MoDOT contract 250221-H01 bid tabulation

J9P3605, J9P3697, J9S3695 - ROUTES 5, F - WRIGHT, DOUGLAS, LACLEDE COUNTIES. Let by Missouri DOT on February 21, 2025, Wright, Southeast. 3 bids received; low bid $13,367,024 by APAC-Central, Inc..

Owner
Missouri DOT
Letting
21 FEB 2025
Pay items
89
Data through
16 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1APAC-Central, Inc.$13,367,024Low
2Pace Construction Company, LLC$13,765,000+3.0%
3Capital Paving & Construction, LLC$16,155,000+21%
MoDOT contract 250221-H01: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. APAC-Central, Inc.2. Pace Construction Company, LLC3. Capital Paving & Construction, LLC
0010Signet dbe reporting (1081000)LS1$1,000.00$1,000.00$1,000.00
0020Removal of improvements (2022010)LS1$171,597$157,136$162,153
0030Misc.modified shaping slopes class III (2159903)LF7,760$14.40$14.24$14.20
0040Misc.permanent aggregate edge treatment (3049910)TON3,216.60$48.40$52.25$65.00
0050Gravel (A) or crushed stone (B) (3105002)TON111$59.80$35.00$65.00
0060Bituminous pavement mixture PG64-22, (BP-1) (4011209)TON24,847.30$81.10$73.00$104.00
0070Asphaltic concrete mixture PG 64-22 (SP125C mix) (4030101)TON30,136.20$83.70$86.75$110.00
0080Tack coat (4071005)GAL32,445$2.75$2.65$2.60
00903 in. concrete median strip (6083003)SY18.60$232.40$320.00$320.00
0100Construction signs (6161005)SF1,984$9.25$6.00$9.00
0110Channelizer (trim line) (6161025)EACH250$18.45$22.00$18.00
0120Mobilization (6181000)LS1$123,975$385,000$270,348
0130Preformed thermoplastic pavement marking, 24 in. white (6200015)LF222$20.50$26.00$20.00
0140Preformed thermoplastic pavement marking, 24 in. yellow (6200018)LF326$20.50$26.00$20.00
0150Preformed thermoplastic pavement marking, left/right arrow (6200021)EACH15$287.20$331.00$280.00
01604 in. white standard waterborne pavement marking paint, type P beads (6206000C)LF189,523$0.13$0.13$0.13
01704 in. yellow standard waterborne pavement marking paint, type P beads (6206001C)LF104,158$0.13$0.10$0.13
0180Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY3,734$8.23$9.40$5.00
0190Modified coldmilling (depth transitions) (6224010)SY7,293$5.00$3.85$12.00
0200Bituminous shoulder rumble strip (6261000A)STA1,438.20$23.80$30.90$11.50
0210MGS guardrail (6061060)LF31,075$22.85$22.63$23.92
0220MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061)LF9,500$26.45$26.20$27.83
0230MGS height and block transition (6061074)EACH4$870.40$861.71$897.97
0240MGS end anchor (6061080)EACH19$1,744.45$1,727.02$1,791.80
0250Type A crashworthy end terminal (MASH) (6063014)EACH97$3,017.20$2,987.02$3,182.56
0260Cable, loop detector, in duct (9028500)LF1,310$6.50$6.00$6.00
0270Concrete footings, embedded (9031010)CY0.70$2,330.00$2,295.00$8,971.32
0280Pipe posts (9031220)LB350$13.50$13.30$17.44
0290SH-flat sheet (9035004A)SF277$19.30$19.00$20.73
0300SHF-flat sheet fluorescent (9035069A)SF18$20.90$183.00$69.05
0310Removal of improvements (2022010)LS1$9,566.00$10,500$9,261.49
0320Misc.modified shaping slopes class III (2159903)LF800$14.40$14.24$14.20
0330Misc.permanent aggregate edge treatment (3049910)TON5,556.60$31.40$34.75$45.00
0340Gravel (A) or crushed stone (B) (3105002)TON224$65.45$33.75$45.00
0350Bituminous pavement mixture PG64-22, (BP-2) (4011211)TON45,007.70$78.55$79.75$90.00
0360Tack coat (4071005)GAL35,823$2.75$2.85$2.60
0370Construction signs (6161005)SF2,735$9.25$6.00$9.00
0380Channelizer (trim line) (6161025)EACH250$18.50$22.00$18.00
0390Mobilization (6181000)LS1$52,800$170,000$165,000
0400Preformed thermoplastic pavement marking, 24 in. white (6200015)LF48$20.50$26.00$20.00
04104 in. white standard waterborne pavement marking paint, type P beads (6206000C)LF317,360$0.13$0.13$0.13
04204 in. yellow standard waterborne pavement marking paint, type P beads (6206001C)LF274,794$0.13$0.10$0.13
0430Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY7,091$5.60$6.25$6.00
0440Modified coldmilling (depth transitions) (6224010)SY6,814$5.70$5.70$12.00
0450Bituminous shoulder rumble strip (6261000A)STA2,083.20$22.60$30.25$11.50
0460MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061)LF588$25.85$25.59$26.77
0470MGS bridge approach transition section (regular/no curb) (6061069)EACH10$3,500.00$3,464.99$3,522.12
0480Type A crashworthy end terminal (MASH) (6063014)EACH10$3,163.00$3,131.31$3,326.46
0490SH-flat sheet (9035004A)SF201$19.30$19.00$77.01
0500SHF-flat sheet fluorescent (9035069A)SF155$20.90$20.60$78.13
0510Removal of improvements (2022010)LS1$28,713$15,000$21,054
0520Misc.modified shaping slopes class III (2159903)LF1,520$14.35$14.21$14.17
0530Misc.permanent aggregate edge treatment (3049910)TON4,192.20$31.20$38.25$55.00
0540Gravel (A) or crushed stone (B) (3105002)TON118$78.25$35.25$55.00
0550Bituminous pavement mixture PG64-22 (surface leveling) (4020520)TON19,832.90$79.75$79.00$92.00
0560Tack coat (4071005)GAL27,903$2.75$2.75$2.60
0570Work zone crash cushion (narrow) (6122040)EACH6$5,668.00$6,500.00$5,526.00
0580Work zone crash cushion (narrow) (relocation) (6122041)EACH6$1,923.00$1,000.00$1,875.00
0590Construction signs (6161005)SF2,659$9.25$6.00$9.00
0600Advanced warning rail system (6161008)EACH6$35.90$45.00$35.00
0610Channelizer (trim line) (6161025)EACH280$18.50$22.00$18.00
0620Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A)EACH6$2,872.00$3,000.00$2,800.00
0630Work zone traffic signal system (6162000A)EACH3$6,000.00$7,800.00$5,800.00
0640Temporary long-term rumble strips (6162002)EACH6$1,026.00$1,200.00$1,000.00
0650Temporary traffic barrier, contractor furnished retained (6173600D)LF972$47.90$32.00$46.70
0660Relocating temporary traffic barrier (6175010A)LF972$12.50$15.00$12.17
0670Mobilization (6181000)LS1$48,990$130,000$100,000
0680Temporary removable marking tape 4 in., white (6205301B)LF1,278$2.05$4.49$2.00
0690Temporary removable marking tape 4 in., yellow (6205303B)LF3,000$2.05$4.49$2.00
0700Temporary removable marking tape, 24 in., white (6205309)LF60$10.25$10.94$10.00
07104 in. white standard waterborne pavement marking paint, type P beads (6206000C)LF7,002$0.20$0.50$0.20
07204 in. yellow standard waterborne pavement marking paint, type P beads (6206001C)LF219,166$0.13$0.12$0.13
0730Pavement marking removal (6207001)LF2,622$1.55$3.00$1.50
0740Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001)SY458$19.20$28.40$18.00
0750Modified coldmilling (depth transitions) (6224010)SY1,076$15.20$12.65$30.00
0760MGS guardrail, 8 FT. posts, 6 FT. - 3 in. spacing (6061061)LF1,975$26.20$25.94$27.57
0770MGS bridge approach transition section (regular/no curb) (6061069)EACH12$3,467.00$3,431.82$3,489.05
0780MGS height and block transition (6061074)EACH1$1,799.00$1,780.47$1,807.58
0790Type A crashworthy end terminal (MASH) (6063014)EACH19$2,997.00$2,967.23$3,162.81
0800Pipe posts (9031220)LB30$9.30$9.15$118.24
0810Breakaway assembly (perforated square steel tube) (9031241)EACH92$104.60$0.01$51.37
0820U-channel post, 3 LB (9031250A)LF66$119.80$118.00$78.81
08302.5 in. PSST post - 12 GA. (9031280)LF92$13.20$13.00$44.14
0840Concrete post anchor for 2.5 in. PSST. - 7 GA. (9031285)EACH6$360.40$355.00$1,626.66
0850SH-flat sheet (9035004A)SF128$19.30$19.00$62.86
0860SHF-flat sheet fluorescent (9035069A)SF470$20.90$20.60$20.64
0870Curb blockout (7034600)LF234$254.00$221.00$221.00
0880Curb blockout (7034600)LF270$152.30$221.00$221.00
0890Misc.end post modification (7039902)EACH4$7,106.60$5,800.00$5,800.00
MoDOT contract 250221-H01: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.

Every contract let that day: MoDOT letting of February 21, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy