1,520 | $7.30 | $7.80 | $7.50 |
| 0200 | Advanced warning rail system (6161008) | EACH | 12 | $61.00 | $83.50 | $52.00 |
| 0210 | Channelizer (trim line) (6161025) | EACH | 170 | $24.75 | $33.40 | $20.80 |
| 0220 | Type III moveable barricade (6161030) | EACH | 33 | $190.00 | $206.00 | $191.00 |
| 0230 | Directional indicator barricade (6161033) | EACH | 28 | $95.00 | $100.25 | $97.05 |
| 0240 | Flashing arrow panel (6161040) | EACH | 2 | $4,000.00 | $2,226.50 | $3,461.00 |
| 0250 | Sequential flashing warning light (6161055) | EACH | 28 | $107.00 | $111.25 | $85.50 |
| 0260 | Tubular marker (6161070) | EACH | 216 | $95.00 | $66.80 | $98.20 |
| 0270 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 8 | $5,600.00 | $8,222.00 | $5,776.00 |
| 0280 | Mobilization (6181000) | LS | 1 | $731,185 | $362,084 | $307,789 |
| 0290 | Additional mobilization for seeding (6181020) | EACH | 4 | $600.00 | $600.00 | $600.00 |
| 0300 | Pavement edge treatment (6191000) | LF | 23,922 | $2.00 | $7.50 | $6.30 |
| 0310 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 220 | $21.00 | $27.85 | $23.10 |
| 0320 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 44 | $300.00 | $289.50 | $318.00 |
| 0330 | Preformed thermoplastic pavement marking, 12 in white, yield line triangles (6200042) | EACH | 48 | $50.00 | $31.15 | $52.00 |
| 0340 | Temporary removable marking tape 4 in., white (6205301B) | LF | 9,409 | $2.25 | $2.15 | $2.30 |
| 0350 | Temporary removable marking tape 4 in., yellow (6205303B) | LF | 18,072 | $2.25 | $2.15 | $2.30 |
| 0360 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 14,277 | $1.11 | $0.50 | $0.30 |
| 0370 | 6 in. yellow high build waterborne pavement marking paint, type L beads (6205903A) | LF | 16,373 | $0.30 | $0.50 | $0.30 |
| 0380 | 12 in. white high build waterborne pavement marking paint, type L beads (6205906A) | LF | 6,573 | $0.60 | $1.40 | $0.60 |
| 0390 | Pavement marking removal (6207001) | LF | 1,764 | $0.70 | $2.75 | $0.70 |
| 0400 | 4 in temporary pavement marking paint (6208076) | LF | 1,764 | $0.30 | $1.95 | $0.30 |
| 0410 | Contractor furnished surveying and staking (6274000) | LS | 1 | $90,000 | $47,161 | $48,461 |
| 0420 | 15 in. pipe group B (7250315A) | LF | 679 | $57.00 | $94.30 | $60.50 |
| 0430 | 15 in. pipe group A (7261015) | LF | 231 | $57.00 | $128.75 | $68.75 |
| 0440 | 18 in. pipe group A (7261018) | LF | 1,290 | $62.00 | $100.25 | $77.20 |
| 0450 | 24 in. pipe group A (7261024) | LF | 14 | $67.00 | $120.25 | $134.00 |
| 0460 | 30 in. pipe group A (7261030) | LF | 25 | $96.00 | $140.25 | $127.00 |
| 0470 | 36 in. pipe group A (7261036) | LF | 109 | $126.00 | $158.50 | $136.00 |
| 0480 | Precast concrete drop inlet 5 FT X 3 FT (7311053) | FT | 51 | $1,459.00 | $1,652.50 | $1,061.00 |
| 0490 | 15 in. or allowed substitute group A flared end section (7320615A) | EACH | 6 | $625.00 | $2,998.50 | $713.00 |
| 0500 | 18 in. or allowed substitute group A flared end section (7320618A) | EACH | 19 | $675.00 | $1,215.00 | $789.00 |
| 0510 | 24 in. or allowed substitute group A flared end section (7320624A) | EACH | 1 | $800.00 | $1,423.50 | $1,007.00 |
| 0520 | 30 in. or allowed substitute group A flared end section (7320630A) | EACH | 1 | $1,100.00 | $1,903.00 | $1,285.00 |
| 0530 | 36 in. or allowed substitute group A flared end section (7320636A) | EACH | 3 | $1,500.00 | $2,348.00 | $1,723.00 |
| 0540 | Mulching (8025006) | ACRE | 11 | $2,000.00 | $334.00 | $343.00 |
| 0550 | Seeding - cool season grasses (8051000A) | ACRE | 11 | $1,600.00 | $2,171.00 | $2,231.00 |
| 0560 | Sediment trap rock (8061004) | CY | 15 | $70.00 | $87.40 | $157.00 |
| 0570 | Rock ditch check (8061005) | LF | 795 | $14.00 | $26.20 | $36.05 |
| 0580 | Alternate ditch check (8061006) | LF | 1,926 | $10.00 | $7.30 | $7.50 |
| 0590 | Sediment removal (8061016) | CY | 275 | $28.00 | $30.25 | $26.30 |
| 0600 | Temporary seeding (8061017) | ACRE | 2.80 | $900.00 | $1,336.00 | $1,373.00 |
| 0610 | Silt fence (8061019) | LF | 8,495 | $3.00 | $1.75 | $1.75 |
| 0620 | Type 2A erosion control blanket (8064135) | SY | 53,010 | $2.00 | $1.50 | $1.55 |
| 0630 | Lighting pole, 45 FT. or 13.5 M, type at design 2 (9011062) | EACH | 14 | $3,800.00 | $3,961.50 | $4,101.00 |
| 0640 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 14 | $1,150.00 | $1,232.50 | $1,276.00 |
| 0650 | Luminaire, LED-B (9011312) | EACH | 14 | $830.00 | $901.75 | $934.00 |
| 0660 | Conduit, 4 in. rigid, pushed (9014004) | LF | 1,660 | $26.00 | $28.40 | $29.40 |
| 0670 | Pull box, preformed class 1 (9016110) | EACH | 25 | $2,150.00 | $2,334.50 | $2,417.00 |
| 0680 | Pull box, preformed class 2 (9016111) | EACH | 5 | $2,400.00 | $2,628.50 | $2,721.00 |
| 0690 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 1,680 | $1.90 | $2.00 | $2.05 |
| 0700 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 8 AWG (9017407) | LF | 11,690 | $8.00 | $8.35 | $8.65 |
| 0710 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 14 | $2,800.00 | $2,985.00 | $3,090.00 |
| 0720 | Power supply assembly, type 2, 240/120 volt service, lighting only (9018612) | EACH | 3 | $7,100.00 | $7,786.00 | $8,061.00 |
| 0730 | Concrete footings, embedded (9031010) | CY | 5.70 | $1,225.00 | $1,299.50 | $1,349.00 |
| 0740 | Structural steel posts (9031210) | LB | 2,490 | $14.50 | $15.65 | $16.25 |
| 0750 | Pipe posts (9031220) | LB | 2,800 | $6.75 | $7.25 | $7.50 |
| 0760 | 2 in. PSST post - 12 GA. (9031270A) | LF | 2,040 | $13.00 | $13.95 | $14.50 |
| 0770 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 136 | $105.00 | $109.25 | $113.00 |
| 0780 | 2.5 in. PSST post - 12 GA. (9031280) | LF | 420 | $21.00 | $22.60 | $23.45 |
| 0790 | Driven post anchor for 2.5 in. PSST - 7 GA. (9031281A) | EACH | 28 | $280.00 | $299.00 | $310.00 |
| 0800 | SH-flat sheet (9035004A) | SF | 1,992 | $12.50 | $13.55 | $14.05 |
| 0810 | SHF-flat sheet fluorescent (9035069A) | SF | 27 | $68.00 | $73.90 | $76.70 |
| 0830 | Concrete pavement (9 1/2 in. non-reinforced, 15 FT. joints) (5021333) | SY | 3,692.80 | $78.00 | $93.70 | $84.30 |
| 0860 | Type A2 shoulder (5021340) | SY | 1,025.70 | $63.00 | $89.60 | $60.05 |
| 0870 | Portland cement concrete shoulder rumble strip (6262000A) | STA | 16.90 | $490.00 | $645.75 | $172.00 |
| 0890 | Concrete pavement (8 in. non-reinforced, 15 FT. joints) (5021308) | SY | 35,497.50 | $77.00 | $78.55 | $78.80 |
| 0910 | Type A2 shoulder (5021340) | SY | 9,764.40 | $66.00 | $85.70 | $54.00 |
| 0920 | Removal of improvements (2022010) | LS | 1 | $55,000 | $48,988 | $78,584 |
| 0930 | Unclassified excavation (2035000) | CY | 5,303 | $15.00 | $10.30 | $47.70 |
| 0940 | Compacting embankment (2036000) | CY | 3,800 | $0.01 | $1.65 | $0.10 |
| 0950 | Compacting in cut (2037075) | STA | 8.40 | $1,000.00 | $2,715.50 | $3,170.00 |
| 0960 | Class 3 excavation (2063000) | CY | 189 | $15.00 | $18.60 | $13.50 |
| 0970 | Culvert cleanout (2063500) | EACH | 1 | $4,000.00 | $2,451.00 | $3,969.00 |
| 0980 | Subgrade compaction (6-inch depth) (2101006A) | 100F | 47 | $380.00 | $348.00 | $147.00 |
| 0990 | Type 5 aggregate for base (6 in. thick) (3040506) | SY | 11,352 | $11.00 | $14.95 | $17.40 |
| 1000 | Pipe collar, type A (6044011) | EACH | 3 | $450.00 | $2,694.50 | $1,619.00 |
| 1010 | 6 in. concrete median strip (6083006) | SY | 517 | $115.00 | $70.00 | $71.20 |
| 1020 | Rock lining (6097000) | CY | 2 | $200.00 | $122.50 | $158.00 |
| 1030 | Construction signs (6161005) | SF | 834 | $6.75 | $7.80 | $7.50 |
| 1040 | Advanced warning rail system (6161008) | EACH | 6 | $46.00 | $83.50 | $52.00 |
| 1050 | Channelizer (trim line) (6161025) | EACH | 44 | $18.50 | $33.40 | $20.80 |
| 1060 | Type III moveable barricade (6161030) | EACH | 9 | $170.00 | $206.00 | $191.00 |
| 1070 | Directional indicator barricade (6161033) | EACH | 28 | $85.00 | $100.25 | $97.05 |
| 1080 | Flashing arrow panel (6161040) | EACH | 2 | $3,100.00 | $2,226.50 | $3,461.00 |
| 1090 | Sequential flashing warning light (6161055) | EACH | 28 | $80.00 | $111.25 | $85.50 |
| 1100 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 6 | $5,100.00 | $7,554.00 | $5,776.00 |
| 1110 | Mobilization (6181000) | LS | 1 | $25,000 | $322,907 | $48,598 |
| 1120 | Additional mobilization for seeding (6181020) | EACH | 1 | $600.00 | $600.00 | $600.00 |
| 1130 | Pavement edge treatment (6191000) | LF | 4,996 | $9.00 | $7.50 | $6.30 |
| 1140 | Preformed thermoplastic pavement marking, 24 in. white (6200015) | LF | 12 | $20.50 | $38.95 | $23.10 |
| 1150 | Preformed thermoplastic pavement marking, left/right arrow (6200021) | EACH | 4 | $300.00 | $389.75 | $318.00 |
| 1160 | 6 in. white high build waterborne pavement marking paint, type L beads (6205902A) | LF | 4,038 | $1.11 | $0.55 | $0.30 |
| 1170 | 6 in. yellow high build waterborne pavement marking paint, type L beads (6205903A) | LF | 2,624 | $0.30 | $0.55 | $0.30 |
| 1180 | 12 in. white high build waterborne pavement marking paint, type L beads (6205906A) | LF | 1,676 | $0.60 | $1.75 | $0.60 |
| 1190 | Contractor furnished surveying and staking (6274000) | LS | 1 | $17,000 | $9,686.00 | $9,953.00 |
| 1200 | 18 in. pipe group A (7261018) | LF | 188 | $62.00 | $105.00 | $78.45 |
| 1210 | 30 in. pipe group A (7261030) | LF | 17 | $96.00 | $140.50 | $145.00 |
| 1220 | 36 in. pipe group A (7261036) | LF | 14 | $126.00 | $159.25 | $165.00 |
| 1230 | 18 in. or allowed substitute group A flared end section (7320618A) | EACH | 3 | $675.00 | $1,232.00 | $789.00 |
| 1240 | 30 in. or allowed substitute group A flared end section (7320630A) | EACH | 1 | $1,100.00 | $1,903.00 | $1,285.00 |
| 1250 | 36 in. or allowed substitute group A flared end section (7320636A) | EACH | 1 | $1,500.00 | $2,349.00 | $1,723.00 |
| 1260 | Mulching (8025006) | ACRE | 1.30 | $1,800.00 | $556.75 | $572.00 |
| 1270 | Seeding - cool season grasses (8051000A) | ACRE | 1.30 | $1,700.00 | $2,783.50 | $2,860.00 |
| 1280 | Sediment trap rock (8061004) | CY | 2 | $60.00 | $87.65 | $403.00 |
| 1290 | Rock ditch check (8061005) | LF | 150 | $14.00 | $26.20 | $36.05 |
| 1300 | Alternate ditch check (8061006) | LF | 360 | $10.00 | $9.00 | $9.25 |
| 1310 | Curb inlet check (8061007A) | EACH | 2 | $220.00 | $222.75 | $229.00 |
| 1320 | Sediment removal (8061016) | CY | 68 | $27.00 | $30.25 | $26.30 |
| 1330 | Temporary seeding (8061017) | ACRE | 0.30 | $11,000 | $4,453.50 | $4,576.00 |
| 1340 | Silt fence (8061019) | LF | 1,328 | $2.90 | $2.10 | $2.20 |
| 1350 | Type 2A erosion control blanket (8064135) | SY | 6,292 | $2.00 | $1.55 | $1.60 |
| 1360 | MGS guardrail (6061060) | LF | 550 | $29.00 | $31.80 | $33.00 |
| 1370 | MGS end anchor (6061080) | EACH | 1 | $2,600.00 | $2,814.50 | $2,921.00 |
| 1380 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 2 | $3,750.00 | $4,071.50 | $4,226.00 |
| 1390 | Lighting pole, 45 FT. or 13.5 M, type at design 2 (9011062) | EACH | 4 | $3,750.00 | $3,961.50 | $4,101.00 |
| 1400 | Bracket arm, 15 FT. or 4.6 M (9011115) | EACH | 4 | $1,200.00 | $1,232.50 | $1,276.00 |
| 1410 | Luminaire, LED-B (9011312) | EACH | 4 | $850.00 | $901.75 | $934.00 |
| 1420 | Conduit, 3 in. rigid, pushed (9014003) | LF | 348 | $29.50 | $32.30 | $33.45 |
| 1430 | Pull box, preformed class 1 (9016110) | EACH | 1 | $3,300.00 | $3,552.50 | $3,678.00 |
| 1440 | Cable, 10 AWG 1 conductor, pole and bracket (9017110) | LF | 480 | $13.50 | $14.70 | $15.20 |
| 1450 | Cable-conduit, 1 in., 2 conductors and 1 bare neutral, 8 AWG (9017407) | LF | 1,300 | $9.00 | $9.70 | $10.05 |
| 1460 | Pole foundation (45 FT. or 13.5 M mounting height) (9018245) | EACH | 4 | $2,800.00 | $2,985.00 | $3,090.00 |
| 1470 | Power supply assembly, type 2, 240/120 volt service, lighting only (9018612) | EACH | 1 | $7,000.00 | $7,545.00 | $7,812.00 |
| 1480 | Concrete footings, embedded (9031010) | CY | 0.70 | $3,500.00 | $3,647.50 | $3,786.00 |
| 1490 | Structural steel posts (9031210) | LB | 700 | $7.50 | $7.90 | $8.20 |
| 1500 | Pipe posts (9031220) | LB | 160 | $13.00 | $13.75 | $14.30 |
| 1510 | 2 in. PSST post - 12 GA. (9031270A) | LF | 540 | $18.00 | $19.05 | $19.80 |
| 1520 | Driven post anchor for 2 in. PSST - 12 GA. (9031271A) | EACH | 36 | $170.00 | $184.75 | $192.00 |
| 1530 | SH-flat sheet (9035004A) | SF | 437 | $19.00 | $19.90 | $20.70 |
| 1540 | SHF-flat sheet fluorescent (9035069A) | SF | 18 | $85.00 | $89.30 | $92.70 |
| 1560 | Concrete pavement (8 in. non-reinforced, 15 FT. joints) (5021308) | SY | 8,773.10 | $78.00 | $78.70 | $79.65 |
| 1580 | Type A2 shoulder (5021340) | SY | 2,579.30 | $73.00 | $88.20 | $57.70 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of February 21, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.