United Fence and Guard Rail Corp: NYSDOT bid record
United Fence and Guard Rail Corp submitted 11 bids on New York State DOT contracts in the data, from 21 JUL 2022 to 27 AUG 2026, and was the low bidder on 9 of them (82%).
- Owner
- New York State DOT
- Low bid volume
- $42,431,970
- Latest bid
- 27 AUG 2026
- Data through
- 15 OCT 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2022 | 1 | 1 | 100% |
| 2023 | 3 | 2 | 67% |
| 2024 | 3 | 2 | 67% |
| 2025 | 2 | 2 | 100% |
| 2026 | 2 | 2 | 100% |
By region
| Region | Bids | Low bids | Win rate |
|---|---|---|---|
| Region 10 | 10 | 9 | 90% |
| Region 11 | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Field Change Payment (FCP) | 697.03 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Office Technology and Supplies | 637.34 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Fuel Price Adjustment | 698.05 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Steel/Iron Price Adjustment | 698.06 | DOL | 11 | 11 (100%) | $1.00 | $1.00 |
| Construction Testing supplies – Consumables | 637.36 | DOL | 10 | 10 (100%) | $1.00 | $1.00 |
| Asphalt Price Adjustment | 698.04 | DOL | 8 | 8 (100%) | $1.00 | $1.00 |
| Type A Sign Posts | 645.81 | EACH | 10 | 7 (70%) | $250.00 | $250.00 |
| Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.020102 | TON | 9 | 7 (78%) | $300.00 | $307.93 |
| Relocate Sign Panel, Sign Panel Assembly Size I (Under 30 Square Feet) | 647.31 | EACH | 8 | 6 (75%) | $175.00 | $203.00 |
| Type III Construction Barricades | 619.04 | EACH | 6 | 6 (100%) | $17.50 | $115.00 |
| 691.04000020 | 6 | 6 (100%) | $1.00 | $1.00 | ||
| Plant Production Quality Adjustment to Asphalt Sidewalks, Driveways, Bicycle Paths, and Vegetation Control Strips | 608.000013 | QUALITY UNIT | 6 | 6 (100%) | $125.00 | $90.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| Constar Inc | 11 | 2 of 11 |
| H & L Contracting LLC | 6 | 2 of 6 |
| Westmoreland Construction Inc | 3 | 1 of 3 |
| Liberty II Sweeping and Maintenance Inc | 2 | 1 of 2 |
| Coastal Contracting Corp | 2 | 1 of 2 |
| Kinturk Contracting Corp | 1 | 1 of 1 |
| Es II Enterprises LLC /DBA El Sol Enterprises | 1 | 0 of 1 |
| Road Safety Systems LLC | 1 | 0 of 1 |
Latest bids
| Let | Contract | Region | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 27 AUG 2026 | D265833 | Region 10 | Curve Warning Sign Upgrades Various Highways and Roadways | 1 of 4 | $3,592,264 | Low, 23% under the second |
| 16 JUL 2026 | D265804 | Region 10 | Overhead Sign Structure Replace Nassau & Suffolk | 1 of 5 | $5,756,313 | Low, 32% under the second |
| 07 AUG 2025 | D265528 | Region 10 | Sign Requirements Contract - Various Locations | 1 of 2 | $3,534,761 | Low, 9.0% under the second |
| 10 JUL 2025 | D265527 | Region 10 | GUIDERAIL REHABILITATION VARIOUS LOCATIONS | 1 of 3 | $2,599,159 | Low, 1.0% under the second |
| 11 JUL 2024 | D265269 | Region 10 | GUIDE RAIL REPLACEMENT - Various Locations. | 4 of 4 | $3,547,624 | +11% |
| 14 MAR 2024 | D265040 | Region 10 | Rustic Rail Replacement Various Locations Nassau Suffolk | 1 of 3 | $6,972,763 | Low, 3.0% under the second |
| 25 JAN 2024 | D265047 | Region 10 | Guide Rail Rehabilitation - Nassau & Suffolk Counties | 1 of 3 | $3,723,639 | Low, 12% under the second |
| 14 DEC 2023 | D265090 | Region 11 | Sign Panel Replacements at Rte-9A, BQE, LIE and GCP | 6 of 6 | $6,860,173 | +99% |
| 14 SEP 2023 | D265066 | Region 10 | Overhead Sign Structure Replacements, Various Towns | 1 of 3 | $5,585,981 | Low, 20% under the second |
| 01 JUN 2023 | D265012 | Region 10 | Sign Requirements Contract 20 Various Locations | 1 of 2 | $3,994,229 | Low, 2.0% under the second |
| 21 JUL 2022 | D264830 | Region 10 | ROBERT MOSES CAUSEWAY GUIDE RAIL REHABILITATION | 1 of 3 | $6,672,862 | Low, 9.0% under the second |
How this record was read
NYSDOT construction bid tabulation PDFs (vendor ranking and spread report), one per contract, January 2022 to October 2026. NYSDOT prints pay item numbers without descriptions or units, so items are found by number. For A+B contracts the item total is kept and the time part dropped.
- Every bid counted here matched its published total to within one dollar; NYSDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.