ODOT contract 250562 bid tabulation
MAH-US 224/SR 534-00.00/08.46 (TWO LANE RESURFACING). Let by Ohio DOT on December 4, 2025, MAH. 3 bids received; low bid $4,601,209 by Shelly Company, +0.4% against the engineer's estimate of $4,585,000.
- Owner
- Ohio DOT
- Letting
- 04 DEC 2025
- Pay items
- 110
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Shelly Company | $4,601,209 | Low | 0.0% |
| 2 | Karvo Companies Inc | $4,665,365 | +1.0% | +2.0% |
| 3 | Shelly & Sands Inc | $4,676,860 | +2.0% | +2.0% |
Engineer's estimate: $4,585,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Shelly Company | 2. Karvo Companies Inc | 3. Shelly & Sands Inc |
|---|---|---|---|---|---|---|
| 1 | Wearing course removed (202E23500) | SY | 843 | $25.00 | $5.00 | $18.00 |
| 2 | Walk removed (202E30000) | SF | 196 | $8.00 | $10.00 | $20.00 |
| 3 | Removal misc.: barrier reflector (202E98100) | EACH | 121 | $5.00 | $5.00 | $5.00 |
| 4 | Excavation (203E10000) | CY | 50 | $35.00 | $20.00 | $200.00 |
| 5 | Linear grading (209E60200) | STA | 203 | $90.00 | $75.00 | $100.00 |
| 6 | Preparing subgrade for shoulder paving (209E72000) | STA | 556 | $25.00 | $15.00 | $25.00 |
| 7 | 4" concrete walk (608E10000) | SF | 160 | $20.00 | $18.00 | $15.00 |
| 8 | Curb ramp, as per plan (608E52001) | SF | 36 | $90.00 | $50.00 | $45.00 |
| 9 | Monument assembly adjusted to grade, as per plan (623E39501) | EACH | 11 | $1,750.00 | $2,000.00 | $1,500.00 |
| 10 | Special - as-built construction plans (690E91000) | LS | 1 | $10,000 | $1,000.00 | $2,250.00 |
| 11 | Erosion control (832E30000) | EACH | 3,000 | $1.00 | $1.00 | $1.00 |
| 12 | Partial depth pavement repair (441) (251E01000) | SY | 3,250 | $35.00 | $40.00 | $40.00 |
| 13 | Partial depth pavement repair (441) (251E01000) | SY | 500 | $70.00 | $80.00 | $164.00 |
| 14 | Pavement repair (253E01000) | SY | 750 | $230.00 | $225.00 | $264.00 |
| 15 | Pavement repair (253E01000) | SY | 150 | $215.00 | $125.00 | $218.00 |
| 16 | Pavement planing, asphalt concrete (T = 1.5") (254E01000) | SY | 100,827 | $1.25 | $1.55 | $1.90 |
| 17 | Pavement planing, asphalt concrete, as per plan (T (254E01001) | SY | 84,583 | $2.00 | $2.30 | $2.90 |
| 18 | Aggregate base (304E20000) | CY | 50 | $65.00 | $25.00 | $100.00 |
| 19 | Non-tracking tack coat (407E20000) | GAL | 21,839 | $3.10 | $2.25 | $3.05 |
| 20 | Prime coat, as per plan (408E10001) | GAL | 9,885 | $4.50 | $5.50 | $3.50 |
| 21 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 7,272 | $210.00 | $225.00 | $220.00 |
| 22 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 4,112 | $155.00 | $175.00 | $167.00 |
| 23 | Asphalt concrete surface course, type 1, (449), (driveways) (441E70500) | CY | 24 | $750.00 | $500.00 | $980.00 |
| 24 | Compacted aggregate, as per plan (617E10101) | CY | 687 | $85.00 | $110.00 | $108.00 |
| 25 | Rumble stripes, edge line (asphalt concrete) (618E41000) | MI | 11 | $995.00 | $1,000.00 | $995.00 |
| 26 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 10 | $995.00 | $1,000.00 | $995.00 |
| 27 | Longitudinal joint preparation (874E20000) | FT | 49,369 | $1.50 | $1.00 | $0.50 |
| 28 | RPM (621E00100) | EACH | 769 | $38.00 | $39.90 | $39.70 |
| 29 | Raised pavement marker removed (621E54000) | EACH | 591 | $4.00 | $1.00 | $5.00 |
| 30 | Barrier reflector, type 1, bidirectional (626E00102) | EACH | 20 | $16.00 | $13.00 | $16.00 |
| 31 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 131 | $16.00 | $13.00 | $16.00 |
| 32 | Ground mounted support, no. 2 post (630E02100) | FT | 193 | $18.00 | $25.00 | $18.00 |
| 33 | Sign, flat sheet (630E80100) | SF | 24 | $28.00 | $67.50 | $28.00 |
| 34 | Sign, flat sheet (630E80100) | SF | 18 | $28.00 | $67.50 | $28.00 |
| 35 | Removal of ground mounted sign and disposal (630E84900) | EACH | 22 | $10.00 | $25.00 | $10.00 |
| 36 | Removal of ground mounted post support and disposal (630E86002) | EACH | 20 | $20.00 | $25.00 | $20.00 |
| 37 | Edge line, 6" (646E10010) | MI | 21.38 | $2,800.00 | $2,750.00 | $2,600.00 |
| 38 | Center line (646E10200) | MI | 10.69 | $2,600.00 | $3,250.00 | $3,375.00 |
| 39 | Stop line (646E10400) | FT | 103 | $10.00 | $12.50 | $12.00 |
| 40 | Advance radar detection, as per plan (809E69001) | EACH | 2 | $8,600.00 | $8,660.00 | $8,600.00 |
| 41 | Stop line radar detection, as per plan (809E69101) | EACH | 4 | $8,300.00 | $8,400.00 | $8,250.00 |
| 42 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 100 | $100.00 | $125.00 | $100.00 |
| 43 | Work zone marking sign (614E12460) | EACH | 8 | $85.00 | $85.00 | $109.60 |
| 44 | Asphalt concrete for maintaining traffic (614E13000) | CY | 10 | $135.00 | $300.00 | $800.00 |
| 45 | Portable changeable message sign, as per plan (614E18601) | SNMT | 16 | $900.00 | $900.00 | $988.00 |
| 46 | Work zone center line, class I (614E21000) | MI | 10.69 | $900.00 | $925.00 | $900.00 |
| 47 | Work zone center line, class III, 642 paint (614E21550) | MI | 18.49 | $900.00 | $925.00 | $900.00 |
| 48 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 58.36 | $450.00 | $600.00 | $450.00 |
| 49 | Work zone stop line, class I (614E26000) | FT | 103 | $5.00 | $4.00 | $5.00 |
| 50 | Work zone stop line, class III, 642 paint (614E26610) | FT | 206 | $4.00 | $4.00 | $4.00 |
| 51 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $1,032.00 | $3,000.00 |
| 52 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 9 | $100.00 | $59.01 | $100.00 |
| 53 | Treating concrete bridge decks with gravity fed resin (512E73500) | SY | 2,355 | $12.00 | $10.86 | $12.00 |
| 54 | Removal of existing pavement marking (512E74500) | FT | 1,325 | $5.00 | $1.31 | $5.00 |
| 55 | Patching concrete bridge deck overlay with micro-silica modified concrete (519E10000) | SY | 13 | $750.00 | $793.20 | $750.00 |
| 56 | Patching concrete structure, as per plan (519E11101) | SF | 45 | $175.00 | $153.63 | $175.00 |
| 57 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $1,032.00 | $3,000.00 |
| 58 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $10,000 | $4,644.00 | $10,000 |
| 59 | Rock channel protection, type C with filter (601E32200) | CY | 5 | $550.00 | $303.54 | $550.00 |
| 60 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $1,548.00 | $3,000.00 |
| 61 | Wearing course removed, as per plan (202E23501) | SY | 406 | $30.00 | $12.00 | $50.00 |
| 62 | Guardrail removed (202E38000) | FT | 110 | $2.60 | $3.00 | $2.60 |
| 63 | Tack coat, 702.13 (407E13900) | GAL | 34 | $15.00 | $2.25 | $3.50 |
| 64 | Non-tracking tack coat (407E20000) | GAL | 25 | $3.10 | $2.25 | $3.05 |
| 65 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 80 | $35.00 | $28.79 | $35.00 |
| 66 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 18 | $515.00 | $225.00 | $250.00 |
| 67 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 34 | $510.00 | $400.00 | $350.00 |
| 68 | Type 3 waterproofing (512E33010) | SY | 406 | $40.00 | $58.35 | $40.00 |
| 69 | High early strength keyway grout (515E30000) | FT | 46 | $100.00 | $58.51 | $100.00 |
| 70 | Railing, misc.: deep beam rail panel replacement (517E76300) | FT | 120 | $33.20 | $21.00 | $33.20 |
| 71 | Special - steel drip strip (518E22300) | FT | 126 | $15.00 | $20.73 | $15.00 |
| 72 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,870.00 | $3,000.00 |
| 73 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $10,000 | $7,740.00 | $10,000 |
| 74 | Rock channel protection, type B with filter (601E32100) | CY | 20 | $350.00 | $235.50 | $350.00 |
| 75 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $3,096.00 | $3,000.00 |
| 76 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $10,000 | $6,192.00 | $10,000 |
| 77 | Rock channel protection, type C with filter (601E32200) | CY | 15 | $350.00 | $235.60 | $350.00 |
| 78 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $2,322.00 | $3,000.00 |
| 79 | Removal misc.: channel cleanout (202E98000) | LS | 1 | $10,000 | $6,192.00 | $10,000 |
| 80 | Dumped rock fill, type B (601E26000) | CY | 5 | $500.00 | $314.34 | $500.00 |
| 81 | Rock channel protection, type C with filter (601E32200) | CY | 5 | $500.00 | $303.54 | $500.00 |
| 82 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $1,548.00 | $3,000.00 |
| 83 | Micro silica modified concrete overlay using hydrodemolition, as per plan (848E10001) | SY | 1,529 | $77.00 | $80.84 | $77.00 |
| 84 | Surface preparation using hydrodemolition, as per plan (848E20001) | SY | 1,529 | $70.00 | $63.85 | $70.00 |
| 85 | Micro silica modified concrete overlay (variable thickness), material only, as per plan (848E30001) | CY | 22 | $350.00 | $472.50 | $350.00 |
| 86 | Hand chipping (848E50000) | SY | 37 | $200.00 | $190.80 | $200.00 |
| 87 | Test slab (848E50100) | LS | 1 | $1,000.00 | $3,093.00 | $1,000.00 |
| 88 | Full depth repair, as per plan (848E50201) | CY | 1 | $1,000.00 | $3,525.00 | $1,000.00 |
| 89 | Clearing and grubbing, as per plan (201E11001) | LS | 1 | $3,000.00 | $1,548.00 | $3,000.00 |
| 90 | Wearing course removed, as per plan (202E23501) | SY | 307 | $40.00 | $15.70 | $50.00 |
| 91 | Guardrail removed (202E38000) | FT | 120 | $2.50 | $3.00 | $2.50 |
| 92 | Tack coat, 702.13 (407E13900) | GAL | 25 | $15.00 | $2.39 | $3.50 |
| 93 | Non-tracking tack coat (407E20000) | GAL | 19 | $3.10 | $2.39 | $3.05 |
| 94 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 64 | $40.00 | $28.79 | $40.00 |
| 95 | Asphalt concrete surface course, type 1, (448), PG70-22M (441E50100) | CY | 14 | $615.00 | $225.00 | $250.00 |
| 96 | Asphalt concrete intermediate course, type 2, (449) (441E70300) | CY | 25 | $610.00 | $400.00 | $350.00 |
| 97 | Sealing of concrete surfaces (epoxy-urethane) (512E10100) | SY | 3 | $100.00 | $148.92 | $100.00 |
| 98 | Type 3 waterproofing (512E33010) | SY | 307 | $40.00 | $58.35 | $40.00 |
| 99 | High early strength keyway grout (515E30000) | FT | 40 | $100.00 | $58.56 | $100.00 |
| 100 | Railing, misc.: deep beam rail panel replacement (517E76300) | FT | 120 | $33.20 | $21.00 | $33.20 |
| 101 | Special - steel drip strip (518E22300) | FT | 139 | $12.00 | $20.73 | $12.00 |
| 102 | Patching concrete structure, as per plan (519E11101) | SF | 25 | $175.00 | $153.63 | $175.00 |
| 103 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $25,000 | $30,000 | $15,000 |
| 104 | Maintaining traffic (614E11000) | LS | 1 | $465,000 | $232,000 | $255,618 |
| 105 | Field office, type B (619E16010) | MNTH | 6 | $3,000.00 | $3,000.00 | $3,000.00 |
| 106 | Construction layout stakes and surveying (623E10000) | LS | 1 | $15,000 | $7,498.00 | $4,463.00 |
| 107 | Mobilization (624E10000) | LS | 1 | $100,000 | $250,000 | $100,000 |
| 200 | Borrow (203E40000) | CY | 5 | $50.00 | $200.00 | $50.00 |
| 201 | Seeding and mulching (659E10000) | SY | 50 | $20.00 | $10.00 | $5.00 |
| 202 | Catch basin, no. 2-2B, as per plan (611E98471) | EACH | 1 | $8,000.00 | $5,000.00 | $2,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of December 4, 2025. Compiled by Mirage Metrics.