| 1 | Clearing and grubbing (201E11000) | LS | 1 | $52,000 |
| 2 | Pavement removed (202E23000) | SY | 12,325 | $24.00 |
| 3 | Concrete barrier removed (202E30700) | FT | 61 | $50.00 |
| 4 | Pipe removed, 24" and under (202E35100) | FT | 1,432 | $32.00 |
| 5 | Guardrail removed (202E38000) | FT | 1,124 | $2.80 |
| 6 | Anchor assembly removed, type E (202E42010) | EACH | 4 | $185.00 |
| 7 | Anchor assembly removed, type T (202E42040) | EACH | 2 | $125.00 |
| 8 | Bridge terminal assembly removed (202E47000) | EACH | 1 | $150.00 |
| 9 | Manhole removed, as per plan (202E58001) | EACH | 1 | $850.00 |
| 10 | Catch basin removed, as per plan (202E58101) | EACH | 5 | $500.00 |
| 11 | Inlet removed, as per plan (202E58201) | EACH | 5 | $500.00 |
| 12 | Junction box removed (202E62000) | EACH | 14 | $300.00 |
| 13 | Gate removed (202E75250) | EACH | 1 | $500.00 |
| 14 | Removal misc.:portable concrete barrier (202E98200) | FT | 152 | $15.00 |
| 15 | Excavation (203E10000) | CY | 7,076 | $35.00 |
| 16 | Embankment (203E20000) | CY | 1,629 | $35.00 |
| 17 | Subgrade compaction (204E10000) | SY | 17,097 | $4.00 |
| 18 | Excavation of subgrade (204E13000) | CY | 508 | $45.00 |
| 19 | Excavation of subgrade (204E13000) | CY | 100 | $50.00 |
| 20 | Granular material, type B (204E30010) | CY | 608 | $115.00 |
| 21 | Proof rolling (204E45000) | HR | 8 | $310.00 |
| 22 | Geotextile fabric (204E50000) | SY | 1,524 | $4.00 |
| 23 | Guardrail, type MGS (606E15050) | FT | 1,263 | $22.00 |
| 24 | Guardrail, type MGS with long posts (606E15100) | FT | 313 | $23.00 |
| 25 | Anchor assembly, MGS type E, as per plan (606E26151) | EACH | 4 | $2,650.00 |
| 26 | Anchor assembly, MGS type T (606E26550) | EACH | 2 | $1,350.00 |
| 27 | MGS bridge terminal assembly, type 1 (606E35002) | EACH | 1 | $2,650.00 |
| 28 | Fence, misc.:dumpster screen wall (607E98000) | FT | 38 | $150.00 |
| 29 | Preconstruction survey monument verification and report (623E50000) | LS | 1 | $5,000.00 |
| 30 | Post construction survey monument verification and report (623E51000) | LS | 1 | $5,000.00 |
| 31 | Special - bollard (690E50600) | EACH | 5 | $600.00 |
| 32 | Tied concrete block mat with type 2 underlayment (601E21060) | SY | 194 | $65.00 |
| 33 | Articulating concrete block revetment system, type 1 (601E23000) | SY | 120 | $400.00 |
| 34 | Soil analysis test (659E00100) | EACH | 2 | $135.00 |
| 35 | Topsoil (659E00300) | CY | 1,473 | $30.00 |
| 36 | Seeding and mulching, class 1 (659E00500) | SY | 13,273 | $0.85 |
| 37 | Commercial fertilizer (659E20000) | TON | 1.85 | $940.00 |
| 38 | Lime (659E31000) | ACRE | 2.74 | $160.00 |
| 39 | Water (659E35000) | MGAL | 73 | $1.00 |
| 40 | Ditch erosion protection mat, type B (670E00720) | SY | 528 | $1.40 |
| 41 | Storm water pollution prevention plan (832E15000) | LS | 1 | $5,500.00 |
| 42 | Storm water pollution prevention inspections (832E15002) | LS | 1 | $13,500 |
| 43 | Storm water pollution prevention inspection software (832E15010) | LS | 1 | $12,600 |
| 44 | Erosion control (832E30000) | EACH | 43,700 | $1.00 |
| 45 | Seeding and erosion control with turf reinforcing mat, type 1 (836E10000) | SY | 221 | $5.15 |
| 46 | Concrete masonry (602E20000) | CY | 1 | $3,000.00 |
| 47 | 6" base pipe underdrains with geotextile fabric (605E14020) | FT | 11,517 | $27.00 |
| 48 | 6" conduit, type F for underdrain outlets (611E00510) | FT | 162 | $45.00 |
| 49 | 6" conduit, type F (611E01500) | FT | 10 | $38.00 |
| 50 | 15" conduit, type B (611E05900) | FT | 1,762 | $140.00 |
| 51 | 15" conduit, type B (611E05900) | FT | 4 | $370.00 |
| 52 | 18" conduit, type B (611E07400) | FT | 468 | $175.00 |
| 53 | 18" conduit, type B (611E07400) | FT | 4 | $390.00 |
| 54 | 18" conduit, type C (611E07600) | FT | 97 | $130.00 |
| 55 | 18" conduit, type F (611E08200) | FT | 127 | $170.00 |
| 56 | 24" conduit, type B (611E10400) | FT | 461 | $245.00 |
| 57 | 24" conduit, type F (611E11200) | FT | 95 | $185.00 |
| 58 | Catch basin, no. 3 (611E98150) | EACH | 2 | $5,300.00 |
| 59 | Catch basin, no. 3A (611E98180) | EACH | 13 | $4,500.00 |
| 60 | Catch basin, no. 8 (611E98410) | EACH | 3 | $6,600.00 |
| 61 | Manhole, no. 3 (611E99574) | EACH | 5 | $4,900.00 |
| 62 | Manhole, no. 3 with 90" base I.D. and 8" weir (611E99582) | EACH | 2 | $20,000 |
| 63 | Precast reinforced concrete outlet (611E99710) | EACH | 1 | $430.00 |
| 64 | Manufactured water quality structure, type 2 (895E10020) | EACH | 2 | $28,000 |
| 65 | Asphalt concrete base, PG64-22, (449) (301E56000) | CY | 1,181 | $250.00 |
| 66 | Aggregate base (304E20000) | CY | 3,648 | $157.00 |
| 67 | 10" concrete base, class QC 1P with QC/QA (305E14020) | SY | 8,951 | $130.00 |
| 68 | Tack coat, 702.13 (407E13900) | GAL | 970 | $4.00 |
| 69 | Non-tracking tack coat (407E20000) | GAL | 1,570 | $4.50 |
| 70 | Asphalt concrete surface course, 12.5 MM, type A (446) (442E10000) | CY | 665 | $285.00 |
| 71 | Asphalt concrete intermediate course, 12.5 MM, type A (446) (442E10080) | CY | 931 | $260.00 |
| 72 | 6" non-reinforced concrete pavement, class QC 1P with QC/QA (452E10020) | SY | 54 | $140.00 |
| 73 | Curb, type 4-B (609E24500) | FT | 19 | $75.00 |
| 74 | Curb, type 7 (609E28000) | FT | 2,276 | $40.00 |
| 75 | Void reducing asphalt membrane (vram) (872E10000) | FT | 1,864 | $12.50 |
| 76 | Connection, fused pull apart (625E00450) | EACH | 34 | $150.00 |
| 77 | Connection, unfused permanent (625E00480) | EACH | 9 | $150.00 |
| 78 | Light pole, conventional, AT12B40 (625E10490) | EACH | 1 | $3,700.00 |
| 79 | Light pole, conventional, AT15B40 (625E10490) | EACH | 10 | $3,800.00 |
| 80 | Light pole, conventional, AT18B40 (625E10490) | EACH | 6 | $5,000.00 |
| 81 | Light tower, misc.: light tower, BB45 (625E13500) | EACH | 4 | $20,000 |
| 82 | Light pole foundation, 24" X 8' deep (625E14100) | EACH | 17 | $2,000.00 |
| 83 | Light tower foundation, misc.: 36" X 6' deep (625E15700) | EACH | 2 | $7,000.00 |
| 84 | Light tower foundation, misc.: 36" X 8' deep (625E15700) | EACH | 2 | $6,500.00 |
| 85 | No. 4 AWG 2400 volt distribution cable (625E23200) | FT | 276 | $4.00 |
| 86 | No. 10 AWG pole and bracket cable (625E23400) | FT | 2,850 | $2.00 |
| 87 | 1-1/2" duct cable with three no. 4 AWG 2400 volt cables (625E24320) | FT | 4,971 | $13.00 |
| 88 | Conduit, 3", 725.04 (625E25500) | FT | 72 | $40.00 |
| 89 | Luminaire, conventional, solid state (LED), as per plan (625E26253) | EACH | 17 | $550.00 |
| 90 | Luminaire, high mast, solid state (LED), as per plan (625E26263) | EACH | 8 | $1,300.00 |
| 91 | Trench, 24" deep (625E29002) | FT | 4,823 | $7.00 |
| 92 | Pull box, 725.08, 18" (625E30700) | EACH | 2 | $1,400.00 |
| 93 | Ground rod (625E32000) | EACH | 25 | $250.00 |
| 94 | Power service, as per plan (625E34001) | EACH | 1 | $15,000 |
| 95 | Underground warning marking tape (625E36010) | FT | 4,823 | $2.00 |
| 96 | Arc flash calculations and label (CC-'CM') (625E76000) | EACH | 1 | $1,000.00 |
| 97 | RPM (621E00100) | EACH | 95 | $60.00 |
| 98 | Barrier reflector, type 2, bidirectional (626E00110) | EACH | 3 | $15.00 |
| 99 | Barrier reflector, type 2, one-way (626E00110) | EACH | 21 | $15.00 |
| 100 | Ground mounted support, no. 2 post (630E02100) | FT | 60 | $15.00 |
| 101 | Ground mounted support, no. 3 post (630E03100) | FT | 193.10 | $15.00 |
| 102 | Ground mounted structural beam support, W6X9 (630E06500) | FT | 41.50 | $23.00 |
| 103 | Ground mounted structural beam support, W8X18 (630E07000) | FT | 46.30 | $40.00 |
| 104 | Ground mounted structural beam support, W10X22 (630E07500) | FT | 163.20 | $48.00 |
| 105 | Ground mounted structural beam support, W12X30 (630E08000) | FT | 63.30 | $65.00 |
| 106 | Sign post reflector (630E08600) | EACH | 10 | $48.00 |
| 107 | Breakaway structural beam connection (630E09000) | EACH | 12 | $850.00 |
| 108 | Sign, flat sheet (630E80100) | SF | 106.20 | $25.00 |
| 109 | Sign, ground mounted extrusheet (630E80200) | SF | 614 | $30.00 |
| 110 | Ground mounted structural beam support foundation (630E84500) | EACH | 12 | $1,575.00 |
| 111 | Removal of ground mounted sign and disposal (630E84900) | EACH | 6 | $25.00 |
| 112 | Removal of ground mounted major sign and disposal (630E85400) | EACH | 3 | $200.00 |
| 113 | Removal of ground mounted major sign and reerection (630E85600) | EACH | 1 | $350.00 |
| 114 | Removal of ground mounted post support and disposal (630E86002) | EACH | 6 | $25.00 |
| 115 | Removal of ground mounted structural beam support (630E86102) | EACH | 6 | $550.00 |
| 116 | Parking lot stall marking (646E20200) | FT | 4,530 | $2.50 |
| 117 | Wrong way arrow (646E20320) | EACH | 2 | $280.00 |
| 118 | Wet reflective epoxy pavement marking, edge line, 6" (807E12010) | MI | 1.04 | $8,420.00 |
| 119 | Wet reflective epoxy pavement marking, channelizing line, 12" (807E12310) | FT | 1,550 | $2.10 |
| 120 | Wet reflective epoxy pavement marking, dotted line, 6" (807E12410) | FT | 1,944 | $2.50 |
| 121 | Grooving for 6" recessed pavement marking, (asphalt) (850E10010) | MI | 1.04 | $2,430.00 |
| 122 | Grooving for 6" recessed pavement marking, (asphalt) (850E10110) | FT | 1,944 | $1.75 |
| 123 | Grooving for 12" recessed pavement marking, (asphalt) (850E10130) | FT | 1,550 | $1.50 |
| 124 | Work zone increased penalties sign (614E12484) | EACH | 2 | $125.00 |
| 125 | Water (616E10000) | MGAL | 26 | $100.00 |
| 126 | Digital speed limit (DSL) sign assembly (808E18700) | SNMT | 8 | $500.00 |
| 127 | Premium for contract performance bond and for payment bond (103E05000) | LS | 1 | $32,721 |
| 128 | Maintaining traffic (614E11000) | LS | 1 | $49,200 |
| 129 | Field office, type B (619E16010) | MNTH | 8 | $4,600.00 |
| 130 | Construction layout stakes and surveying (623E10000) | LS | 1 | $65,000 |
| 131 | Mobilization (624E10000) | LS | 1 | $285,000 |