ODOT contract 250473 bid tabulation
TUS-SR 39-02.96 (TWO LANE RESURFACING). Let by Ohio DOT on October 9, 2025, TUS. 3 bids received; low bid $1,964,603 by Shelly Company, +34% against the engineer's estimate of $1,471,000.
- Owner
- Ohio DOT
- Letting
- 09 OCT 2025
- Pay items
- 30
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $1,964,603 | Low | +34% |
| 2 | Karvo Companies Inc | $1,987,645 | +1.0% | +35% |
| 3 | Shelly & Sands Inc | $2,442,166 | +24% | +66% |
Engineer's estimate: $1,471,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Karvo Companies Inc | 3. Shelly & Sands Inc |
|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 1,444 | $12.00 | $18.00 | $10.00 |
| 2 | Special - mailbox support system, double (690E50200) | EACH | 1 | $800.00 | $750.00 | $1,150.00 |
| 3 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 | $1.00 |
| 4 | Full depth pavement removal and rigid replacement, type 1, class QC MS (255E15000) | SY | 747 | $350.00 | $250.00 | $1,000.00 |
| 5 | Full depth pavement sawing (255E20000) | FT | 2,240 | $2.75 | $2.75 | $39.00 |
| 6 | Tack coat (407E10000) | GAL | 6,862 | $2.75 | $2.35 | $3.25 |
| 7 | Asphalt concrete surface course, type 1, (449), (driveways), as per plan (441E70501) | CY | 60 | $550.00 | $475.00 | $450.00 |
| 8 | Asphalt concrete surface course, 12.5 MM, type B (446) (442E10050) | CY | 3,305 | $290.00 | $285.00 | $235.00 |
| 9 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 7.42 | $625.00 | $925.00 | $670.00 |
| 10 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 3.71 | $625.00 | $625.00 | $670.00 |
| 11 | Longitudinal joint preparation (874E21000) | MI | 3.71 | $10,000 | $6,500.00 | $5,000.00 |
| 12 | Pavement planing, asphalt concrete, class A (1.5") (897E01010) | SY | 79,295 | $2.05 | $2.30 | $2.25 |
| 13 | RPM (621E00100) | EACH | 465 | $39.75 | $36.51 | $39.75 |
| 14 | Raised pavement marker removed (621E54000) | EACH | 891 | $5.00 | $1.00 | $4.27 |
| 15 | Edge line, 6" (646E10010) | MI | 8.66 | $3,100.00 | $3,000.00 | $3,100.00 |
| 16 | Center line (646E10200) | MI | 6.45 | $3,475.00 | $4,250.00 | $3,475.00 |
| 17 | Channelizing line, 8" (646E10300) | FT | 2,293 | $1.35 | $2.00 | $1.35 |
| 18 | Stop line (646E10400) | FT | 303 | $12.50 | $13.00 | $12.50 |
| 19 | Transverse/diagonal line (646E10600) | FT | 2,948 | $7.00 | $13.00 | $7.00 |
| 20 | Island marking (646E10800) | SF | 224 | $7.00 | $20.00 | $7.00 |
| 21 | Lane arrow (646E20300) | EACH | 29 | $155.00 | $225.00 | $155.00 |
| 22 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 180 | $100.00 | $125.00 | $102.00 |
| 23 | Work zone marking sign (614E12460) | EACH | 41 | $88.00 | $80.00 | $88.00 |
| 24 | Work zone center line, class II, 642 paint (614E21500) | MI | 8.66 | $650.00 | $400.00 | $330.00 |
| 25 | Work zone center line, class III, 642 paint (614E21550) | MI | 8.66 | $1,285.00 | $1,200.00 | $1,175.00 |
| 26 | Work zone channelizing line, class III, 8", 642 paint (614E23680) | FT | 6,879 | $1.00 | $0.65 | $0.65 |
| 27 | Work zone stop line, class III, 642 paint (614E26610) | FT | 909 | $6.50 | $5.00 | $3.00 |
| 28 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $6,000.00 | $25,000 | $8,489.00 |
| 29 | Maintaining traffic (614E11000) | LS | 1 | $258,000 | $162,000 | $280,000 |
| 30 | Mobilization (624E10000) | LS | 1 | $40,000 | $200,000 | $125,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of October 9, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.