| 1 | Clearing and grubbing (201E11000) | LS | 1 | $5,000.00 |
| 2 | Pavement removed (202E23000) | SY | 364 | $30.00 |
| 3 | Walk removed (202E30000) | SF | 2,155 | $2.00 |
| 4 | Curb removed (202E32000) | FT | 420 | $8.00 |
| 5 | Removal misc.: polymer modified asphalt expansion (202E98200) | FT | 104 | $60.00 |
| 6 | Subgrade compaction (204E10000) | SY | 251 | $9.00 |
| 7 | 4" concrete walk (608E10000) | SF | 2,060 | $15.00 |
| 8 | Curb ramp (608E52000) | SF | 701 | $30.00 |
| 9 | Curb ramp, as per plan (608E52001) | SF | 80 | $30.00 |
| 10 | Detectable warning, as per plan (608E53021) | SF | 22 | $70.00 |
| 11 | Delineator, post ground mounted, as per plan (620E00501) | EACH | 3 | $395.00 |
| 12 | Removal of delineator (620E31200) | EACH | 3 | $40.00 |
| 13 | Monument assembly adjusted to grade (623E39500) | EACH | 3 | $1,500.00 |
| 14 | Polymer modified asphalt expansion joint system (846E00110) | CF | 65 | $500.00 |
| 15 | Commercial fertilizer (654E11000) | TON | 0.04 | $500.00 |
| 16 | Soil analysis test (659E00100) | EACH | 2 | $150.00 |
| 17 | Topsoil (659E00300) | CY | 30 | $200.00 |
| 18 | Seeding and mulching, class 1 (659E00500) | SY | 271 | $14.50 |
| 19 | Repair seeding and mulching (659E14000) | SY | 14 | $3.50 |
| 20 | Inter-seeding (659E15000) | SY | 14 | $0.25 |
| 21 | Lime (659E31000) | ACRE | 0.06 | $100.00 |
| 22 | Water (659E35000) | MGAL | 2 | $1.00 |
| 23 | Mowing (659E40000) | MSF | 1 | $1,000.00 |
| 24 | Catch basin grate, as per plan (611E98645) | EACH | 10 | $400.00 |
| 25 | Pavement planing, asphalt concrete, 1.50" (254E01000) | SY | 7,695 | $4.50 |
| 26 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 57 | $600.00 |
| 27 | Aggregate base (304E20000) | CY | 42 | $325.00 |
| 28 | Non-tracking tack coat (407E20000) | GAL | 720 | $3.25 |
| 29 | Asphalt concrete surface course, type 1, (449), PG64-22 (441E70000) | CY | 2 | $750.00 |
| 30 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 15 | $650.00 |
| 31 | Asphalt concrete surface course, 9.5 MM, type A (4 (442E00201) | CY | 330 | $225.00 |
| 32 | Curb, type 6 (609E26000) | FT | 372 | $60.00 |
| 33 | Ground mounted support, no. 3 post (630E03100) | FT | 309 | $19.00 |
| 34 | Sign support assembly, bridge mounted, type 1 (630E79600) | EACH | 1 | $2,880.00 |
| 35 | Sign, flat sheet (630E80100) | SF | 126 | $21.50 |
| 36 | Removal of ground mounted sign and disposal (630E84900) | EACH | 7 | $15.00 |
| 37 | Removal of ground mounted sign and reerection (630E85100) | EACH | 2 | $65.00 |
| 38 | Removal of miscellaneous traffic control item: rem (630E89902) | EACH | 14 | $267.70 |
| 39 | Signing, misc.: solar powered rectangular rapid F (630E97700) | EACH | 2 | $10,000 |
| 40 | Edge line, 6" (644E00104) | MI | 0.46 | $4,200.00 |
| 41 | Center line (644E00300) | MI | 0.38 | $5,950.00 |
| 42 | Channelizing line, 8" (644E00400) | FT | 1,483 | $2.00 |
| 43 | Stop line (644E00500) | FT | 144 | $6.50 |
| 44 | Crosswalk line, 12" (644E00620) | FT | 652 | $4.50 |
| 45 | Crosswalk line, 24" (644E00630) | FT | 513 | $6.50 |
| 46 | Transverse/diagonal line (644E00700) | FT | 503 | $6.50 |
| 47 | Transverse/diagonal line (644E00700) | FT | 46 | $6.50 |
| 48 | Lane arrow (644E01300) | EACH | 11 | $90.00 |
| 49 | Word on pavement, 72" (644E01400) | EACH | 1 | $350.00 |
| 50 | Dotted line, 6" (644E01510) | FT | 418 | $0.75 |
| 51 | Shared lane marking (644E19000) | EACH | 11 | $300.00 |
| 52 | Yield line (644E20800) | FT | 24 | $10.00 |
| 53 | Conduit, 3", 725.051 (625E25504) | FT | 104 | $16.00 |
| 54 | Conduit, 4", 725.051 (625E25604) | FT | 4 | $100.00 |
| 55 | Conduit, jacked or drilled, 725.052, 4" (625E25908) | FT | 237 | $62.00 |
| 56 | Trench (625E29000) | FT | 110 | $25.00 |
| 57 | Pull box, 725.06, size 1.5 (625E30500) | EACH | 2 | $700.00 |
| 58 | Pull box, misc.: 27" round (625E31600) | EACH | 2 | $4,000.00 |
| 59 | Ground rod (625E32000) | EACH | 8 | $300.00 |
| 60 | Pedestrian signal head (LED), type D2, countdown, as per plan (632E20731) | EACH | 8 | $800.00 |
| 61 | Covering of pedestrian signal head (632E25010) | EACH | 8 | $40.00 |
| 62 | Pedestrian pushbutton (632E26000) | EACH | 8 | $350.00 |
| 63 | Signal cable, 5 conductor, no. 14 AWG (632E40500) | FT | 1,015 | $3.50 |
| 64 | Pedestal foundation (632E64020) | EACH | 8 | $1,500.00 |
| 65 | Test hole performed (632E64950) | EACH | 1 | $2,000.00 |
| 66 | Loop detector lead-in cable (632E65200) | FT | 1,015 | $2.60 |
| 67 | Power cable, 2 conductor, no. 6 AWG (632E68200) | FT | 199 | $6.00 |
| 68 | Pedestal, 8', transformer base, as per plan (632E89901) | EACH | 7 | $440.00 |
| 69 | Pedestal, misc.: 21', transformer base, as per pla (632E90010) | EACH | 1 | $500.00 |
| 70 | Stop line radar detection, as per plan (809E69101) | EACH | 1 | $9,500.00 |
| 71 | Detour signing (614E12420) | LS | 1 | $2,500.00 |
| 72 | Work zone marking sign (614E12460) | EACH | 4 | $85.00 |
| 73 | Work zone lane line, class I, 6" (614E20010) | MI | 0.40 | $750.00 |
| 74 | Business entrance sign (614E40050) | EACH | 1 | $300.00 |
| 75 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $2,500.00 |
| 76 | Maintaining traffic, as per plan (614E11001) | LS | 1 | $52,270 |
| 77 | Field office, type B (619E16010) | MNTH | 6 | $3,500.00 |
| 78 | Construction layout stakes and surveying (623E10000) | LS | 1 | $10,000 |
| 79 | Mobilization (624E10000) | LS | 1 | $20,000 |
| 100 | Erosion control (832E30000) | EACH | 4,517 | $1.00 |