ODOT contract 258014 bid tabulation
CUY-/LAK LG FY2025 (LIGHTING). Let by Ohio DOT on May 29, 2025, CUY. 2 bids received; low bid $1,696,000 by Miller Cable Company, +4.8% against the engineer's estimate of $1,619,000.
- Owner
- Ohio DOT
- Letting
- 29 MAY 2025
- Pay items
- 46
- Data through
- 12 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Miller Cable Company | $1,696,000 | Low | +5.0% |
| 2 | Perram Electric Inc | $2,229,560 | +31% | +38% |
Engineer's estimate: $1,619,000.
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Miller Cable Company | 2. Perram Electric Inc |
|---|---|---|---|---|---|
| 1 | Clearing and grubbing (201E11000) | LS | 1 | $600.00 | $36,400 |
| 2 | Removal of existing control center and foundation (202E75704) | EACH | 21 | $300.00 | $1,224.00 |
| 3 | Removal misc.: control center and disconnect (202E98100) | EACH | 22 | $200.00 | $600.00 |
| 4 | Gate, type CLT, as per plan (607E61201) | EACH | 1 | $6,100.00 | $4,800.00 |
| 5 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 6 | Connection, fused pull apart, as per plan (625E00451) | EACH | 449 | $110.00 | $132.15 |
| 7 | Connection, unfused pull apart, as per plan (625E00461) | EACH | 199 | $110.00 | $120.30 |
| 8 | Connection, unfused permanent (625E00480) | EACH | 89 | $110.00 | $171.00 |
| 9 | Light pole, conventional, AT15B41 (625E10490) | EACH | 3 | $3,900.00 | $3,550.00 |
| 10 | Light pole, conventional, AT30B40 (625E10490) | EACH | 3 | $7,900.00 | $8,815.00 |
| 11 | Light pole, low mast, as per plan, ALM45 (625E10495) | EACH | 29 | $4,650.00 | $8,546.00 |
| 12 | Light pole, low mast, as per plan, ALM50 (625E10495) | EACH | 2 | $4,800.00 | $3,685.00 |
| 13 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 6 | $2,600.00 | $2,700.00 |
| 14 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 45,681 | $4.30 | $4.75 |
| 15 | No. 2 AWG 2400 volt distribution cable (625E23300) | FT | 32,907 | $4.45 | $5.45 |
| 16 | No. 6 AWG 2400 volt distribution cable (625E23302) | FT | 14,976 | $3.85 | $3.85 |
| 17 | No. 10 AWG pole and bracket cable (625E23400) | FT | 10,356 | $2.00 | $1.40 |
| 18 | 1-1/2" duct cable with two no. 4 AWG 2400 volt cables (625E24100) | FT | 1,130 | $13.00 | $14.90 |
| 19 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 2,370 | $15.50 | $18.78 |
| 20 | 1-1/2" duct cable with three no. 6 AWG 2400 volt cables (625E24324) | FT | 250 | $12.80 | $16.05 |
| 21 | 1-1/2" duct cable with three no. 2 AWG 2400 volt cables (625E24330) | FT | 250 | $15.80 | $16.60 |
| 22 | Conduit, jacked or drilled, 725.051 3" (625E25900) | FT | 106 | $40.00 | $57.75 |
| 23 | Conduit cleaned and cables removed (625E25910) | FT | 31,188 | $1.00 | $2.01 |
| 24 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 7 | $425.00 | $430.00 |
| 25 | Luminaire, low mast, solid state (LED), as per plan (625E26273) | EACH | 30 | $1,225.00 | $1,090.00 |
| 26 | Luminaire, underpass, solid state (LED), as per plan (625E27503) | EACH | 154 | $600.00 | $584.00 |
| 27 | Trench, 24" deep (625E29002) | FT | 3,170 | $5.00 | $11.10 |
| 28 | Junction box (625E29900) | EACH | 154 | $675.00 | $700.00 |
| 29 | Pull box, 725.08, 18" (625E30700) | EACH | 23 | $1,025.00 | $1,610.00 |
| 30 | Ground rod (625E32000) | EACH | 28 | $300.00 | $325.00 |
| 31 | Power service, as per plan (625E34001) | EACH | 21 | $15,750 | $20,547 |
| 32 | Underground warning marking tape (625E36010) | FT | 3,170 | $3.00 | $1.50 |
| 33 | Special - maintain existing lighting (625E40000) | LS | 1 | $2,600.00 | $9,000.00 |
| 34 | Light pole removed, as per plan (625E75401) | EACH | 33 | $350.00 | $503.00 |
| 35 | Light pole foundation removed (625E75500) | EACH | 7 | $300.00 | $800.00 |
| 36 | Luminaire removed (625E75506) | EACH | 4 | $50.00 | $100.00 |
| 37 | Power service removed, as per plan (625E75511) | EACH | 21 | $650.00 | $800.00 |
| 38 | Lighting, misc.:removal of underpass lighting comp (625E98000) | EACH | 154 | $500.00 | $200.00 |
| 39 | Lighting, misc.:test circuits (625E98200) | LS | 1 | $13,500 | $8,000.00 |
| 40 | Sign support assembly, pole mounted (630E79500) | EACH | 3 | $300.00 | $535.00 |
| 41 | Removal of pole mounted sign and reerection (630E87520) | EACH | 3 | $310.00 | $365.00 |
| 42 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 150 | $75.00 | $100.00 |
| 43 | Signing, misc.: additional signs, ground mounted, (630E97800) | SF | 100 | $19.00 | $28.00 |
| 44 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $14,103 | $36,258 |
| 45 | Maintaining traffic (614E11000) | LS | 1 | $72,000 | $139,700 |
| 46 | Mobilization (624E10000) | LS | 1 | $40,000 | $100,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Official Bid Tabulation PDFs from its public DigitalPaper bid tab cabinet, January 2020 to November 2026 (the source links open after DigitalPaper starts a guest session). ODOT prints unit prices to two decimals but computes line amounts from the full price, so a few bids miss their total and are left out. Descriptions are cut at about 50 characters, as ODOT prints them.
Every contract let that day: ODOT letting of May 29, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.