NYSDOT contract D265478 bid tabulation
I-81 VIADUCT PROJECT - CONTRACT 5 - PHASE 1. Let by New York State DOT on March 20, 2025, Onondaga, Region 03. 2 bids received; low bid $250,999,997 by Salt City Constructors LLC.
- Owner
- New York State DOT
- Letting
- 20 MAR 2025
- Pay items
- 595
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Salt City Constructors LLC | $250,999,997 | Low |
| 2 | SRV Constructors LLC | $273,013,975 | +9.0% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Salt City Constructors LLC | 2. SRV Constructors LLC |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.07) | ACRE | 4 | $58,900 | $2,000.00 |
| 2 | (202.010001) | LS | 1 | $274,000 | $3,000,000 |
| 3 | (202.120001) | LS | 1 | $668,000 | $1,000,000 |
| 4 | (202.120002) | LS | 1 | $423,000 | $750,000 |
| 5 | (202.120003) | LS | 1 | $349,000 | $750,000 |
| 6 | (202.120004) | LS | 1 | $5,250,000 | $3,500,000 |
| 7 | (202.120005) | LS | 1 | $781,000 | $400,000 |
| 8 | Removal of Substructures (202.19) | CY | 11,619 | $419.00 | $250.00 |
| 9 | Removal of Steel Supported Structural Slabs (with shear connectors) – Type B (202.2202) | SF | 1,900 | $30.00 | $50.00 |
| 10 | Unclassified Excavation and Disposal (203.02) | CY | 244,609 | $42.50 | $70.00 |
| 11 | Embankment In Place (203.03) | CY | 72,890 | $10.00 | $50.00 |
| 12 | Select Granular Fill (203.07) | CY | 31,212 | $149.00 | $55.00 |
| 13 | Select Structural Fill (203.21) | CY | 25,495 | $137.00 | $100.00 |
| 14 | Sand Backfill (203.25) | CY | 2,254 | $80.00 | $60.00 |
| 15 | Controlled Low Strength Material (CLSM) (204.01) | CY | 1,630 | $542.00 | $200.00 |
| 16 | (205.0201) | LS | 1 | $301,000 | $100,000 |
| 17 | (205.0202) | LS | 1 | $2,539,000 | $500,000 |
| 18 | Field Organic Vapor Monitoring of Contaminated Soil (205.03) | HR | 6,455 | $180.00 | $165.00 |
| 19 | (205.050101) | TON | 154 | $400.00 | $860.00 |
| 20 | (205.050102) | TON | 383 | $400.00 | $860.00 |
| 21 | (205.050201) | TON | 14,484 | $128.00 | $92.00 |
| 22 | (205.050202) | TON | 74,537 | $128.00 | $92.00 |
| 23 | (205.0601) | CY | 545 | $92.10 | $43.00 |
| 24 | (205.0602) | CY | 1,087 | $87.20 | $43.00 |
| 25 | (205.97300003) | 15,917 | $8.90 | $5.00 | |
| 26 | (205.97400003) | 111,422 | $2.00 | $4.00 | |
| 27 | Structure Excavation (206.01) | CY | 77,673 | $62.60 | $70.00 |
| 28 | Trench and Culvert Excavation (206.0201) | CY | 46,427 | $92.80 | $80.00 |
| 29 | Conduit Excavation and Backfill including Surface Restoration (206.03) | LF | 26,322 | $76.30 | $32.00 |
| 30 | Test Pit Excavation (206.05) | EACH | 75 | $2,470.00 | $4,750.00 |
| 31 | Geotextile Bedding (207.20) | SY | 168 | $7.65 | $5.00 |
| 32 | Geotextile Separation (207.21) | SY | 1,508 | $4.50 | $5.00 |
| 33 | Geotextile Drainage (207.22) | SY | 13,655 | $1.00 | $2.00 |
| 34 | Prefabricated Composite Structural Drain (207.26) | SY | 4,599 | $46.30 | $25.00 |
| 35 | (208.01030022) | 656 | $181.00 | $130.00 | |
| 36 | Mulch – Temporary (209.100101) | SY | 68,000 | $1.40 | $1.00 |
| 37 | Seed and Mulch – Temporary (209.1003) | SY | 34,000 | $1.55 | $1.10 |
| 38 | (209.11010024) | 141 | $542.00 | $410.00 | |
| 39 | Check Dam, Prefabricated – Temporary (209.1105) | LF | 25 | $186.00 | $140.00 |
| 40 | Silt Fence - Temporary (209.13) | LF | 250 | $28.10 | $8.00 |
| 41 | Drainage Structure Inlet Protection, Prefabricated – Temporary (209.1703) | LF | 380 | $44.70 | $32.00 |
| 42 | Rolled Erosion Control Product, Class I Type A, Short Term (209.1801) | SY | 3,000 | $6.75 | $4.00 |
| 43 | Rolled Erosion Control Product, Class II Type C, Intermediate (209.190301) | SY | 32,987 | $7.30 | $4.50 |
| 44 | Soil Stabilizers, Class IV Type A (209.2101) | SY | 34,000 | $2.80 | $2.00 |
| 45 | Soil Stabilizers, Class IV Type C (209.2103) | SY | 34,655 | $2.85 | $2.00 |
| 46 | Sediment Filter Log, 12″ (209.2301) | LF | 12,333 | $11.00 | $6.00 |
| 47 | Removal and Disposal of Roofing ACM (210.1002) | SF | 9,315 | $21.00 | $3.00 |
| 48 | (210.290301) | LS | 1 | $59,000 | $60,000 |
| 49 | Removal and Disposal of Bond Breaker/Filler ACM (BV14) (210.3312) | SF | 25 | $257.00 | $120.00 |
| 50 | Removal and Disposal of Caulking ACM (BV14) (210.3411) | LF | 440 | $129.00 | $40.00 |
| 51 | (210.481201) | SF | 465 | $172.00 | $56.00 |
| 52 | Soil Nail Wall System (Temporary) (211.01) | SF | 12,317 | $89.00 | $89.00 |
| 53 | Soil Nail Wall System (Permanent) (211.02) | SF | 3,557 | $89.00 | $89.00 |
| 54 | Grouted Tiebacks (Temporary) (211.10) | EACH | 197 | $17,100 | $7,500.00 |
| 55 | Creep Test for Grouted Tiebacks (211.12) | EACH | 8 | $2,330.00 | $6,000.00 |
| 56 | Subbase Course, Type 2 (304.12) | CY | 10,964 | $119.00 | $100.00 |
| 57 | Subbase Course, Optional Type (304.15) | CY | 19,722 | $123.00 | $110.00 |
| 58 | (404.0001) | TON | 982 | $70.00 | $70.00 |
| 59 | Longitudinal Joint Density Quality Adjustment to Asphalt Items (404.0003) | QUALITY UNIT | 110 | $70.00 | $70.00 |
| 60 | (404.0962) | TON | 4,839 | $180.00 | $150.00 |
| 61 | (404.0982) | TON | 1,436 | $214.00 | $165.00 |
| 62 | (404.0983) | TON | 704 | $216.00 | $165.00 |
| 63 | (404.1969) | TON | 2,193 | $185.00 | $155.00 |
| 64 | (404.1989) | TON | 7,067 | $169.00 | $135.00 |
| 65 | (404.3769) | TON | 7,016 | $169.00 | $135.00 |
| 66 | (404.3789) | TON | 14,240 | $164.00 | $125.00 |
| 67 | Diluted Tack Coat (407.0102) | GAL | 5,923 | $19.00 | $6.00 |
| 68 | Straight Tack Coat (407.0103) | GAL | 3,579 | $26.40 | $6.25 |
| 69 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 6,395 | $8.80 | $1.00 |
| 70 | Production Cold Milling of Bituminous Concrete (490.10) | SY | 33,750 | $6.55 | $7.00 |
| 71 | (490.10130011) | 6,253 | $15.70 | $12.00 | |
| 72 | Miscellaneous Cold Milling of Bituminous Concrete (490.30) | SY | 9,986 | $12.60 | $11.00 |
| 73 | (502.0022) | 7,094 | $905.00 | $800.00 | |
| 74 | (502.0222) | 529 | $1,800.00 | $2,000.00 | |
| 75 | (502.32010010) | 30 | $163.00 | $125.00 | |
| 76 | (502.9100) | 18,336 | $32.80 | $18.00 | |
| 77 | (502.9101) | 81 | $174.00 | $20.00 | |
| 78 | (502.9111) | 24,525 | $11.80 | $12.00 | |
| 79 | Sealing Transverse Joints- Highway Joint Sealant (502.9210) | LF | 18,336 | $17.00 | $7.00 |
| 80 | Sealing Longitudinal Joints -Preformed Elastic Joint Sealer (502.9301) | LF | 157 | $14.80 | $115.00 |
| 81 | Sealing Longitudinal Joints-Highway Joint Sealant (502.9310) | LF | 20,094 | $17.10 | $6.50 |
| 82 | Performance Concrete Quality Adjustment - PCC Pavement (502.99) | QUALITY UNIT | 100 | $2.14 | $2.14 |
| 83 | Production Grinding – New PCC Pavement with Slurry Removal (505.0202) | SY | 28,375 | $17.60 | $13.00 |
| 84 | Micropiles (Contractor Designed) (551.30) | EACH | 139 | $16,500 | $12,000 |
| 85 | (551.33) | 2,940 | $349.00 | $275.00 | |
| 86 | Furnishing Equipment for Installing Micropiles (551.34) | LS | 1 | $116,000 | $800,000 |
| 87 | Static Pile Compressive Load Test (551.35) | EACH | 3 | $77,600 | $50,000 |
| 88 | (552.03053617) | 1,169 | $703.00 | $400.00 | |
| 89 | Temporary Steel Sheeting (552.13) | SF | 14,630 | $6.25 | $35.00 |
| 90 | Shields and Shoring (552.17) | SF | 323,123 | $0.80 | $2.00 |
| 91 | (552.2001) | LF | 3,300 | $180.00 | $85.00 |
| 92 | (552.2003) | LF | 1,394 | $370.00 | $85.00 |
| 93 | (552.2004) | LF | 405 | $175.00 | $85.00 |
| 94 | (552.2005) | LF | 830 | $324.00 | $85.00 |
| 95 | (552.2006) | LF | 1,964 | $175.00 | $85.00 |
| 96 | (552.2008) | LF | 424 | $700.00 | $85.00 |
| 97 | (552.2105) | LF | 30 | $860.00 | $1,105.00 |
| 98 | (552.2201) | LF | 3,380 | $554.00 | $650.00 |
| 99 | (552.2203) | LF | 1,724 | $522.00 | $650.00 |
| 100 | (552.2204) | LF | 262 | $519.00 | $650.00 |
| 101 | (552.2205) | LF | 772 | $540.00 | $650.00 |
| 102 | (552.2206) | LF | 1,964 | $275.00 | $655.00 |
| 103 | (552.2208) | LF | 894 | $600.00 | $650.00 |
| 104 | (552.230101) | SF | 11,100 | $35.90 | $15.00 |
| 105 | (552.230201) | SF | 5,357 | $40.80 | $27.00 |
| 106 | (552.230203) | SF | 4,129 | $40.00 | $19.00 |
| 107 | (552.230204) | SF | 938 | $36.90 | $19.00 |
| 108 | (552.230205) | SF | 1,630 | $37.10 | $19.00 |
| 109 | (552.230206) | SF | 4,480 | $35.70 | $19.00 |
| 110 | (552.230301) | SF | 450 | $142.00 | $90.00 |
| 111 | (554.3001) | SF | 15,082 | $72.30 | $70.00 |
| 112 | Fill Type Retaining Wall (0 – 6 ft.) (554.40) | SF | 30 | $1,150.00 | $710.00 |
| 113 | Fill Type Retaining Wall (Greater than 24 ft. – 30 ft.) (554.44) | SF | 16,289 | $160.00 | $200.00 |
| 114 | (554.60000102) | 1 | $15,700 | $15,000 | |
| 115 | Footing Concrete, Performance (555.0011) | CY | 546 | $1,100.00 | $1,200.00 |
| 116 | Concrete for Structures, Performance (555.0021) | CY | 2,595 | $3,510.00 | $3,000.00 |
| 117 | (555.02000001) | 975 | $1,500.00 | $1,000.00 | |
| 118 | (555.72940001) | 27,283 | $35.00 | $28.00 | |
| 119 | Performance Concrete Quality Adjustment – Footing Concrete (555.9901) | QUALITY UNIT | 1 | $8.50 | $8.50 |
| 120 | Performance Concrete Quality Adjustment – Concrete for Structures (555.9902) | QUALITY UNIT | 1 | $15.75 | $15.75 |
| 121 | Uncoated Bar Reinforcement for Concrete Structures (556.0201) | LB | 89,557 | $3.25 | $1.75 |
| 122 | Epoxy-Coated Bar Reinforcement for Structures (556.0202) | LB | 314,136 | $3.35 | $1.85 |
| 123 | Stud Shear Connectors for Bridges (556.03) | EACH | 556 | $9.15 | $10.00 |
| 124 | (557.1112) | SY | 230 | $450.00 | $500.00 |
| 125 | Winter Surface Treatment – Superstructure Slabs and Structural Approach Slabs (557.29) | SY | 239 | $0.01 | $0.01 |
| 126 | (557.60010004) | 37 | $859.00 | $365.00 | |
| 127 | Performance Concrete Quality Adjustment – Superstructure and Approach Slab (557.9901) | QUALITY UNIT | 1 | $11.37 | $11.37 |
| 128 | Longitudinal Sawcut Grooving of Structural Slab Surface (558.02) | SY | 239 | $75.70 | $30.00 |
| 129 | Protective Sealing of Structural Concrete on New Bridge Decks and Bridge Deck Overlays (559.01) | SF | 2,150 | $1.00 | $1.05 |
| 130 | Protective Sealing of New Structural Concrete (559.02) | SF | 11,700 | $3.00 | $2.50 |
| 131 | (559.90010011) | 800 | $36.00 | $47.00 | |
| 132 | (559.91100010) | 16,230 | $4.65 | $5.50 | |
| 133 | Dimension Stone Masonry (560.01) | SF | 533 | $912.00 | $800.00 |
| 134 | (560.04500011) | 30 | $145.00 | $100.00 | |
| 135 | (564.05) | LS | 1 | $20,600 | $5,000.00 |
| 136 | (564.0501) | LS | 1 | $4,570,000 | $5,000,000 |
| 137 | (564.0502) | LS | 1 | $6,204,000 | $5,000,000 |
| 138 | (564.0503) | LS | 1 | $2,528,000 | $2,500,000 |
| 139 | (564.0504) | LS | 1 | $80,000 | $100,000 |
| 140 | (564.5101) | 2,347 | $6.70 | $54.00 | |
| 141 | Type M.R. Expansion Bearing (Over 900 k) (565.1525) | EACH | 4 | $25,100 | $25,000 |
| 142 | Type M.R. Fixed Bearing (Over 900 k) (565.1725) | EACH | 4 | $18,000 | $20,000 |
| 143 | Type E.B. Expansion Bearing (Over 225 k) (565.2035) | EACH | 8 | $6,060.00 | $6,000.00 |
| 144 | Armorless Bridge Joint (567.60) | LF | 49 | $601.00 | $500.00 |
| 145 | Single Slope (Half-Section) Concrete Bridge Barrier (569.04) | LF | 1,190 | $528.00 | $400.00 |
| 146 | Performance Concrete Quality Adjustment–Cast-In-Place Concrete Barrier (569.99) | QUALITY UNIT | 1 | $19.54 | $19.54 |
| 147 | Lead-Exposure Control Plan (570.01) | LS | 1 | $776.00 | $2,000.00 |
| 148 | Medical Testing (570.02) | DOL | 54,000 | $1.00 | $1.00 |
| 149 | Personal-Exposure-Monitoring Sample Analysis (570.03) | DOL | 63,000 | $1.00 | $1.00 |
| 150 | Decontamination Facilities (570.04) | CALENDAR WEEK | 14 | $776.00 | $500.00 |
| 151 | (570.090001) | LS | 1 | $1.55 | $1.00 |
| 152 | (570.090002) | LS | 1 | $1.55 | $1.00 |
| 153 | (570.090003) | LS | 1 | $1.55 | $1.00 |
| 154 | (570.090004) | LS | 1 | $1.55 | $1.00 |
| 155 | (570.090005) | LS | 1 | $1.55 | $1.00 |
| 156 | (570.160001) | LS | 1 | $1.55 | $1.00 |
| 157 | (570.160002) | LS | 1 | $1.55 | $1.00 |
| 158 | (570.160003) | LS | 1 | $1.55 | $1.00 |
| 159 | (570.160004) | LS | 1 | $1.55 | $1.00 |
| 160 | (570.160005) | LS | 1 | $1.55 | $1.00 |
| 161 | Disposal of Hazardous Paint Removal Waste Containing Lead (571.03) | LB | 6,453 | $3.90 | $5.00 |
| 162 | Disposal of Non-Hazardous Industrial Solid Paint Removal Waste (571.04) | LB | 6,453 | $7.75 | $5.00 |
| 163 | (572.020001) | LS | 1 | $1,112,000 | $900,000 |
| 164 | Removal of Structural Concrete (580.01) | CY | 10 | $5,240.00 | $850.00 |
| 165 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 130 | $69.00 | $53.00 |
| 166 | Field Drill Holes in Existing Structural Steel (586.10) | EACH | 320 | $243.00 | $65.00 |
| 167 | (601.01110001) | 2,167 | $81.40 | $50.00 | |
| 168 | (603.051216) | LF | 23 | $160.00 | $565.00 |
| 169 | (603.171216) | EACH | 13 | $560.00 | $1,100.00 |
| 170 | (603.171416) | EACH | 3 | $1,600.00 | $3,000.00 |
| 171 | (603.171614) | EACH | 2 | $1,920.00 | $4,650.00 |
| 172 | (603.6002) | LF | 749 | $112.00 | $375.00 |
| 173 | (603.6105) | LF | 123 | $65.00 | $550.00 |
| 174 | (603.6804) | LF | 211 | $360.00 | $550.00 |
| 175 | (603.6805) | LF | 195 | $560.00 | $825.00 |
| 176 | (603.6807) | LF | 943 | $840.00 | $1,400.00 |
| 177 | (603.7302) | EACH | 2 | $4,000.00 | $4,650.00 |
| 178 | (603.7305) | EACH | 1 | $7,200.00 | $9,250.00 |
| 179 | (603.98100804) | 521 | $48.00 | $280.00 | |
| 180 | (603.98101004) | 320 | $88.00 | $300.00 | |
| 181 | (603.98101204) | 27 | $120.00 | $1,250.00 | |
| 182 | (603.98101504) | 48 | $320.00 | $750.00 | |
| 183 | (603.9812) | LF | 40 | $200.00 | $410.00 |
| 184 | (603.98120007) | 600 | $216.00 | $1,250.00 | |
| 185 | (603.9815) | LF | 5,437 | $60.80 | $275.00 |
| 186 | (603.98150007) | 677 | $240.00 | $350.00 | |
| 187 | (603.9818) | LF | 2,926 | $80.00 | $235.00 |
| 188 | (603.9824) | LF | 1,037 | $81.60 | $425.00 |
| 189 | (603.98240007) | 45 | $360.00 | $1,225.00 | |
| 190 | (603.98300007) | 663 | $440.00 | $630.00 | |
| 191 | (603.98480007) | 1,230 | $1,040.00 | $1,900.00 | |
| 192 | (603.99050002) | 33 | $2,880.00 | $2,550.00 | |
| 193 | (603.99100105) | LS | 1 | $965,000 | $1,500,000 |
| 194 | (603.99100205) | LS | 1 | $74,300 | $600,000 |
| 195 | (603.99100305) | LS | 1 | $204,000 | $184,000 |
| 196 | (603.99100405) | LS | 1 | $94,100 | $179,000 |
| 197 | (603.99100505) | LS | 1 | $334,000 | $300,000 |
| 198 | (604.070101) | EACH | 1 | $6,730.00 | $18,850 |
| 199 | (604.070102) | EACH | 4 | $3,200.00 | $20,200 |
| 200 | (604.070301) | EACH | 1 | $6,730.00 | $36,000 |
| 201 | (604.070302) | EACH | 15 | $11,400 | $36,000 |
| 202 | (604.070303) | EACH | 1 | $13,100 | $33,000 |
| 203 | (604.070304) | EACH | 1 | $13,100 | $36,000 |
| 204 | (604.070305) | EACH | 1 | $9,330.00 | $17,000 |
| 205 | (604.070306) | EACH | 1 | $9,330.00 | $17,000 |
| 206 | (604.070307) | EACH | 1 | $9,330.00 | $17,000 |
| 207 | (604.070308) | EACH | 1 | $9,330.00 | $12,000 |
| 208 | (604.070309) | EACH | 1 | $9,330.00 | $17,000 |
| 209 | (604.070310) | EACH | 1 | $9,330.00 | $17,000 |
| 210 | (604.070311) | EACH | 1 | $9,330.00 | $17,000 |
| 211 | (604.070312) | EACH | 1 | $9,330.00 | $17,000 |
| 212 | (604.070313) | EACH | 1 | $9,330.00 | $17,000 |
| 213 | (604.070314) | EACH | 1 | $9,330.00 | $17,000 |
| 214 | (604.070315) | EACH | 12 | $5,820.00 | $20,000 |
| 215 | (604.070316) | EACH | 1 | $7,130.00 | $20,000 |
| 216 | (604.070317) | EACH | 1 | $7,130.00 | $20,000 |
| 217 | (604.070318) | EACH | 1 | $7,130.00 | $20,000 |
| 218 | (604.070319) | EACH | 1 | $7,130.00 | $20,000 |
| 219 | (604.070320) | EACH | 1 | $7,130.00 | $20,000 |
| 220 | (604.070321) | EACH | 1 | $7,130.00 | $19,000 |
| 221 | (604.070322) | EACH | 1 | $7,130.00 | $20,000 |
| 222 | (604.070323) | EACH | 1 | $7,130.00 | $20,000 |
| 223 | (604.070324) | EACH | 1 | $7,130.00 | $20,000 |
| 224 | (604.070325) | EACH | 1 | $7,130.00 | $20,000 |
| 225 | (604.070326) | EACH | 1 | $7,130.00 | $20,000 |
| 226 | (604.070327) | EACH | 1 | $7,130.00 | $20,000 |
| 227 | (604.07260011) | 6 | $6,400.00 | $11,315 | |
| 228 | (604.13000011) | 13 | $3,720.00 | $3,300.00 | |
| 229 | (604.300103) | LF | 30 | $1,470.00 | $3,100.00 |
| 230 | (604.300290) | LF | 8 | $2,000.00 | $2,555.00 |
| 231 | (604.300611) | LF | 26 | $1,600.00 | $3,485.00 |
| 232 | (604.300691) | LF | 24 | $1,600.00 | $3,330.00 |
| 233 | (604.300832) | LF | 34 | $1,920.00 | $4,000.00 |
| 234 | (604.301232) | LF | 41 | $2,720.00 | $5,430.00 |
| 235 | (604.301911) | LF | 6 | $1,600.00 | $3,090.00 |
| 236 | (604.302016) | LF | 51 | $1,200.00 | $3,500.00 |
| 237 | (604.302091) | LF | 150 | $1,520.00 | $3,145.00 |
| 238 | (604.302122) | LF | 44 | $1,080.00 | $2,720.00 |
| 239 | (604.302192) | LF | 224 | $1,760.00 | $2,300.00 |
| 240 | (604.310611) | LF | 16 | $1,570.00 | $2,555.00 |
| 241 | (604.320611) | LF | 34 | $800.00 | $3,050.00 |
| 242 | (604.4048) | LF | 88 | $976.00 | $2,550.00 |
| 243 | (604.4060) | LF | 9 | $1,520.00 | $2,300.00 |
| 244 | (604.4072) | LF | 8 | $2,560.00 | $2,700.00 |
| 245 | (604.500301) | LF | 51 | $1,600.00 | $3,050.00 |
| 246 | (604.500302) | LF | 38 | $1,360.00 | $3,300.00 |
| 247 | (604.500303) | LF | 15 | $4,160.00 | $6,600.00 |
| 248 | Underdrain Filter, Type I (605.0901) | CY | 145 | $195.00 | $50.00 |
| 249 | Underdrain Filter, Type II (605.1001) | CY | 2,310 | $204.00 | $50.00 |
| 250 | (605.1503) | LF | 500 | $16.40 | $70.00 |
| 251 | (605.1602) | LF | 2,002 | $13.20 | $71.00 |
| 252 | (605.1605) | LF | 289 | $56.10 | $150.00 |
| 253 | (605.1701) | LF | 20,175 | $5.10 | $16.00 |
| 254 | (605.1702) | LF | 2,266 | $10.90 | $40.00 |
| 255 | Box Beam Guide Railing (606.10) | LF | 3,968 | $88.50 | $53.00 |
| 256 | Box Beam Median Barrier (606.11) | LF | 1,476 | $150.00 | $66.00 |
| 257 | Box Beam End Piece (606.120101) | EACH | 6 | $1,160.00 | $690.00 |
| 258 | Box Beam Median Barrier End Assembly, Type A (606.1401) | EACH | 3 | $6,980.00 | $2,275.00 |
| 259 | Single-Slope Concrete Median Barrier (Optional) (606.3041) | LF | 518 | $361.00 | $220.00 |
| 260 | Single-Slope Concrete Half Section Barrier (Optional) (606.3061) | LF | 2,573 | $404.00 | $310.00 |
| 261 | (606.30630111) | 453 | $327.00 | $305.00 | |
| 262 | Embedded Low-Profile Concrete Barrier, TL-2 (606.3110) | LF | 4,579 | $267.00 | $155.00 |
| 263 | Embedded Low-Profile Concrete Barrier, TL-2 – Left Terminal (606.3111) | EACH | 1 | $20,500 | $13,000 |
| 264 | Embedded Low-Profile Concrete Barrier, TL-2 – Right Terminal (606.3112) | EACH | 2 | $19,700 | $10,000 |
| 265 | (606.32960011) | 320 | $167.00 | $200.00 | |
| 266 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 6,603 | $7.55 | $15.00 |
| 267 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 19 | $233.00 | $300.00 |
| 268 | Transition Between Box Beam Guide Rail and Single Slope Half Section Concrete Barrier (One or Two Way Operation) (606.8803) | EACH | 3 | $21,100 | $15,000 |
| 269 | (606.90000011) | 25 | $906.00 | $1,500.00 | |
| 270 | (607.0512) | LF | 1,277 | $132.00 | $95.00 |
| 271 | (607.0513) | LF | 6,853 | $93.30 | $70.00 |
| 272 | (607.3003) | LF | 587 | $92.00 | $65.00 |
| 273 | (607.41010010) | 3,256 | $10.20 | $11.00 | |
| 274 | (607.95020111) | 1,280 | $168.00 | $120.00 | |
| 275 | (607.97010007) | 293 | $2,160.00 | $1,550.00 | |
| 276 | (607.98010111) | 1,527 | $55.90 | $40.00 | |
| 277 | Concrete Sidewalks and Driveways (608.0101) | CY | 1,221 | $2,220.00 | $1,750.00 |
| 278 | (608.01020005) | 241 | $2,790.00 | $1,825.00 | |
| 279 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 625 | $341.00 | $235.00 |
| 280 | Grouted Stone Block Paved Sidewalks and Driveways (Sand Setting Bed) (608.08) | SY | 1,083 | $780.00 | $450.00 |
| 281 | (608.10080008) | 399 | $58.20 | $78.00 | |
| 282 | (608.21000003) | 123 | $628.00 | $450.00 | |
| 283 | Stone Curb – Near Vertical Face (NVF) (609.0212) | LF | 7,637 | $117.00 | $70.00 |
| 284 | Stone Curb – Mountable (MT) (609.0214) | LF | 8,217 | $132.00 | $80.00 |
| 285 | Stone Curb – Traversable (TR) (609.0217) | LF | 2,004 | $184.00 | $180.00 |
| 286 | Stone Curb – Roundabout (RD) (609.0218) | LF | 278 | $281.00 | $270.00 |
| 287 | Compost (610.10) | CY | 90 | $170.00 | $110.00 |
| 288 | (610.10020309) | 2,879 | $133.00 | $95.00 | |
| 289 | Mulch for Planting Type A, B & D Wood Chips and Shredded Bark (610.1101) | CY | 117 | $195.00 | $140.00 |
| 290 | Topsoil - Roadside (610.1402) | CY | 8,662 | $145.00 | $95.00 |
| 291 | Topsoil - Special Planting Mix (610.1404) | CY | 3,653 | $149.00 | $105.00 |
| 292 | (610.15120208) | 34,414 | $5.75 | $4.00 | |
| 293 | Turf Establishment - Roadside (610.1601) | SY | 12,922 | $1.95 | $1.30 |
| 294 | Turf Establishment – Performance (610.1605) | SY | 17,634 | $16.30 | $11.00 |
| 295 | Wildflower Seeding (610.17) | SY | 54,919 | $2.15 | $1.50 |
| 296 | Sodding (610.18) | SY | 2,741 | $14.80 | $10.00 |
| 297 | Watering Vegetation (610.19) | 1,000 GALLONS | 1,831 | $40.30 | $27.00 |
| 298 | Mowing (610.21) | SY | 7,256 | $3.75 | $1.00 |
| 299 | (611.0171) | EACH | 189 | $1,120.00 | $735.00 |
| 300 | (611.0241) | EACH | 78 | $842.00 | $550.00 |
| 301 | (611.0242) | EACH | 151 | $854.00 | $550.00 |
| 302 | (611.0351) | EACH | 19 | $952.00 | $615.00 |
| 303 | (611.0371) | EACH | 60 | $1,010.00 | $655.00 |
| 304 | (611.0432) | EACH | 1,450 | $130.00 | $85.00 |
| 305 | (611.0442) | EACH | 151 | $146.00 | $95.00 |
| 306 | (611.19010024) | 189 | $190.00 | $125.00 | |
| 307 | (611.19020024) | 229 | $140.00 | $95.00 | |
| 308 | (611.19030024) | 79 | $203.00 | $135.00 | |
| 309 | (611.19040024) | 1,601 | $49.70 | $35.00 | |
| 310 | (613.70020011) | 135 | $89.40 | $90.00 | |
| 311 | (614.060102) | EACH | 1 | $427.00 | $750.00 |
| 312 | (614.060202) | EACH | 1 | $931.00 | $1,250.00 |
| 313 | (614.060302) | EACH | 1 | $2,170.00 | $1,650.00 |
| 314 | (614.060304) | EACH | 7 | $3,260.00 | $2,250.00 |
| 315 | (617.01010024) | 20,000 | $3.75 | $4.00 | |
| 316 | (617.10000024) | 1,000 | $39.90 | $63.00 | |
| 317 | (617.11000024) | LS | 1 | $3,770.00 | $4,500.00 |
| 318 | (618.78111115) | 18 | $4,410.00 | $1,600.00 | |
| 319 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $7,352,000 | $45,000,000 |
| 320 | Type III Construction Barricades (619.04) | EACH | 121 | $192.00 | $50.00 |
| 321 | (619.080101) | LF | 30,000 | $2.35 | $1.60 |
| 322 | (619.100101) | LF | 70,940 | $1.35 | $0.90 |
| 323 | (619.110542) | EACH | 5 | $66,400 | $40,000 |
| 324 | (619.1301) | EACH | 1 | $14,600 | $18,000 |
| 325 | (619.1307) | EACH | 1 | $43,100 | $75,000 |
| 326 | Maintain Traffic Signal Equipment (Requirement A) Intersection (619.1611) | MONTH | 6 | $482.00 | $310.00 |
| 327 | Maintain Traffic Signal Equipment (Requirement C) Intersection (619.1613) | MONTH | 163 | $482.00 | $130.00 |
| 328 | Temporary Positive Barrier – Category 6 (Pinning Required) (619.1716) | LF | 42,525 | $53.20 | $65.00 |
| 329 | Temporary Impact Attenuator - Redirective (Test Level 2) (619.1802) | EACH | 39 | $24,800 | $9,600.00 |
| 330 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $75,800 | $700,000 |
| 331 | Pavement Patching (Force Acount) (619.2601) | DOL | 50,000 | $1.00 | $1.00 |
| 332 | (619.67020010) | LS | 1 | $729,000 | $1,000,000 |
| 333 | (619.70030011) | 24,300 | $15.30 | $10.00 | |
| 334 | Stone Filling (Fine) (620.02) | CY | 41 | $381.00 | $275.00 |
| 335 | Stone Filling (Light) (620.03) | CY | 146 | $331.00 | $155.00 |
| 336 | Bedding Material, Type 1 (620.0801) | CY | 41 | $366.00 | $260.00 |
| 337 | Cleaning Drainage Structures (621.04) | EACH | 11 | $1,370.00 | $525.00 |
| 338 | Crushed Stone (By Weight) (623.03) | TON | 1,743 | $100.00 | $40.00 |
| 339 | Survey Operations (625.01) | LS | 1 | $3,003,439 | $3,000,000 |
| 340 | Concrete Right of Way Markers Type H (High) (625.03) | EACH | 16 | $3,330.00 | $1,600.00 |
| 341 | Steel Pin and Cap Right of Way Markers (625.05) | EACH | 28 | $927.00 | $500.00 |
| 342 | (625.09010015) | LS | 1 | $2,510,000 | $75,000 |
| 343 | (627.50140008) | 4,489 | $10.90 | $13.00 | |
| 344 | (634.35000011) | 9,898 | $6.60 | $3.00 | |
| 345 | (634.99010017) | LS | 1 | $56,500 | $50,000 |
| 346 | (634.99020017) | LS | 1 | $620,000 | $150,000 |
| 347 | Field Laboratory (637.01) | EACH | 1 | $130,000 | $20,000 |
| 348 | Concrete Cylinder Curing Equipment (637.04) | EACH | 1 | $2,680.00 | $10,000 |
| 349 | Engineer’s Field Office – Type 5 (637.15) | MONTH | 36 | $12,100 | $7,000.00 |
| 350 | Rain Gauge (637.26) | EACH | 1 | $148.00 | $100.00 |
| 351 | Office Technology and Supplies (637.34) | DOL | 1,000 | $1.00 | $1.00 |
| 352 | Partnering Workshop (637.35) | DOL | 5,000 | $1.00 | $1.00 |
| 353 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 |
| 354 | (637.40000120) | 34 | $1,730.00 | $1,600.00 | |
| 355 | (637.40000220) | 34 | $1,730.00 | $1,600.00 | |
| 356 | (637.40000320) | 34 | $1,730.00 | $1,600.00 | |
| 357 | (637.40000420) | 34 | $1,730.00 | $1,600.00 | |
| 358 | (637.40000520) | 34 | $1,730.00 | $1,600.00 | |
| 359 | (637.70000120) | LS | 1 | $136,000 | $75,000 |
| 360 | (639.21010011) | LS | 1 | $250,000 | $250,000 |
| 361 | (642.05960024) | 73 | $99.70 | $55.00 | |
| 362 | (643.92000007) | 12,820 | $343.00 | $280.00 | |
| 363 | (643.99010004) | 87,450 | $142.00 | $150.00 | |
| 364 | Anchor Bolts (644.11) | LB | 2,967 | $25.10 | $9.00 |
| 365 | Drilled Shaft for Overhead Sign Structures (644.20) | CY | 60 | $4,890.00 | $2,025.00 |
| 366 | (644.420925) | EACH | 1 | $155,000 | $150,000 |
| 367 | (644.421125) | EACH | 2 | $150,000 | $150,000 |
| 368 | (644.421215) | EACH | 1 | $132,000 | $150,000 |
| 369 | Performance Concrete Quality Adjustment (644.99) | QUALITY UNIT | 1 | $15.00 | $15.00 |
| 370 | (645.03030015) | 4 | $2,520.00 | $1,400.00 | |
| 371 | (645.03040015) | 8 | $5,430.00 | $2,800.00 | |
| 372 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 1,385 | $90.80 | $45.00 |
| 373 | Overhead Sign Panels (645.61) | SF | 1,609 | $109.00 | $40.00 |
| 374 | (645.65000011) | 26 | $1,030.00 | $60.00 | |
| 375 | Type A Sign Posts (645.81) | EACH | 189 | $708.00 | $200.00 |
| 376 | (645.81090003) | 9 | $140.00 | $75.00 | |
| 377 | Reference Marker Panel (646.21) | EACH | 26 | $98.50 | $30.00 |
| 378 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 120 | $60.10 | $30.00 |
| 379 | Steel Post, 2.0 lb/ft (646.32) | EACH | 146 | $147.00 | $75.00 |
| 380 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 1 | $365.00 | $250.00 |
| 381 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 5 | $101.00 | $35.00 |
| 382 | Remove and Dispose Sign Panel, Sign Panel Assembly Size III (Over 100 Square Feet) (647.53) | EACH | 4 | $2,790.00 | $45.00 |
| 383 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size I (Under 30 Square Feet) (647.61) | EACH | 61 | $77.60 | $40.00 |
| 384 | Remove and Dispose Signs, Ground Mounted Type A Sign Supports and Foundations - Size II (30-100 Square Feet) (647.62) | EACH | 4 | $388.00 | $180.00 |
| 385 | Milled-In Audible Roadway Delineators (MIARDs) (649.01) | LF | 11,103 | $2.50 | $3.00 |
| 386 | (650.1132) | LF | 130 | $3,170.00 | $2,575.00 |
| 387 | (650.1136) | LF | 130 | $3,340.00 | $2,925.00 |
| 388 | (650.2136) | LF | 150 | $4,090.00 | $2,925.00 |
| 389 | Expendable Impact Attenuator , TL 3, > 2 ft up to 5 ft Obstruction Width (654.5032) | EACH | 1 | $36,600 | $47,500 |
| 390 | Parallel Bar Frame 11 PCB & Parallel Bar Grate 11 PCB (655.0902) | EACH | 31 | $2,970.00 | $1,500.00 |
| 391 | Parallel Bar Frame 12 PCB & Parallel Bar Grate 12 PCB (655.0903) | EACH | 40 | $3,160.00 | $2,250.00 |
| 392 | Welded Frame & Rectangular Grate 22 (655.1022) | EACH | 2 | $2,840.00 | $1,900.00 |
| 393 | Welded Frame & Reticuline Grate 3 (655.1103) | EACH | 5 | $2,570.00 | $1,625.00 |
| 394 | Welded Frame & Reticuline Grate 11 (655.1111) | EACH | 9 | $2,690.00 | $2,000.00 |
| 395 | Welded Frame & Reticuline Grate 16 (655.1116) | EACH | 7 | $2,980.00 | $2,250.00 |
| 396 | Welded Frame & Reticuline Grate 22 (655.1122) | EACH | 13 | $3,220.00 | $2,350.00 |
| 397 | Manhole Frame & Cover (655.1202) | EACH | 53 | $2,400.00 | $1,700.00 |
| 398 | (660.04040001) | 434 | $27.00 | $170.00 | |
| 399 | (660.21420008) | 110 | $816.00 | $1,650.00 | |
| 400 | (660.35030008) | 19 | $8,800.00 | $9,000.00 | |
| 401 | (662.60000115) | LS | 1 | $2,000.00 | $2,000.00 |
| 402 | (662.60000215) | LS | 1 | $2,000.00 | $2,000.00 |
| 403 | (662.60000315) | LS | 1 | $1,000.00 | $1,000.00 |
| 404 | (662.60000415) | LS | 1 | $1,000.00 | $1,000.00 |
| 405 | (662.60000515) | LS | 1 | $1,000.00 | $1,000.00 |
| 406 | (662.60000615) | LS | 1 | $1,000.00 | $1,000.00 |
| 407 | (663.0106) | LF | 70 | $272.00 | $375.00 |
| 408 | (663.0108) | LF | 580 | $176.00 | $277.00 |
| 409 | (663.0112) | LF | 590 | $352.00 | $348.00 |
| 410 | (663.0120) | LF | 645 | $592.00 | $1,450.00 |
| 411 | (663.0124) | LF | 1,735 | $648.00 | $600.00 |
| 412 | (663.0130) | LF | 620 | $1,150.00 | $635.00 |
| 413 | (663.0604) | LF | 420 | $125.00 | $105.00 |
| 414 | (663.0607) | LF | 40 | $206.00 | $210.00 |
| 415 | (663.1120) | EACH | 8 | $25,600 | $25,000 |
| 416 | (663.1124) | EACH | 10 | $48,000 | $21,000 |
| 417 | (663.1130) | EACH | 5 | $59,200 | $33,000 |
| 418 | (663.1206) | EACH | 2 | $6,400.00 | $3,150.00 |
| 419 | (663.1208) | EACH | 4 | $7,200.00 | $3,650.00 |
| 420 | (663.1212) | EACH | 2 | $8,400.00 | $6,300.00 |
| 421 | (663.1301) | EACH | 1 | $20,800 | $16,800 |
| 422 | (663.1302) | EACH | 1 | $20,800 | $16,800 |
| 423 | (663.1303) | EACH | 1 | $20,800 | $16,800 |
| 424 | (663.1304) | EACH | 1 | $20,800 | $16,800 |
| 425 | (663.1305) | EACH | 1 | $20,800 | $16,800 |
| 426 | (663.1306) | EACH | 1 | $20,800 | $16,800 |
| 427 | (663.1307) | EACH | 1 | $20,800 | $16,800 |
| 428 | (663.1308) | EACH | 1 | $20,800 | $16,800 |
| 429 | (663.1309) | EACH | 1 | $20,800 | $16,800 |
| 430 | (663.1310) | EACH | 1 | $20,800 | $16,800 |
| 431 | (663.1311) | EACH | 1 | $20,800 | $16,800 |
| 432 | (663.1312) | EACH | 1 | $20,800 | $16,800 |
| 433 | (663.1313) | EACH | 1 | $20,800 | $16,800 |
| 434 | (663.14010009) | 1 | $5,600.00 | $20,500 | |
| 435 | Iron Water Main Fittings (3 - 8 inch diameter) (663.2001) | LB | 1,475 | $45.00 | $6.25 |
| 436 | Iron Water Main Fittings (10 - 16 inch diameter) (663.2002) | LB | 776 | $70.00 | $10.50 |
| 437 | Iron Water Main Fittings (18 inch diameter and larger) (663.2003) | LB | 35,540 | $30.00 | $20.00 |
| 438 | (663.2504) | EACH | 13 | $1,500.00 | $1,295.00 |
| 439 | (663.2507) | EACH | 1 | $4,220.00 | $5,750.00 |
| 440 | (663.2604) | EACH | 13 | $413.00 | $945.00 |
| 441 | (663.2607) | EACH | 1 | $1,030.00 | $2,625.00 |
| 442 | Disconnect and Cap Existing Water Main (663.40) | EACH | 6 | $24,000 | $7,500.00 |
| 443 | (663.4106) | LF | 50 | $104.00 | $110.00 |
| 444 | (663.4108) | LF | 650 | $72.00 | $70.00 |
| 445 | (663.4112) | LF | 305 | $80.00 | $110.00 |
| 446 | (663.4120) | LF | 760 | $104.00 | $93.00 |
| 447 | (663.4124) | LF | 1,306 | $128.00 | $110.00 |
| 448 | (663.4130) | LF | 660 | $128.00 | $110.00 |
| 449 | Remove and Dispose of Existing Water Valve & Valve Box (663.42) | EACH | 13 | $1,200.00 | $6,300.00 |
| 450 | Remove and Dispose of Existing Hydrant (663.43) | EACH | 10 | $2,800.00 | $2,100.00 |
| 451 | Remove and Dispose of Existing Water Service Connection (663.44) | EACH | 15 | $3,350.00 | $1,900.00 |
| 452 | (663.95000004) | 5 | $6,310.00 | $3,850.00 | |
| 453 | (664.40480006) | 212 | $992.00 | $1,875.00 | |
| 454 | (664.40720006) | 140 | $1,600.00 | $2,550.00 | |
| 455 | (664.40960006) | 53 | $3,600.00 | $5,800.00 | |
| 456 | (670.0105) | EACH | 25 | $4,460.00 | $2,250.00 |
| 457 | (670.0108) | EACH | 83 | $4,980.00 | $2,650.00 |
| 458 | (670.01101302) | 62 | $1,570.00 | $1,450.00 | |
| 459 | (670.11200011) | 18 | $815.00 | $500.00 | |
| 460 | (670.15100108) | 23 | $26,600 | $17,500 | |
| 461 | (670.15100208) | 7 | $31,100 | $20,500 | |
| 462 | (670.15100408) | 3 | $28,900 | $17,500 | |
| 463 | (670.15100508) | 25 | $14,600 | $9,500.00 | |
| 464 | (670.15100608) | 6 | $32,300 | $21,000 | |
| 465 | (670.1530) | EACH | 59 | $3,490.00 | $2,550.00 |
| 466 | (670.1540) | EACH | 1 | $5,660.00 | $3,900.00 |
| 467 | (670.1706) | EACH | 60 | $4,240.00 | $1,400.00 |
| 468 | Breakaway Transformer Base (Aluminum) (670.19) | EACH | 44 | $1,670.00 | $975.00 |
| 469 | (670.2003) | LF | 24,093 | $30.40 | $20.50 |
| 470 | (670.2005) | LF | 2,730 | $109.00 | $72.00 |
| 471 | (670.2007) | LF | 851 | $45.10 | $44.00 |
| 472 | (670.2302) | LF | 345 | $84.40 | $44.00 |
| 473 | (670.2306) | LF | 2,875 | $99.70 | $88.00 |
| 474 | (670.2501) | LF | 100 | $26.40 | $25.00 |
| 475 | (670.30010139) | 4 | $9,500.00 | $2,850.00 | |
| 476 | Pullboxes 5 to 7 1/2 cubic feet, inside volume (Lighting) (670.3006) | EACH | 36 | $2,770.00 | $1,700.00 |
| 477 | Pullboxes over 15 cubic feet , inside volume (Lighting) (670.3030) | EACH | 6 | $6,910.00 | $5,500.00 |
| 478 | (670.7002) | LF | 73,002 | $7.85 | $6.00 |
| 479 | (670.7004) | LF | 184 | $8.75 | $3.75 |
| 480 | (670.7007) | LF | 11,868 | $7.50 | $2.40 |
| 481 | Ground Wire No. 6 AWG. (670.7501) | LF | 24,426 | $4.15 | $3.00 |
| 482 | (670.75080011) | 5,934 | $3.70 | $2.00 | |
| 483 | Remove and Dispose of Lamppost Assembly (670.81) | EACH | 69 | $1,320.00 | $1,100.00 |
| 484 | Remove Lamppost Foundation (670.82) | EACH | 69 | $971.00 | $300.00 |
| 485 | (670.94110010) | LS | 1 | $404,000 | $8,750.00 |
| 486 | Performance Concrete Quality Adjustment (670.99) | QUALITY UNIT | 1 | $29.42 | $29.42 |
| 487 | (675.10000023) | 2,210 | $75.20 | $85.00 | |
| 488 | (675.15000023) | 250 | $118.00 | $150.00 | |
| 489 | (675.70210111) | 920 | $1,420.00 | $500.00 | |
| 490 | (675.99000023) | 570,000 | $1.00 | $1.00 | |
| 491 | (680.05010007) | 9 | $28,000 | $22,000 | |
| 492 | (680.05020007) | 1 | $5,140.00 | $5,350.00 | |
| 493 | (680.05040004) | 1 | $4,790.00 | $4,600.00 | |
| 494 | Pole Excavation and Concrete Foundation (680.5001) | CY | 112 | $4,620.00 | $2,050.00 |
| 495 | (680.50500005) | 12 | $430.00 | $485.00 | |
| 496 | (680.51030009) | 2 | $1,620.00 | $800.00 | |
| 497 | (680.510501) | EACH | 44 | $3,420.00 | $1,675.00 |
| 498 | (680.51100010) | 20 | $879.00 | $235.00 | |
| 499 | (680.520106) | LF | 466 | $30.40 | $26.00 |
| 500 | (680.520108) | LF | 1,768 | $71.40 | $48.00 |
| 501 | (680.520110) | LF | 69 | $101.00 | $74.00 |
| 502 | (680.520203) | LF | 12 | $23.30 | $32.00 |
| 503 | (680.520506) | LF | 34 | $24.00 | $15.75 |
| 504 | (680.520508) | LF | 690 | $23.30 | $24.00 |
| 505 | (680.520510) | LF | 65 | $54.30 | $35.50 |
| 506 | Conduit Jacking or Boring (680.53) | LF | 226 | $512.00 | $165.00 |
| 507 | Inductance Loop Installation (680.54) | LF | 172 | $85.70 | $22.00 |
| 508 | (680.622024) | EACH | 3 | $22,100 | $16,000 |
| 509 | (680.622028) | EACH | 1 | $23,000 | $16,250 |
| 510 | (680.622030) | EACH | 1 | $23,200 | $16,500 |
| 511 | (680.622032) | EACH | 1 | $21,700 | $16,750 |
| 512 | (680.622034) | EACH | 1 | $24,900 | $17,000 |
| 513 | (680.622036) | EACH | 2 | $30,000 | $19,000 |
| 514 | (680.622052) | EACH | 1 | $34,700 | $24,000 |
| 515 | (680.632034) | EACH | 1 | $29,900 | $28,000 |
| 516 | (680.632038) | EACH | 1 | $30,600 | $29,000 |
| 517 | (680.670802) | EACH | 9 | $1,930.00 | $1,600.00 |
| 518 | (680.681002) | EACH | 7 | $2,380.00 | $1,900.00 |
| 519 | (680.681602) | EACH | 2 | $2,690.00 | $2,100.00 |
| 520 | (680.6818) | EACH | 21 | $3,380.00 | $2,950.00 |
| 521 | Riser Assembly, 1-inch Diameter (680.700603) | EACH | 6 | $2,480.00 | $875.00 |
| 522 | Riser Assembly, 2-inch Diameter (680.700606) | EACH | 1 | $2,190.00 | $1,000.00 |
| 523 | Shielded Lead-in Cable (680.71) | LF | 188 | $8.20 | $5.75 |
| 524 | Inductance Loop Wire (680.72) | LF | 494 | $12.30 | $1.35 |
| 525 | (680.730514) | LF | 140 | $9.60 | $6.00 |
| 526 | (680.730714) | LF | 16,406 | $8.55 | $5.75 |
| 527 | (680.731514) | LF | 178 | $37.40 | $10.00 |
| 528 | (680.77000205) | 1 | $8,030.00 | $15,000 | |
| 529 | (680.77000305) | 1 | $8,030.00 | $9,550.00 | |
| 530 | (680.77000405) | 1 | $8,030.00 | $9,550.00 | |
| 531 | (680.77000505) | 1 | $8,030.00 | $26,500 | |
| 532 | (680.77000605) | 1 | $8,030.00 | $3,850.00 | |
| 533 | (680.78010005) | 8 | $1,660.00 | $110.00 | |
| 534 | (680.78030005) | 1 | $1,030.00 | $1,375.00 | |
| 535 | (680.78100508) | LS | 1 | $8,030.00 | $17,750 |
| 536 | (680.79000105) | 1 | $8,030.00 | $8,250.00 | |
| 537 | (680.79000205) | 2 | $7,900.00 | $16,000 | |
| 538 | (680.79000305) | 1 | $7,900.00 | $10,550 | |
| 539 | (680.79000405) | 1 | $7,900.00 | $10,500 | |
| 540 | (680.79000505) | 1 | $8,030.00 | $4,800.00 | |
| 541 | (680.79000605) | 1 | $8,030.00 | $3,900.00 | |
| 542 | (680.80149305) | 2 | $3,210.00 | $24,500 | |
| 543 | (680.80320125) | 20 | $2,390.00 | $2,300.00 | |
| 544 | (680.80324515) | 6 | $2,330.00 | $7,000.00 | |
| 545 | (680.80324603) | 2 | $2,300.00 | $1,175.00 | |
| 546 | Traffic Signal Module - 12-inch, Red Ball, LED (680.810101) | EACH | 57 | $273.00 | $170.00 |
| 547 | Traffic Signal Module - 12-inch, Red Arrow, LED (680.810102) | EACH | 4 | $270.00 | $170.00 |
| 548 | Traffic Signal Module - 12-inch, Yellow Ball, LED (680.810103) | EACH | 57 | $273.00 | $170.00 |
| 549 | Traffic Signal Module - 12-inch, Yellow Arrow, LED (680.810104) | EACH | 5 | $239.00 | $170.00 |
| 550 | Traffic Signal Module - 12-inch, Green Ball, LED (680.810105) | EACH | 57 | $274.00 | $170.00 |
| 551 | Traffic Signal Module - 12-inch, Green Arrow, LED (680.810106) | EACH | 6 | $278.00 | $170.00 |
| 552 | Traffic Signal Section - Polycarbonate, Type I, 12-inch (680.810601) | EACH | 190 | $218.00 | $195.00 |
| 553 | Traffic Signal Bracket Assembly - 1 Way (680.8111) | EACH | 49 | $830.00 | $635.00 |
| 554 | Traffic Signal Bracket Assembly - 2 Way (680.8112) | EACH | 7 | $1,140.00 | $845.00 |
| 555 | Traffic Signal Bracket Assembly - 3 Way (680.8113) | EACH | 2 | $1,410.00 | $1,200.00 |
| 556 | Traffic Signal Bracket Assembly - 4 Way (680.8114) | EACH | 1 | $1,820.00 | $1,150.00 |
| 557 | Pedestrian Signal Module - 12-inch, Bi-Modal Hand/Man Symbols, LED (680.813105) | EACH | 58 | $496.00 | $315.00 |
| 558 | Pedestrian Signal Section - Polycarbonate, Type I, 12-inch (680.813106) | EACH | 116 | $401.00 | $260.00 |
| 559 | Pedestrian Signal Bracket Mount Assembly (680.8141) | EACH | 45 | $461.00 | $575.00 |
| 560 | Pedestrian Signal Post Top Mount Assembly (680.8142) | EACH | 8 | $494.00 | $300.00 |
| 561 | Pedestrian Signal Module - 12-inch Countdown Timer, LED (680.815001) | EACH | 58 | $505.00 | $315.00 |
| 562 | (680.8151) | EACH | 55 | $2,190.00 | $1,500.00 |
| 563 | (680.81990003) | 56 | $501.00 | $400.00 | |
| 564 | (680.8201) | EACH | 3 | $1,790.00 | $1,000.00 |
| 565 | (680.8207) | EACH | 22 | $1,170.00 | $1,000.00 |
| 566 | (680.82252210) | 4 | $37,300 | $16,000 | |
| 567 | (680.82501009) | 4 | $2,980.00 | $1,200.00 | |
| 568 | (680.82505009) | 3 | $3,510.00 | $1,725.00 | |
| 569 | (680.82516009) | 3 | $7,030.00 | $4,500.00 | |
| 570 | (680.82540009) | 868 | $15.60 | $3.40 | |
| 571 | (680.83010005) | 1,024 | $5.05 | $4.75 | |
| 572 | (680.90000005) | 4 | $4,280.00 | $2,100.00 | |
| 573 | (680.90920103) | 4 | $2,650.00 | $825.00 | |
| 574 | Watertight Disconnect Box (680.9401) | EACH | 4 | $2,180.00 | $2,250.00 |
| 575 | Meter Pan (680.9402) | EACH | 4 | $1,790.00 | $825.00 |
| 576 | Install Electrical Disconnect/Generator Transfer Switch (680.9499) | EACH | 8 | $2,300.00 | $450.00 |
| 577 | (680.950106) | LF | 696 | $18.00 | $4.00 |
| 578 | Performance Concrete Quality Adjustment (680.99) | QUALITY UNIT | 1 | $21.25 | $21.25 |
| 579 | (683.94000404) | 780 | $62.10 | $38.00 | |
| 580 | White Epoxy Reflectorized Pavement Stripes - 20 mil (685.1102) | LF | 35,139 | $2.35 | $1.55 |
| 581 | Yellow Epoxy Reflectorized Pavement Stripes - 20 mil (685.1202) | LF | 25,354 | $2.35 | $1.55 |
| 582 | (685.16010014) | 24,094 | $4.65 | $3.15 | |
| 583 | (685.17010014) | 12,633 | $4.65 | $3.15 | |
| 584 | White Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3104) | LF | 10,674 | $5.45 | $3.75 |
| 585 | Yellow Epoxy Reflectorized Pavement Special Stripes - 20 mil Portable/Hand Application (685.3204) | LF | 27,193 | $5.45 | $3.75 |
| 586 | White Epoxy Reflectorized Pavement Letters - 20 mil Portable/Hand Application (685.3304) | EACH | 20 | $155.00 | $105.00 |
| 587 | White Epoxy Reflectorized Pavement Symbols - 20 mil Portable/Hand Application (685.3404) | EACH | 42 | $466.00 | $105.00 |
| 588 | (691.04000020) | 294,000 | $1.00 | $1.00 | |
| 589 | (691.14000015) | 1,240,000 | $1.00 | $1.00 | |
| 590 | Field Change Payment (FCP) (697.03) | DOL | 22,194,000 | $1.00 | $1.00 |
| 591 | Asphalt Price Adjustment (698.04) | DOL | 81,152 | $1.00 | $1.00 |
| 592 | Fuel Price Adjustment (698.05) | DOL | 142,100 | $1.00 | $1.00 |
| 593 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 |
| 594 | (698.93940008) | LS | 1 | $600,000 | $600,000 |
| 595 | Mobilization (699.040001) | LS | 1 | $9,630,637 | $10,000,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of March 20, 2025. Compiled by Mirage Metrics.