ODOT contract 250048 bid tabulation
GEA-SR 86-05.37 (TWO LANE RESURFACING). Let by Ohio DOT on January 30, 2025, GEA. 2 bids received; low bid $1,245,215 by Ronyak Paving Inc, -14% against the engineer's estimate of $1,447,000.
- Owner
- Ohio DOT
- Letting
- 30 JAN 2025
- Pay items
- 37
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Ronyak Paving Inc | $1,245,215 | Low | -14% |
| 2 | Karvo Companies Inc | $1,362,123 | +9.0% | -6.0% |
Engineer's estimate: $1,447,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Ronyak Paving Inc | 2. Karvo Companies Inc |
|---|---|---|---|---|---|
| 1 | Excavation (203E10000) | CY | 25 | $20.00 | $25.00 |
| 2 | Linear grading, as per plan (209E60501) | MI | 6.02 | $1,000.00 | $1,575.00 |
| 3 | Preparing subgrade for shoulder paving, as per plan (209E72051) | MI | 6.02 | $700.00 | $420.00 |
| 4 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 5 | Partial depth pavement repair (441) (251E01000) | SY | 700 | $55.00 | $49.00 |
| 6 | Pavement repair (253E02000) | CY | 750 | $210.00 | $285.00 |
| 7 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 238 | $6.00 | $21.00 |
| 8 | Pavement planing, asphalt concrete, as per plan, 2 (254E01001) | SY | 45,359 | $2.00 | $1.75 |
| 9 | Aggregate base (304E20000) | CY | 25 | $50.00 | $45.00 |
| 10 | Non-tracking tack coat (407E20000) | GAL | 6,385 | $3.00 | $2.75 |
| 11 | Asphalt concrete surface course, type 1, (446), as per plan (441E10101) | CY | 2,017 | $220.00 | $235.00 |
| 12 | Asphalt concrete intermediate course, type 1, (448) (441E50200) | CY | 1,261 | $185.00 | $195.00 |
| 13 | Asphalt concrete surface course, type 1, (449), as per plan (441E70101) | CY | 10 | $395.00 | $565.00 |
| 14 | Compacted aggregate, as per plan (617E10101) | CY | 203 | $100.00 | $130.00 |
| 15 | Longitudinal joint preparation (874E20000) | FT | 16,983 | $0.50 | $1.15 |
| 16 | RPM (621E00100) | EACH | 229 | $45.50 | $44.00 |
| 17 | Raised pavement marker removed (621E54000) | EACH | 161 | $1.00 | $6.00 |
| 18 | Edge line, 6" (646E10010) | MI | 6.44 | $2,650.00 | $2,750.00 |
| 19 | Center line (646E10200) | MI | 3.23 | $3,100.00 | $3,200.00 |
| 20 | Stop line (646E10400) | FT | 27 | $12.00 | $12.00 |
| 21 | Special - inventory existing pavement markings (690E98400) | LS | 1 | $350.00 | $350.00 |
| 22 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 80 | $100.00 | $90.00 |
| 23 | Work zone marking sign (614E12460) | EACH | 6 | $65.00 | $65.00 |
| 24 | Asphalt concrete for maintaining traffic (614E13000) | CY | 50 | $125.00 | $210.00 |
| 25 | Portable changeable message sign, as per plan (614E18601) | SNMT | 12 | $800.00 | $800.00 |
| 26 | Work zone center line, class I, 642 paint (614E21100) | MI | 6.46 | $900.00 | $900.00 |
| 27 | Work zone center line, class III, 642 paint (614E21550) | MI | 3.23 | $900.00 | $900.00 |
| 28 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 12.88 | $700.00 | $700.00 |
| 29 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 6.44 | $650.00 | $650.00 |
| 30 | Work zone stop line, class I, 642 paint (614E26200) | FT | 54 | $3.00 | $3.00 |
| 31 | Work zone stop line, class III, 642 paint (614E26610) | FT | 27 | $3.00 | $3.00 |
| 32 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 300 | $15.00 | $15.00 |
| 33 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $8,699.00 | $6,000.00 |
| 34 | Maintaining traffic (614E11000) | LS | 1 | $69,000 | $47,000 |
| 35 | Field office, type B, as per plan (619E16011) | MNTH | 6 | $1,500.00 | $1,800.00 |
| 36 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $4,650.00 | $2,000.00 |
| 37 | Mobilization (624E10000) | LS | 1 | $34,575 | $66,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of January 30, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way