ODOT contract 250516 bid tabulation
CLE-US CHIP FY2026 (CHIP SEAL). Let by Ohio DOT on November 13, 2025, CLE. 3 bids received; low bid $624,408 by Runway Incorporated, -14% against the engineer's estimate of $728,000.
- Owner
- Ohio DOT
- Letting
- 13 NOV 2025
- Pay items
- 16
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Runway Incorporated | $624,408 | Low | -14% |
| 2 | SC Construction & Materials LLC | $641,464 | +3.0% | -12% |
| 3 | Shelly Company | $763,910 | +22% | +5.0% |
Engineer's estimate: $728,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Runway Incorporated | 2. SC Construction & Materials LLC | 3. Shelly Company |
|---|---|---|---|---|---|---|
| 1 | Pavement repair (253E02000) | CY | 70 | $226.60 | $375.00 | $755.00 |
| 2 | Aggregate, single chip seal, type A (422E11000) | SY | 137,977 | $0.94 | $1.00 | $1.48 |
| 3 | Emulsion, chip seal (422E25000) | GAL | 55,191 | $3.25 | $3.50 | $3.20 |
| 4 | Fog seal (886E11000) | GAL | 20,696 | $2.89 | $2.50 | $3.05 |
| 5 | RPM (621E00100) | EACH | 586 | $47.25 | $40.00 | $40.00 |
| 6 | Raised pavement marker removed (621E54000) | EACH | 586 | $18.38 | $20.00 | $17.00 |
| 7 | Edge line, 6", type 1, as per plan (642E00105) | MI | 17.76 | $777.65 | $755.00 | $755.00 |
| 8 | Center line, type 1, as per plan (642E00301) | MI | 8.88 | $1,133.00 | $1,100.00 | $1,100.00 |
| 9 | Removal of pavement marking (644E30030) | MI | 26.64 | $1,096.95 | $1,065.00 | $1,065.00 |
| 10 | Work zone center line, class I, 642 paint (614E21100) | MI | 26.64 | $927.00 | $900.00 | $900.00 |
| 11 | Work zone edge line, class I, 6", 642 paint (614E22110) | MI | 53.28 | $893.01 | $867.00 | $867.00 |
| 12 | Patching concrete bridge deck - type B (519E12300) | SY | 15 | $583.67 | $430.00 | $800.00 |
| 13 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $20,500 | $3,000.00 | $5,000.00 |
| 14 | Maintaining traffic (614E11000) | LS | 1 | $26,597 | $29,000 | $69,000 |
| 15 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $5,985.00 | $5,000.00 | $6,000.00 |
| 16 | Mobilization (624E10000) | LS | 1 | $14,000 | $32,000 | $20,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of November 13, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.