| 1 | Pavement removed (202E23000) | SY | 244 | $20.00 | $17.50 |
| 2 | Walk removed, as per plan (202E30001) | SF | 464 | $4.00 | $10.00 |
| 3 | Guardrail removed, as per plan (202E38001) | FT | 1,537.50 | $2.00 | $2.80 |
| 4 | Anchor assembly removed, type E, as per plan (202E42011) | EACH | 4 | $160.00 | $149.60 |
| 5 | Removal misc.: bollard (202E98100) | EACH | 4 | $300.00 | $205.00 |
| 6 | Embankment, as per plan (203E20001) | CY | 176 | $73.50 | $40.00 |
| 7 | Linear grading (209E60200) | STA | 23.78 | $50.00 | $100.00 |
| 8 | Railing, misc.: deep beam rail replacement (517E76300) | FT | 50 | $18.00 | $12.50 |
| 9 | Guardrail, type MGS (606E15050) | FT | 1,937.50 | $19.60 | $21.50 |
| 10 | Anchor assembly, MGS type E (606E26150) | EACH | 8 | $2,520.00 | $2,550.00 |
| 11 | Bridge terminal assembly rebuilt, type 4, as per plan (606E35151) | EACH | 4 | $1,325.00 | $1,400.00 |
| 12 | 4" concrete walk (608E10000) | SF | 1,145 | $32.00 | $13.50 |
| 13 | Curb ramp (608E52000) | SF | 362 | $32.00 | $50.00 |
| 14 | Curb, type 6 (609E26000) | FT | 10 | $72.00 | $150.00 |
| 15 | Monument assembly adjusted to grade (623E39500) | EACH | 4 | $1,275.00 | $825.00 |
| 16 | Topsoil (659E00300) | CY | 158 | $70.00 | $100.00 |
| 17 | Seeding and mulching (659E10000) | SY | 1,433 | $2.95 | $5.04 |
| 18 | Commercial fertilizer (659E20000) | TON | 0.31 | $1,014.68 | $839.00 |
| 19 | Lime (659E31000) | ACRE | 0.30 | $116.00 | $157.87 |
| 20 | Water (659E35000) | MGAL | 10 | $1.00 | $1.00 |
| 21 | Erosion control (832E30000) | EACH | 1,000 | $1.00 | $1.00 |
| 22 | Manhole adjusted to grade (611E99654) | EACH | 6 | $650.00 | $1,000.00 |
| 23 | Partial depth pavement repair (441) (251E01000) | SY | 13 | $275.00 | $350.00 |
| 24 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 300 | $28.00 | $40.00 |
| 25 | Partial depth pavement repair (asphalt concrete base), as per plan (251E01041) | SY | 10,915 | $29.00 | $39.00 |
| 26 | Pavement planing, asphalt concrete, 1.5" (254E01000) | SY | 206,470 | $1.00 | $1.25 |
| 27 | Non-tracking tack coat (407E20000) | GAL | 17,552 | $2.75 | $3.50 |
| 28 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 8,401 | $205.00 | $200.00 |
| 29 | Asphalt concrete surface course, 12.5 MM, type A (449) (442E22100) | CY | 200 | $345.00 | $450.00 |
| 30 | 6" non-reinforced concrete pavement, class QC 1P (452E10010) | SY | 79 | $77.00 | $155.00 |
| 31 | Compacted aggregate (617E10100) | CY | 1,505 | $40.00 | $75.00 |
| 32 | Shoulder preparation (617E20000) | SY | 26,447 | $0.50 | $0.50 |
| 33 | Water (617E25000) | MGAL | 10 | $1.00 | $1.00 |
| 34 | Rumble stripes, center line (asphalt concrete) (618E43000) | MI | 2.99 | $2,300.00 | $2,250.00 |
| 35 | Longitudinal joint preparation (874E21000) | MI | 2.99 | $1,600.00 | $1,500.00 |
| 36 | Valve box adjusted to grade (638E10800) | EACH | 6 | $550.00 | $750.00 |
| 37 | RPM (621E00100) | EACH | 889 | $33.95 | $33.95 |
| 38 | Raised pavement marker removed (621E54000) | EACH | 889 | $1.00 | $5.00 |
| 39 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 50 | $13.00 | $12.50 |
| 40 | Ground mounted support, no. 2 post (630E02100) | FT | 15 | $15.00 | $12.00 |
| 41 | Ground mounted support, no. 3 post (630E03100) | FT | 30 | $17.50 | $25.00 |
| 42 | Sign post reflector (630E08600) | EACH | 3 | $45.00 | $50.00 |
| 43 | Sign, flat sheet (630E80100) | SF | 20 | $27.50 | $25.00 |
| 44 | Removal of ground mounted sign and disposal (630E84900) | EACH | 4 | $25.00 | $25.00 |
| 45 | Removal of ground mounted major sign and reerection (630E85600) | EACH | 1 | $150.00 | $150.00 |
| 46 | Signing, misc.: solar powered rectangular rapid FL (630E97700) | EACH | 4 | $9,250.00 | $9,250.00 |
| 47 | Edge line, 6", type 1 (642E00104) | MI | 23.70 | $650.00 | $650.00 |
| 48 | Center line, type 1 (642E00300) | MI | 12.70 | $680.00 | $680.00 |
| 49 | Channelizing line, 8" (644E00400) | FT | 460 | $2.65 | $2.65 |
| 50 | Stop line (644E00500) | FT | 558 | $9.25 | $9.25 |
| 51 | Crosswalk line, 12" (644E00620) | FT | 1,310 | $3.80 | $3.80 |
| 52 | Crosswalk line, 24" (644E00630) | FT | 100 | $9.50 | $9.50 |
| 53 | Railroad symbol marking (644E01000) | EACH | 2 | $860.00 | $860.00 |
| 54 | School symbol marking, 72" (644E01100) | EACH | 2 | $860.00 | $860.00 |
| 55 | Parking lot stall marking (644E01200) | FT | 1,700 | $2.25 | $2.25 |
| 56 | Lane arrow (644E01300) | EACH | 4 | $100.00 | $100.00 |
| 57 | Yield line (644E20800) | FT | 28 | $14.50 | $14.50 |
| 58 | Law enforcement officer with patrol car for assistance (614E11110) | HR | 16 | $105.00 | $85.00 |
| 59 | Work zone marking sign, as per plan (614E12461) | EACH | 66 | $75.00 | $85.00 |
| 60 | Work zone center line, class III, 642 paint (614E21550) | MI | 25.40 | $675.00 | $675.00 |
| 61 | Work zone edge line, class III, 6", 642 paint (614E22360) | MI | 23.70 | $550.00 | $550.00 |
| 62 | Work zone stop line, class III, 642 paint (614E26610) | FT | 558 | $2.70 | $2.70 |
| 63 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 180 | $25.86 | $28.00 |
| 64 | Sawing and sealing asphalt concrete pavement joints (409E30000) | FT | 136 | $25.86 | $28.00 |
| 65 | Premium on railroads' protective public liability and property damage liability insurance (100E00300) | LS | 1 | $4,000.00 | $3,000.00 |
| 66 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $12,500 | $9,039.03 |
| 67 | Maintaining traffic (614E11000) | LS | 1 | $170,867 | $121,000 |
| 68 | Construction layout stakes and surveying, as per plan (623E10001) | LS | 1 | $1,500.00 | $5,500.00 |
| 69 | Mobilization (624E10000) | LS | 1 | $155,000 | $115,400 |