NYSDOT contract D265527 bid tabulation
GUIDERAIL REHABILITATION VARIOUS LOCATIONS. Let by New York State DOT on July 10, 2025, Nassau, Suffolk, Region 10. 3 bids received; low bid $2,599,159 by United Fence and Guard Rail Corp.
- Owner
- New York State DOT
- Letting
- 10 JUL 2025
- Pay items
- 97
- Data through
- 15 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | United Fence and Guard Rail Corp | $2,599,159 | Low |
| 2 | H & L Contracting LLC | $2,615,489 | +1.0% |
| 3 | Constar Inc | $3,342,018 | +29% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. United Fence and Guard Rail Corp | 2. H & L Contracting LLC | 3. Constar Inc |
|---|---|---|---|---|---|---|
| 1 | Clearing and Grubbing (201.06) | LS | 1 | $15,000 | $15,000 | $25,000 |
| 2 | Unclassified Excavation and Disposal (203.02) | CY | 298 | $240.00 | $250.00 | $100.00 |
| 3 | (206.03100010) | 20 | $200.00 | $50.00 | $100.00 | |
| 4 | Test Pit Excavation (206.05) | EACH | 2 | $500.00 | $950.00 | $100.00 |
| 5 | (304.00010018) | 271 | $5.00 | $1.00 | $5.00 | |
| 6 | (304.10119917) | 10 | $400.00 | $70.00 | $200.00 | |
| 7 | (404.0001) | TON | 2 | $125.00 | $125.00 | $125.00 |
| 8 | (404.0981) | TON | 7 | $500.00 | $750.00 | $400.00 |
| 9 | (404.1989) | TON | 12 | $400.00 | $650.00 | $400.00 |
| 10 | (404.2589) | TON | 18 | $400.00 | $550.00 | $400.00 |
| 11 | Diluted Tack Coat (407.0102) | GAL | 7 | $25.00 | $5.00 | $10.00 |
| 12 | Asphalt Pavement Joint Adhesive (418.7603) | LF | 528 | $10.00 | $9.00 | $8.00 |
| 13 | Sealing Transverse Joints- Highway Joint Sealant (502.9210) | LF | 46 | $70.00 | $40.00 | $12.00 |
| 14 | Sealing Longitudinal Joints-Highway Joint Sealant (502.9310) | LF | 64 | $70.00 | $29.00 | $10.00 |
| 15 | (510.02210018) | 8 | $3,200.00 | $2,000.00 | $1,500.00 | |
| 16 | (510.20000018) | 31 | $350.00 | $400.00 | $200.00 | |
| 17 | (510.81000018) | 36 | $100.00 | $160.00 | $75.00 | |
| 18 | (520.09000010) | 829 | $5.00 | $4.10 | $8.00 | |
| 19 | Drilling and Grouting Bolts or Reinforcing Bars (586.0201) | EACH | 12 | $100.00 | $75.00 | $100.00 |
| 20 | (604.07200110) | 3 | $2,500.00 | $4,000.00 | $3,500.00 | |
| 21 | Box Beam Guide Railing (606.10) | LF | 611 | $125.00 | $66.00 | $140.00 |
| 22 | Box Beam Guide Railing (Shop Bent or Shop Mitered) (606.100002) | LF | 96 | $135.00 | $82.00 | $160.00 |
| 23 | Box Beam End Piece (606.120101) | EACH | 3 | $1,800.00 | $750.00 | $1,200.00 |
| 24 | Box Beam Guide Railing End Assembly Type I (606.120102) | EACH | 2 | $7,500.00 | $5,000.00 | $10,000 |
| 25 | Weak-Post, Corrugated Beam Guide Rail (606.18) | LF | 832 | $45.00 | $41.00 | $60.00 |
| 26 | Anchorage Units for Corrugated Beam Guide Railing (606.22) | EACH | 2 | $2,500.00 | $2,900.00 | $5,000.00 |
| 27 | HPBO (Mod.) Corrugated Beam Guide Railing End Terminal (Energy-Absorbing) (606.27) | EACH | 4 | $5,400.00 | $5,600.00 | $6,000.00 |
| 28 | HPBO (Mod.) Corrugated Beam Guide Railing (606.2701) | LF | 7,489 | $50.00 | $45.00 | $60.00 |
| 29 | HPBO (Mod.) Corrugated Beam Guide Railing with Extra Long Posts (606.2702) | LF | 75 | $65.00 | $60.00 | $75.00 |
| 30 | Anchorage Units for HPBO (Mod.) Corrugated Beam Guide Railing (606.2703) | EACH | 17 | $3,700.00 | $3,600.00 | $5,000.00 |
| 31 | HPBO (Mod.) Corrugated Beam Median Barrier End Terminal (Energy-Absorbing) (606.28) | EACH | 3 | $14,500 | $10,000 | $12,500 |
| 32 | HPBO (Mod.) Corrugated Beam Median Barrier (606.2801) | LF | 2,050 | $65.00 | $56.00 | $70.00 |
| 33 | Anchorage Units for HPBO (Mod.) Corrugated Beam Median Barrier (606.2802) | EACH | 1 | $4,500.00 | $6,000.00 | $5,500.00 |
| 34 | Single-Slope Concrete Median Barrier (Optional) (606.3041) | LF | 80 | $925.00 | $185.00 | $300.00 |
| 35 | I-Beam Posts for Existing Box Beam Guide Railing (606.4809) | EACH | 5 | $125.00 | $123.00 | $400.00 |
| 36 | I-Beam posts for Existing HPBO (Mod.) Corrugated Beam Guide Railing (606.4818) | EACH | 11 | $100.00 | $100.00 | $400.00 |
| 37 | Removing and Disposing Corrugated Beam Guide Railing (606.71) | LF | 1,110 | $10.00 | $14.00 | $15.00 |
| 38 | Removing and Disposing HPBO (Mod.) Corrugated Beam Guide Railing (606.7101) | LF | 6,173 | $10.00 | $14.00 | $15.00 |
| 39 | Removing and Disposing Box Beam Guide Railing (606.73) | LF | 1,668 | $12.00 | $14.00 | $15.00 |
| 40 | Removing and Disposing Box Beam Median Barrier (606.74) | LF | 2,025 | $12.00 | $14.00 | $20.00 |
| 41 | Removing and Disposing of Guide Posts, Guide Rail Posts, and Median Barrier Posts (606.76) | EACH | 15 | $10.00 | $100.00 | $50.00 |
| 42 | Removing and Disposing Anchorage Units for Corrugated Beam Guide Railing and Median Barrier (606.7910) | EACH | 3 | $300.00 | $350.00 | $600.00 |
| 43 | Removing and Disposing Box Beam Guide Rail Turned-Down Terminal (606.7920) | EACH | 15 | $300.00 | $350.00 | $600.00 |
| 44 | Removing and Disposing Box Beam Median Barrier End Assembly-Type A (606.7930) | EACH | 4 | $300.00 | $350.00 | $2,000.00 |
| 45 | Removing and Disposing Box Beam Median Barrier End Assembly--Type B (606.7931) | EACH | 2 | $300.00 | $350.00 | $1,000.00 |
| 46 | Removing and Disposing Anchorage Units for HPBO(Mod) Corrugated Beam Guide Railing (606.7941) | EACH | 12 | $300.00 | $350.00 | $800.00 |
| 47 | Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Weak Post Corrugated Beam Guide Railing (606.8902) | EACH | 1 | $9,000.00 | $4,500.00 | $15,000 |
| 48 | Transition: HPBO (Mod.) Corrugated Beam Guide Railing to Single Slope Concrete Half Section Barrier (606.8903) | EACH | 2 | $12,500 | $6,500.00 | $15,000 |
| 49 | Transition between Standard (NJ) Concrete Barrier and Single-Slope Concrete Barrier (606.9001) | EACH | 3 | $25,000 | $15,000 | $15,000 |
| 50 | (607.31020010) | 900 | $65.00 | $44.00 | $110.00 | |
| 51 | (607.62000010) | 900 | $9.00 | $12.00 | $20.00 | |
| 52 | Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.000013) | QUALITY UNIT | 40 | $125.00 | $125.00 | $125.00 |
| 53 | Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips (608.020102) | TON | 790 | $325.00 | $600.00 | $475.00 |
| 54 | (609.04070510) | 1,270 | $85.00 | $66.00 | $125.00 | |
| 55 | (609.06000008) | 1,270 | $15.00 | $25.00 | $40.00 | |
| 56 | Topsoil - Roadside (610.1402) | CY | 270 | $100.00 | $98.00 | $60.00 |
| 57 | Turf Establishment - Roadside (610.1601) | SY | 2,428 | $6.00 | $5.00 | $5.00 |
| 58 | Basic Work Zone Traffic Control (619.01) | LS | 1 | $225,000 | $165,000 | $425,000 |
| 59 | Type III Construction Barricades (619.04) | EACH | 6 | $50.00 | $160.00 | $120.00 |
| 60 | (619.10050020) | 374 | $2.00 | $20.00 | $20.00 | |
| 61 | (619.111133) | EACH | 4 | $6,000.00 | $14,000 | $5,000.00 |
| 62 | Nighttime Operations (Entire Project) (619.24) | LS | 1 | $2,500.00 | $8,500.00 | $75,000 |
| 63 | Traffic Control Supervisor (619.25) | MONTH | 9 | $100.00 | $100.00 | $100.00 |
| 64 | Pavement Patching (Force Acount) (619.2601) | DOL | 10,000 | $1.00 | $1.00 | $1.00 |
| 65 | (621.05020004) | 11,911 | $2.00 | $5.50 | $2.00 | |
| 66 | Survey Operations (625.01) | LS | 1 | $2,500.00 | $7,500.00 | $25,000 |
| 67 | (625.09010015) | LS | 1 | $2,500.00 | $2,000.00 | $5,000.00 |
| 68 | (634.10010015) | LS | 1 | $600.00 | $550.00 | $50,000 |
| 69 | Engineer’s Field Office – Type 2 (637.12) | MONTH | 12 | $5,500.00 | $8,000.00 | $4,000.00 |
| 70 | Office Technology and Supplies (637.34) | DOL | 5,000 | $1.00 | $1.00 | $1.00 |
| 71 | Construction Testing supplies – Consumables (637.36) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 72 | Ground-Mounted Sign Panels less than or equal to 32 SF with Z-bars (645.5102) | SF | 5 | $80.00 | $76.00 | $75.00 |
| 73 | Type A Sign Posts (645.81) | EACH | 45 | $250.00 | $260.00 | $275.00 |
| 74 | (645.81090003) | 5 | $50.00 | $51.00 | $75.00 | |
| 75 | Large Delineator, Large Snowplowing Marker, Large Supplementary Snowplowing Marker Panel (646.23) | EACH | 132 | $25.00 | $21.00 | $50.00 |
| 76 | Reference Marker, Delineator, Snowplowing Marker, Supplementary Snowplowing Marker Panels Relocation (646.24) | EACH | 3 | $125.00 | $44.00 | $100.00 |
| 77 | Steel Post, 1.1 lb/ft (646.31) | EACH | 3 | $250.00 | $42.00 | $100.00 |
| 78 | Steel Post, 2.0 lb/ft (646.32) | EACH | 105 | $250.00 | $62.00 | $200.00 |
| 79 | Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.31) | EACH | 25 | $350.00 | $90.00 | $400.00 |
| 80 | Relocate Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.32) | EACH | 1 | $1,250.00 | $690.00 | $2,000.00 |
| 81 | Remove and Store Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) (647.41) | EACH | 25 | $100.00 | $110.00 | $500.00 |
| 82 | Remove and Store Sign Panel, Sign Panel Assembly Size II (30-100 Square Feet) (647.42) | EACH | 1 | $500.00 | $350.00 | $1,200.00 |
| 83 | (647.83001002) | 15 | $50.00 | $19.00 | $50.00 | |
| 84 | Relocate Impact Attenuator (654.08) | EACH | 1 | $7,500.00 | $24,000 | $20,000 |
| 85 | Cast Frame F3, Mountable Curb Box CM3 & Reticuline Grate G3 (655.0703) | EACH | 3 | $5,000.00 | $2,130.00 | $3,000.00 |
| 86 | (670.14480010) | 1 | $3,000.00 | $200.00 | $2,000.00 | |
| 87 | (680.520203) | LF | 20 | $30.00 | $20.00 | $25.00 |
| 88 | Inductance Loop Installation (680.54) | LF | 52 | $50.00 | $45.00 | $40.00 |
| 89 | Inductance Loop Wire (680.72) | LF | 104 | $2.00 | $2.00 | $4.00 |
| 90 | (680.83200010) | LS | 1 | $15,000 | $5,000.00 | $50,000 |
| 91 | (685.07200310) | 2 | $500.00 | $500.00 | $250.00 | |
| 92 | (685.07200610) | 438 | $9.00 | $9.00 | $10.00 | |
| 93 | Field Change Payment (FCP) (697.03) | DOL | 244,000 | $1.00 | $1.00 | $1.00 |
| 94 | Asphalt Price Adjustment (698.04) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 95 | Fuel Price Adjustment (698.05) | DOL | 182 | $1.00 | $1.00 | $1.00 |
| 96 | Steel/Iron Price Adjustment (698.06) | DOL | 100 | $1.00 | $1.00 | $1.00 |
| 97 | Mobilization (699.040001) | LS | 1 | $99,968 | $91,800 | $128,500 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from NYSDOT's tabulation for this contract. NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
Every contract let that day: NYSDOT letting of July 10, 2025. Compiled by Mirage Metrics.