ODOT contract 15592 bid tabulation
Or34: roadside barrier upgrades. Let by Oregon DOT on March 27, 2025, Region 2. 4 bids received.
- Owner
- Oregon DOT
- Letting
- 27 MAR 2025
- Pay items
- 90
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 |
|---|---|---|---|---|---|---|---|
| 1 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 39 | $40.00 | $25.00 | $42.00 | $50.00 |
| 2 | Flagger station lighting (0223-0168100E) | EACH | 3 | $502.00 | $900.00 | $4,000.00 | $20,000 |
| 3 | Inlet protection, type 3 (0280-0114030E) | EACH | 4 | $287.00 | $250.00 | $410.00 | $100.00 |
| 4 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $1,000.00 | $6,500.00 | $5,000.00 | $10,000 |
| 5 | Reinforcement, grade 60 (0530-0104000A) | LB | 601 | $4.78 | $9.98 | $16.64 | $8.32 |
| 6 | General structural concrete, class 3300 (0540-0301000A) | CY | 2 | $7,231.00 | $7,500.00 | $12,000 | $15,000 |
| 7 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 105 | $9.84 | $11.43 | $8.57 | $19.05 |
| 8 | Check dam, type 4 (0280-0106040E) | EACH | 3 | $517.00 | $400.00 | $390.00 | $250.00 |
| 9 | Asphalt pavement sawcutting (0310-0119000F) | LF | 5,367 | $3.25 | $8.00 | $5.00 | $3.75 |
| 10 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 56 | $172.00 | $305.00 | $150.00 | $315.00 |
| 11 | Adjusting guardrail (0812-0101000F) | LF | 537.50 | $9.18 | $12.00 | $10.00 | $12.00 |
| 12 | Temporary plastic drums (0224-0145000E) | EACH | 12 | $29.00 | $60.00 | $75.00 | $80.00 |
| 13 | Sediment barrier, type 3 (0280-0115030F) | LF | 780 | $5.75 | $6.25 | $28.00 | $7.50 |
| 14 | General structural concrete, class 3300 (0540-0301000A) | CY | 2 | $7,231.50 | $7,500.00 | $12,000 | $15,000 |
| 15 | General structural concrete, class 3300 (0540-0301000A) | CY | 3 | $1,913.33 | $6,666.67 | $3,000.00 | $8,333.33 |
| 16 | Extra for new curb ramps (0759-0154100E) | EACH | 8 | $1,263.00 | $1,000.00 | $2,650.00 | $1,000.00 |
| 17 | Contaminated soil disposal (0294-0200010M) | TON | 2,271 | $104.25 | $88.00 | $100.00 | $77.00 |
| 18 | Aggregate base (0640-0100000M) | TON | 1,235 | $86.00 | $80.00 | $130.00 | $46.00 |
| 19 | Bridge identification markers (0842-0401000E) | EACH | 2 | $212.00 | $225.00 | $175.00 | $500.00 |
| 20 | Milepost marker posts (0840-0106000E) | EACH | 7 | $132.00 | $300.00 | $125.00 | $1,500.00 |
| 21 | Guardrail terminals, downstream anchor terminal (0810-0132200E) | EACH | 3 | $2,210.00 | $1,500.00 | $2,500.00 | $1,550.00 |
| 22 | Wood sign posts (0910-0100000K) | FBM | 285 | $27.55 | $16.00 | $30.00 | $16.00 |
| 23 | Sign support footings (0920-0100000A) | CY | 0.98 | $5,270.41 | $7,142.86 | $5,306.12 | $5,102.04 |
| 24 | General excavation (0330-0105000K) | CY | 714 | $101.00 | $40.00 | $135.00 | $80.00 |
| 25 | Bridge identification markers (0842-0401000E) | EACH | 2 | $212.00 | $225.00 | $175.00 | $500.00 |
| 26 | Concrete repair (0542-0102000J) | SY | 1 | $4,017.00 | $1.00 | $6,000.00 | $5,000.00 |
| 27 | Bridge removal work (0501-0100000A) | SF | 80 | $117.00 | $250.00 | $175.00 | $312.50 |
| 28 | Monolithic curb and sidewalks (0759-0134000J) | SF | 585.80 | $24.00 | $52.00 | $35.00 | $40.00 |
| 29 | Remove existing signs (0905-0100000A) | LS | 1 | $631.00 | $2,000.00 | $650.00 | $5,000.00 |
| 30 | Reinforcement, grade 60 (0530-0104000A) | LB | 290 | $5.93 | $8.62 | $8.28 | $17.24 |
| 31 | Sediment barrier, type 4 (0280-0115040E) | EACH | 6 | $401.75 | $250.00 | $495.00 | $50.00 |
| 32 | Health and safety plan (0294-0100000A) | LS | 1 | $2,870.00 | $2,500.00 | $3,000.00 | $50,000 |
| 33 | Reinforcement, grade 60 (0530-0104000A) | LB | 601 | $4.78 | $9.98 | $16.64 | $8.32 |
| 34 | Structure excavation (0510-0101000A) | CY | 2 | $2,178.50 | $500.00 | $1,200.00 | $5,000.00 |
| 35 | Midwest guardrail system, type 4 (0810-0146100F) | LF | 25 | $80.35 | $71.00 | $80.00 | $75.00 |
| 36 | Single mailbox supports (1070-0100000E) | EACH | 1 | $735.00 | $450.00 | $750.00 | $1,500.00 |
| 37 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 4 | $172.00 | $1.00 | $1.00 | $1.00 |
| 38 | Removal of surfacings (0310-0103000J) | SY | 44 | $124.00 | $40.00 | $300.00 | $50.00 |
| 39 | Extra for asphalt approaches (0749-0100000E) | EACH | 21 | $459.00 | $250.00 | $500.00 | $2,500.00 |
| 40 | Automated flagger assistance device (0223-0200000E) | EACH | 3 | $4,500.00 | $5,000.00 | $20,000 | $20,000 |
| 41 | Portable changeable message signs (0222-0164000E) | EACH | 2 | $3,847.00 | $7,500.00 | $15,000 | $20,000 |
| 42 | Temporary signs (0222-0102000J) | SF | 1,020 | $36.00 | $26.00 | $30.00 | $35.00 |
| 43 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $3,558.00 | $1,300.00 | $3,750.00 | $10,000 |
| 44 | Midwest guardrail system, type 3 (0810-0146100F) | LF | 250 | $80.35 | $77.00 | $90.00 | $80.00 |
| 45 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $15,617 | $10,000 | $2,500.00 | $30,000 |
| 46 | Perforated steel square tube anchor sign supports (0930-0117000A) | LB | 130 | $7.06 | $11.54 | $10.38 | $11.54 |
| 47 | Stone embankment (0330-0126000K) | CY | 659 | $108.00 | $75.00 | $175.00 | $180.00 |
| 48 | Inlet protection, type 2 (0280-0114020E) | EACH | 2 | $1,836.50 | $250.00 | $590.00 | $200.00 |
| 49 | Guardrail terminals, buried in backslope (0810-0132100E) | EACH | 1 | $7,001.00 | $11,000 | $8,500.00 | $15,000 |
| 50 | Pedestrian rail (0587-0127000A) | LF | 580 | $182.59 | $215.52 | $206.90 | $603.45 |
| 51 | Bridge identification markers (0842-0401000E) | EACH | 2 | $212.00 | $225.00 | $175.00 | $500.00 |
| 52 | Structure excavation (0510-0101000A) | CY | 1 | $2,000.00 | $1,000.00 | $3,750.00 | $10,000 |
| 53 | Subgrade geotextile (0350-0105000J) | SY | 2,257 | $2.00 | $4.00 | $10.00 | $5.00 |
| 54 | Structure excavation (0510-0101000A) | CY | 65 | $91.23 | $84.62 | $92.31 | $3,846.15 |
| 55 | Retaining wall, prefabricated modular gravity (0596-B002000A) | SF | 1,079 | $86.19 | $245.60 | $139.02 | $185.36 |
| 56 | Bridge identification markers (0842-0401000E) | EACH | 2 | $212.00 | $225.00 | $175.00 | $500.00 |
| 57 | Extra for 11 foot posts (0810-0134000E) | EACH | 202 | $120.50 | $93.00 | $125.00 | $95.00 |
| 58 | Guardrail transition (0810-0126000E) | EACH | 21 | $5,435.00 | $4,300.00 | $5,975.00 | $4,500.00 |
| 59 | Precompressed foam silicone joint seal (0585-0215000A) | LF | 25 | $180.20 | $300.00 | $240.00 | $400.00 |
| 60 | Guardrail end pieces, type B (0810-0122000E) | EACH | 14 | $143.50 | $92.00 | $150.00 | $100.00 |
| 61 | Mailbox concrete collars (1070-0102000E) | EACH | 1 | $258.25 | $100.00 | $275.00 | $750.00 |
| 62 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 22 | $3,816.00 | $3,400.00 | $4,500.00 | $7,700.00 |
| 63 | Triangular base breakaway sign supports (0930-0112000A) | LB | 142 | $24.25 | $35.21 | $24.30 | $35.21 |
| 64 | Multiple mailbox supports (1070-0101000E) | EACH | 3 | $1,779.00 | $1,200.00 | $1,800.00 | $2,000.00 |
| 65 | Delineators, type 7 (0840-0103000E) | EACH | 138 | $746.00 | $45.00 | $650.00 | $50.00 |
| 66 | Reinforcement, grade 60 (0530-0104000A) | LB | 11,000 | $3.13 | $3.64 | $6.05 | $5.45 |
| 67 | Pollution control plan (0290-0100000A) | LS | 1 | $140.00 | $500.00 | $1,500.00 | $10,000 |
| 68 | Removal of guardrail (0310-0113000A) | LF | 3,874 | $8.04 | $22.72 | $10.00 | $25.81 |
| 69 | Clearing and grubbing (0320-0100000A) | ACRE | 1.27 | $20,088 | $15,748 | $7,874.02 | $39,370 |
| 70 | Granular structure backfill (0510-0108000A) | CY | 14 | $317.00 | $535.71 | $267.86 | $14,286 |
| 71 | Level 3, 1/2 inch ACP mixture (0744-0302000M) | TON | 362 | $193.00 | $215.00 | $210.00 | $205.00 |
| 72 | Concrete repair (0542-0102000J) | SY | 1 | $4,017.00 | $1.00 | $6,000.00 | $5,000.00 |
| 73 | Extra for 8 foot posts (0810-0133000E) | EACH | 379 | $46.00 | $50.00 | $55.00 | $50.00 |
| 74 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 11 | $1,004.00 | $900.00 | $1,250.00 | $900.00 |
| 75 | Temporary barricades, type III (0224-0105000E) | EACH | 2 | $86.00 | $75.00 | $250.00 | $250.00 |
| 76 | Check dam, type 3 (0280-0106030E) | EACH | 4 | $373.00 | $400.00 | $365.00 | $200.00 |
| 77 | Flaggers (0223-0168000T) | HR | 3,000 | $80.00 | $72.00 | $80.20 | $80.00 |
| 78 | HI-build paint, sprayed, surface (0866-0117000F) | LF | 3,340 | $0.98 | $0.88 | $1.00 | $2.00 |
| 79 | Temporary pavement bars (0225-0153200J) | SF | 288 | $8.00 | $5.60 | $30.00 | $7.00 |
| 80 | General structural concrete, class 3300 (0540-0301000A) | CY | 128 | $1,183.67 | $1,757.81 | $2,214.84 | $2,343.75 |
| 81 | Pilot cars (0223-0172000T) | HR | 2,000 | $85.00 | $72.00 | $90.00 | $85.00 |
| 82 | Temporary transverse rumble strips (0225-0153800F) | LF | 130 | $125.00 | $80.00 | $230.00 | $210.00 |
| 83 | Granular structure backfill (0510-0108000A) | CY | 2 | $535.50 | $250.00 | $600.00 | $5,000.00 |
| 84 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 9 | $63.00 | $50.00 | $65.00 | $150.00 |
| 85 | Structure excavation (0510-0101000A) | CY | 1 | $2,000.00 | $1,000.00 | $3,750.00 | $10,000 |
| 86 | Bridge removal work (0501-0100000A) | SF | 11 | $304.55 | $227.27 | $218.18 | $1,363.64 |
| 87 | Bridge identification markers (0842-0401000E) | EACH | 2 | $212.00 | $225.00 | $175.00 | $500.00 |
| 88 | Guardrail anchors, type 1 modified (0810-0120000E) | EACH | 28 | $1,246.00 | $1,000.00 | $1,500.00 | $1,000.00 |
| 89 | Bridge identification markers (0842-0401000E) | EACH | 2 | $212.00 | $225.00 | $175.00 | $500.00 |
| 90 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 4,119 | $32.20 | $30.00 | $40.00 | $30.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of March 27, 2025. Compiled by Mirage Metrics.