MoDOT contract 250314-H03 bid tabulation
J9S3699-ROUTE O-STE. GENEVIEVE. Let by Missouri DOT on March 14, 2025, Ste Genevieve, Southeast. 3 bids received; low bid $984,000 by N.B. West Contracting Company.
- Owner
- Missouri DOT
- Letting
- 14 MAR 2025
- Pay items
- 27
- Data through
- 16 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | N.B. West Contracting Company | $984,000 | Low |
| 2 | Pace Construction Company, LLC | $1,110,000 | +13% |
| 3 | Lead Belt Materials Company, Inc. | $1,154,647 | +17% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. N.B. West Contracting Company | 2. Pace Construction Company, LLC | 3. Lead Belt Materials Company, Inc. |
|---|---|---|---|---|---|---|
| 0010 | Signet dbe reporting (1081000) | LS | 1 | $1,000.00 | $1,000.00 | $1,000.00 |
| 0020 | Removal of improvements (2022010) | LS | 1 | $8,000.00 | $13,745 | $7,680.00 |
| 0030 | Misc.modified shaping slopes, class III (2159903) | LF | 1,290 | $12.50 | $12.50 | $12.50 |
| 0040 | Misc.permanent aggregate edge treatment (3049910) | TON | 595 | $49.00 | $56.00 | $59.25 |
| 0050 | Gravel (A) or crushed stone (B) (3105002) | TON | 38 | $56.00 | $56.00 | $80.00 |
| 0060 | Bituminous pavement mixture PG58-28H, (BP-1) (4011231) | TON | 162.40 | $207.00 | $175.00 | $146.00 |
| 0070 | Bituminous pavement mixture PG58-28H (surface leveling) (4020521) | TON | 5,944.60 | $95.00 | $97.00 | $70.46 |
| 0080 | Tack coat (4071005) | GAL | 7,212 | $0.01 | $0.01 | $3.25 |
| 0090 | Misc.optional surface treatment (4139912) | GAL | 21,675 | $3.00 | $2.80 | $9.00 |
| 0100 | Furnishing and placing bituminous material for class C partial depth pavement repair (6133020) | TON | 513.10 | $165.00 | $78.00 | $186.00 |
| 0110 | Removal for class C partial depth pavement repair (6133021) | SY | 3,025.30 | $5.00 | $29.00 | $10.50 |
| 0120 | Construction signs (6161005) | SF | 828 | $7.00 | $8.00 | $7.00 |
| 0130 | Channelizer (trim line) (6161025) | EACH | 100 | $20.00 | $1.00 | $10.00 |
| 0140 | Changeable message sign without communication interface, contractor furnished, contractor retained (6161098A) | EACH | 2 | $3,000.00 | $2,750.00 | $2,750.00 |
| 0150 | Mobilization (6181000) | LS | 1 | $34,275 | $110,000 | $163,000 |
| 0160 | 4 in. white standard waterborne pavement marking paint, type P beads (6206000C) | LF | 64,185 | $0.11 | $0.11 | $0.15 |
| 0170 | 4 in. yellow standard waterborne pavement marking paint, type P beads (6206001C) | LF | 60,337 | $0.11 | $0.11 | $0.14 |
| 0180 | Coldmilling bituminous pavement for removal of surfacing (3 in. thick or less) (6221001) | SY | 920 | $3.30 | $12.60 | $16.25 |
| 0190 | Coldmilling bituminous pavement for removal of surfacing (greater than 3 in. thick) (6221003) | SY | 150 | $43.00 | $22.20 | $21.25 |
| 0200 | Modified coldmilling (depth transitions) (6224010) | SY | 1,185 | $6.15 | $12.45 | $8.50 |
| 0210 | Bituminous shoulder rumble strip (6261000A) | STA | 515.80 | $26.00 | $23.50 | $18.00 |
| 0220 | MGS guardrail (6061060) | LF | 100 | $30.00 | $30.00 | $30.00 |
| 0230 | MGS guardrail, 6 FT. posts, 3 FT. - 1.5 in. spacing (6061063) | LF | 100 | $42.00 | $42.00 | $42.00 |
| 0240 | MGS guardrail, 6 FT. posts, 1 FT. - 6.75 in. spacing (6061065) | LF | 300 | $60.00 | $60.00 | $60.00 |
| 0250 | MGS bridge approach transition section (extended curb) (6061068) | EACH | 1 | $4,200.00 | $4,200.00 | $4,200.00 |
| 0260 | MGS bridge approach transition section (regular/no curb) (6061069) | EACH | 3 | $4,200.00 | $4,200.00 | $4,200.00 |
| 0270 | Type A crashworthy end terminal (MASH) (6063014) | EACH | 8 | $3,800.00 | $3,800.00 | $3,800.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from MoDOT's tabulation for this contract. MoDOT letting tabulation PDFs (vendor ranking and bid tabulation), January 2020 to October 2026. About one bid in eight did not match its published total and is left out. Item codes from before mid 2021 are written in the current MoDOT format so one item groups across years.
Every contract let that day: MoDOT letting of March 14, 2025. Compiled by Mirage Metrics.