ODOT contract 15650 bid tabulation
Us97: earl st - colfax ln (madras). Let by Oregon DOT on April 2, 2026, Region 4. 6 bids received.
- Owner
- Oregon DOT
- Letting
- 02 APR 2026
- Pay items
- 255
- Data through
- 13 AUG 2026
Bidders
| Rank | Total bid | Against the low bid |
|---|---|---|
| 1 | Low | |
| 2 | ||
| 3 | ||
| 4 | ||
| 5 | ||
| 6 |
Bid tabulation
| Line | Pay item | Unit | Quantity | Rank 1 | Rank 2 | Rank 3 | Rank 4 | Rank 5 | Rank 6 |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Sloped end sections, 48 inch (0445-0700480E) | EACH | 1 | $1,300.00 | $950.00 | $2,195.00 | $2,720.00 | $3,100.00 | $3,839.46 |
| 2 | 18 inch storm sewer pipe, 10 FT depth (0445-035018BF) | LF | 1,241 | $144.50 | $135.00 | $265.00 | $270.00 | $295.00 | $147.10 |
| 3 | Bridge deck cold plane pavement removal, 2-4 inches deep (0503-0102000J) | SY | 266 | $29.00 | $50.00 | $50.53 | $22.00 | $45.00 | $16.20 |
| 4 | Bonded membrane removal (0504-0102000J) | SY | 266 | $25.00 | $10.00 | $12.70 | $11.00 | $9.40 | $12.01 |
| 5 | 3 foot X 72 inch chain link single gates (1050-0191000E) | EACH | 1 | $540.00 | $3,100.00 | $4,379.36 | $820.00 | $1,650.00 | $1,006.89 |
| 6 | Stripe removal (0225-0154000F) | LF | 1,700 | $0.85 | $0.90 | $0.94 | $1.05 | $0.85 | $1.04 |
| 7 | Mainline video inspection (0415-0100000F) | LF | 13,187 | $4.75 | $7.00 | $2.14 | $4.50 | $5.00 | $5.53 |
| 8 | 42 inch storm sewer pipe, 20 FT depth (0445-035042CF) | LF | 1,413 | $535.00 | $395.00 | $822.00 | $830.00 | $625.00 | $454.64 |
| 9 | Concrete manholes, large precast (0470-0106000E) | EACH | 32 | $9,900.00 | $13,800 | $12,192 | $12,302 | $9,600.00 | $12,928 |
| 10 | 4 inch potable water pipe, fittings & couplings with restrained joints and class B backfill (1140-0145000F) | LF | 40 | $180.00 | $205.00 | $69.00 | $70.00 | $140.00 | $89.83 |
| 11 | Concrete inlets, type CG-2 (0470-0307000E) | EACH | 66 | $3,165.00 | $3,200.00 | $3,305.89 | $2,333.00 | $3,900.00 | $5,540.76 |
| 12 | Subgrade geotextile (0350-0105000J) | SY | 6,500 | $1.50 | $1.00 | $1.73 | $2.25 | $2.45 | $5.95 |
| 13 | Contaminated soil disposal (0294-0200010M) | TON | 60.75 | $180.00 | $78.00 | $68.92 | $155.00 | $140.00 | $0.02 |
| 14 | Traffic signal modification, US97/26 SB (4TH ST) @ W B ST (0990-0102000A) | EACH | 1 | $142,423 | $150,000 | $174,512 | $175,000 | $190,000 | $182,327 |
| 15 | Removal of inlets (0310-0104000E) | EACH | 39 | $305.00 | $700.00 | $309.00 | $385.00 | $900.00 | $870.77 |
| 16 | Removal of manholes (0310-0105000E) | EACH | 12 | $1,140.00 | $1,690.00 | $1,960.00 | $2,500.00 | $1,850.00 | $1,450.33 |
| 17 | Cold plane pavement removal, 2 inches deep (0620-0120000J) | SY | 109,800 | $1.69 | $3.80 | $3.79 | $2.30 | $3.50 | $3.92 |
| 18 | 18 inch storm sewer pipe, 5 FT depth (0445-035018AF) | LF | 65 | $193.98 | $160.00 | $275.00 | $280.00 | $330.00 | $153.52 |
| 19 | Plastic sheeting (0280-0101000J) | SY | 200 | $2.50 | $0.40 | $2.49 | $3.50 | $4.00 | $32.66 |
| 20 | Guardrail height conversion, type 2A (0810-0147000E) | EACH | 1 | $1,375.00 | $1,500.00 | $1,214.95 | $1,375.00 | $1,375.00 | $2,209.63 |
| 21 | Temporary curb ramp, parallel to curb (0228-0167670E) | EACH | 100 | $350.00 | $2,900.00 | $1,104.50 | $1,250.00 | $100.00 | $638.64 |
| 22 | Ductile iron pipe bend, 6 inch (1140-0650000E) | EACH | 20 | $1,000.00 | $725.00 | $550.00 | $555.00 | $1,650.00 | $782.92 |
| 23 | Metal handrail, 2 rails (1069-0100000F) | LF | 159 | $174.20 | $195.00 | $261.77 | $214.00 | $151.00 | $265.64 |
| 24 | Bioretention pond (1011-0200000A) | LS | 1 | $399,884 | $425,000 | $660,500 | $950,000 | $900,000 | $284,323 |
| 25 | Polymer membrane (0590-0100000J) | SF | 1,850 | $5.33 | $6.25 | $8.06 | $7.00 | $6.73 | $7.37 |
| 26 | Milepost marker posts (0840-0106000E) | EACH | 1 | $250.00 | $275.00 | $303.74 | $250.00 | $275.00 | $337.67 |
| 27 | Pavement legend, type B-HS: bicycle lane stencil (0867-0131000E) | EACH | 87 | $400.00 | $425.00 | $441.80 | $400.00 | $400.00 | $491.16 |
| 28 | Pavement legend, type B-HS: "bus" (0867-0157100E) | EACH | 2 | $650.00 | $715.00 | $717.93 | $650.00 | $650.00 | $798.14 |
| 29 | 42 inch storm sewer pipe, 10 FT depth (0445-035042BF) | LF | 1,411 | $480.00 | $415.00 | $493.00 | $500.00 | $585.00 | $372.32 |
| 30 | Sign support footings (0920-0100000A) | CY | 15 | $7,580.00 | $8,333.33 | $5,448.89 | $9,300.00 | $3,666.67 | $6,057.70 |
| 31 | Cold plane pavement removal, 5 inches deep (0620-0124000J) | SY | 2,200 | $1.69 | $6.50 | $9.85 | $3.30 | $6.00 | $4.33 |
| 32 | Hazard markers (0840-0100000E) | EACH | 19 | $300.00 | $325.00 | $331.35 | $300.00 | $300.00 | $368.37 |
| 33 | Remove and reinstall existing signs (0905-0101000A) | LS | 1 | $2,200.00 | $2,400.00 | $18,224 | $2,700.00 | $15,000 | $20,261 |
| 34 | Mono-directional white type iar markers, recessed (0855-0106100E) | EACH | 250 | $19.25 | $21.00 | $21.26 | $19.25 | $19.25 | $23.64 |
| 35 | Delineators, type 1 (0840-0100000E) | EACH | 500 | $70.00 | $75.00 | $80.63 | $70.00 | $70.00 | $89.64 |
| 36 | Extra for hand dug guardrail post holes (0810-0145000E) | EACH | 12 | $165.00 | $180.00 | $138.06 | $165.00 | $165.00 | $368.37 |
| 37 | Aggregate base (0641-0102000M) | TON | 13,800 | $52.05 | $77.00 | $27.98 | $65.00 | $30.50 | $69.45 |
| 38 | General structural concrete, class 3300 (0540-0301000A) | CY | 80 | $750.00 | $1,175.00 | $1,076.89 | $975.00 | $750.00 | $367.06 |
| 39 | Hydrant extensions (1160-0105000E) | EACH | 4 | $1,500.00 | $1,700.00 | $2,000.00 | $2,020.00 | $1,500.00 | $2,468.10 |
| 40 | Ductile iron pipe coupling, 6 inch (1140-0660000E) | EACH | 7 | $750.00 | $575.00 | $550.00 | $555.00 | $1,750.00 | $789.76 |
| 41 | Traffic signal modification, US97/26 SB (4TH ST) @ OR361 (SW D ST) (0990-0102000A) | EACH | 1 | $142,663 | $150,000 | $178,930 | $175,300 | $200,000 | $182,634 |
| 42 | Multiple mailbox supports (1070-0101000E) | EACH | 3 | $1,250.00 | $1,300.00 | $1,270.18 | $1,200.00 | $1,100.00 | $1,412.10 |
| 43 | Switching, conduit, and wiring (0970-0105000A) | LF | 5,600 | $63.59 | $70.54 | $65.48 | $78.57 | $22.32 | $81.59 |
| 44 | Signs, standard sheeting, extruded aluminum (0940-0201000J) | SF | 150 | $55.00 | $60.00 | $38.66 | $55.00 | $36.00 | $42.98 |
| 45 | Impact attenuator, type H (0830-0121000E) | EACH | 1 | $30,000 | $40,000 | $42,523 | $30,000 | $26,000 | $46,599 |
| 46 | Concrete curbs, mountable curb (0759-0118000F) | LF | 136 | $44.00 | $46.00 | $47.05 | $43.00 | $42.00 | $84.53 |
| 47 | Level 3, 1/2 inch lime treated ACP (0745-0322000M) | TON | 5,300 | $127.50 | $150.00 | $107.00 | $141.00 | $141.00 | $274.27 |
| 48 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 364 | $29.00 | $44.00 | $13.97 | $22.00 | $40.00 | $16.20 |
| 49 | Extra for manholes over existing sewers (0490-0123000E) | EACH | 7 | $2,000.00 | $3,900.00 | $8,770.00 | $8,850.00 | $1,600.00 | $1,605.14 |
| 50 | Concrete sawcutting, less than 6 inches deep (0310-0119210F) | LF | 2,450 | $4.00 | $5.10 | $2.65 | $9.00 | $8.50 | $6.75 |
| 51 | Lawn seeding (1030-0138000J) | SY | 2,837 | $0.40 | $1.50 | $1.10 | $1.00 | $1.00 | $1.23 |
| 52 | Deciduous trees, 2 inch caliper (1040-0130000E) | EACH | 11 | $419.50 | $650.00 | $662.70 | $2,951.00 | $2,950.00 | $3,622.34 |
| 53 | Root barrier (1040-0206000F) | LF | 32 | $18.00 | $32.00 | $33.14 | $20.00 | $20.00 | $24.56 |
| 54 | 4 inch connection to 4 inch existing main (1140-0300000E) | EACH | 1 | $1,200.00 | $4,000.00 | $432.00 | $436.00 | $1,500.00 | $7,641.13 |
| 55 | Signal pole mounts (0930-0107000A) | LB | 125 | $68.80 | $76.00 | $61.85 | $68.80 | $12.00 | $68.76 |
| 56 | Pole foundations (0970-0100000A) | EACH | 27 | $1,322.22 | $1,444.44 | $2,863.53 | $1,629.63 | $5,555.56 | $1,692.68 |
| 57 | Cold plane pavement removal, 2.5 - 3 inches deep (0620-0112000J) | SY | 2,300 | $1.69 | $6.50 | $6.28 | $2.90 | $6.00 | $4.16 |
| 58 | Aggregate base (0641-0102000M) | TON | 63 | $47.05 | $52.00 | $41.54 | $65.00 | $90.00 | $80.47 |
| 59 | Concrete manholes, shallow (0470-0105000E) | EACH | 15 | $2,500.00 | $6,800.00 | $5,590.00 | $5,641.00 | $4,600.00 | $5,582.44 |
| 60 | Paved culvert end slopes (0460-0100000J) | SF | 161 | $35.00 | $18.00 | $41.97 | $47.00 | $90.00 | $34.80 |
| 61 | 10 inch ductile iron pipe, 5 FT depth (0445-060010AF) | LF | 49 | $135.41 | $195.00 | $206.00 | $208.00 | $245.00 | $390.90 |
| 62 | Mailbox concrete collars (1070-0102000E) | EACH | 4 | $350.00 | $138.00 | $82.84 | $125.00 | $55.00 | $92.09 |
| 63 | Topsoil (1040-0101000K) | CY | 10 | $116.20 | $165.00 | $165.68 | $150.00 | $165.00 | $184.19 |
| 64 | Portable changeable message signs (0222-0164000E) | EACH | 3 | $22,000 | $11,115 | $22,090 | $15,000 | $19,500 | $11,496 |
| 65 | Temporary flexible pavement markers (0225-0149000E) | EACH | 3,000 | $2.00 | $1.25 | $0.61 | $0.50 | $2.50 | $2.61 |
| 66 | Check dam, type 1 (0280-0106010E) | EACH | 1 | $150.00 | $225.00 | $98.73 | $748.00 | $725.00 | $1,451.13 |
| 67 | Inlet protection, type 10 (0280-0114100E) | EACH | 42 | $75.00 | $53.00 | $137.71 | $140.00 | $200.00 | $111.85 |
| 68 | 24 inch storm sewer pipe, 10 FT depth (0445-035024BF) | LF | 791 | $214.86 | $175.00 | $305.00 | $310.00 | $315.00 | $181.65 |
| 69 | 36 inch storm sewer pipe, 20 FT depth (0445-035036CF) | LF | 219 | $455.00 | $350.00 | $790.00 | $800.00 | $600.00 | $460.79 |
| 70 | Pipe tees, 12 X 42 inch (0445-0650000E) | EACH | 1 | $12,950 | $25,000 | $16,000 | $16,145 | $17,500 | $15,778 |
| 71 | Single mailbox supports (1070-0100000E) | EACH | 1 | $850.00 | $500.00 | $552.25 | $450.00 | $750.00 | $613.96 |
| 72 | 6 inch connection to 6 inch existing main (1140-0300000E) | EACH | 6 | $1,500.00 | $4,000.00 | $300.00 | $303.00 | $2,000.00 | $3,391.60 |
| 73 | Relocate 3/4 inch water meter assembly (1170-0111000E) | EACH | 1 | $4,200.00 | $1,650.00 | $2,740.00 | $2,765.00 | $2,000.00 | $4,737.43 |
| 74 | Pollution control plan (0290-0100000A) | LS | 1 | $2,500.00 | $790.00 | $1,005.22 | $2,000.00 | $1,500.00 | $1,500.47 |
| 75 | Delineators, type 6 (0840-0105500E) | EACH | 40 | $80.00 | $27.00 | $14.02 | $20.00 | $20.00 | $276.28 |
| 76 | Repair temporary impact attenuator, truck mounted (0226-0141400E) | EACH | 4 | $2,500.00 | $550.00 | $1,325.41 | $615.00 | $1.00 | $9,579.60 |
| 77 | Bridge approach slab cold plane pavement removal, 2 inches deep (0503-0103100J) | SY | 195 | $29.00 | $44.00 | $13.97 | $22.00 | $40.00 | $16.20 |
| 78 | Concrete inlets, type D (0470-0311000E) | EACH | 2 | $3,825.00 | $3,000.00 | $3,953.93 | $1,740.00 | $4,550.00 | $6,019.49 |
| 79 | Bridge removal work (0501-0100000A) | SF | 1,028 | $29.28 | $77.82 | $40.15 | $35.02 | $28.21 | $63.43 |
| 80 | Sidewalk mounted combination bridge rail (0587-0112000A) | LF | 129 | $383.72 | $511.63 | $216.81 | $426.36 | $465.12 | $627.19 |
| 81 | Core correlation of nuclear gauge readings (0745-0900000E) | EACH | 2 | $1,500.00 | $2,200.00 | $2,209.01 | $2,000.00 | $2,000.00 | $2,455.83 |
| 82 | Traffic control supervisor (0223-0169000E) | EACH | 230 | $250.00 | $700.00 | $303.56 | $1,300.00 | $1,500.00 | $1,249.47 |
| 83 | Temporary barricades, type II (0224-0104000E) | EACH | 60 | $65.00 | $72.00 | $77.32 | $85.00 | $72.00 | $63.86 |
| 84 | Concrete washout facility (0280-0112500E) | EACH | 1 | $2,000.00 | $2,450.00 | $14,903 | $60,000 | $3,500.00 | $6,088.91 |
| 85 | 15 inch storm sewer pipe, 10 FT depth (0445-035015BF) | LF | 56 | $214.86 | $120.00 | $285.00 | $288.00 | $210.00 | $191.07 |
| 86 | 18 inch ductile iron pipe, 5 FT depth (0445-060018AF) | LF | 82 | $211.35 | $205.00 | $310.00 | $313.00 | $325.00 | $477.77 |
| 87 | 48 inch storm sewer pipe, 10 FT depth (0445-035048BF) | LF | 608 | $590.00 | $495.00 | $600.00 | $606.00 | $675.00 | $515.55 |
| 88 | Capping existing concrete structures (0490-0125000E) | EACH | 3 | $1,500.00 | $1,600.00 | $1,220.00 | $750.00 | $500.00 | $1,222.68 |
| 89 | Retaining wall "C", prefabricated modular gravity (0596-B002000A) | SF | 542 | $74.94 | $47.05 | $79.75 | $141.99 | $138.38 | $107.05 |
| 90 | Cold plane pavement removal, 2 1/2 inches deep (0620-0121000J) | SY | 14,000 | $1.69 | $3.80 | $6.21 | $2.50 | $3.50 | $3.99 |
| 91 | 8 inch asphalt concrete pavement repair (0748-0104000J) | SY | 1,500 | $30.00 | $53.00 | $81.00 | $48.00 | $61.00 | $55.26 |
| 92 | Extra for asphalt approaches (0749-0100000E) | EACH | 82 | $2,700.00 | $2,400.00 | $1,800.00 | $1,900.00 | $1,900.00 | $1,408.98 |
| 93 | Pavement legend, type B-HS: arrows (0867-0103100E) | EACH | 124 | $450.00 | $500.00 | $497.03 | $450.00 | $450.00 | $552.56 |
| 94 | Telecommunications, material (0987-0100000A) | LS | 1 | $16,810 | $18,000 | $1,104.50 | $20,700 | $40,000 | $21,520 |
| 95 | Concrete walks (0759-0128000J) | SF | 152,800 | $10.19 | $10.85 | $11.80 | $10.00 | $9.10 | $16.41 |
| 96 | 3 inch PVC pipe, 5 FT depth (0445-052003AF) | LF | 54 | $35.00 | $60.00 | $92.00 | $93.00 | $120.00 | $80.10 |
| 97 | Removal of guardrail (0310-0113000A) | LF | 1,507 | $4.15 | $4.64 | $8.84 | $5.11 | $23.22 | $6.36 |
| 98 | Segregate and stockpile contaminated soil (0294-0600000A) | LS | 1 | $8,000.00 | $40,000 | $1,552.23 | $42,000 | $6,000.00 | $1.27 |
| 99 | Temporary plastic drums (0224-0145000E) | EACH | 56 | $55.00 | $22.00 | $60.75 | $55.00 | $55.00 | $76.64 |
| 100 | PG 70-28ER asphalt in 1/2 inch ACP (0745-0642100M) | TON | 1,600 | $620.00 | $1.10 | $731.00 | $1.00 | $1.00 | $897.60 |
| 101 | Concrete curbs, standard curb (0759-0110000F) | LF | 13,700 | $40.00 | $30.00 | $37.85 | $36.00 | $38.00 | $15.44 |
| 102 | Adjusting guardrail (0812-0101000F) | LF | 975 | $4.25 | $4.75 | $6.63 | $4.25 | $4.25 | $6.02 |
| 103 | Signs, wide angle sheeting, sheet aluminum (0940-0205100J) | SF | 140 | $35.00 | $38.00 | $29.82 | $35.00 | $30.60 | $33.15 |
| 104 | Traffic signal modification, US26 @ US97 (0990-0102000A) | EACH | 1 | $159,754 | $170,000 | $194,393 | $196,300 | $225,000 | $204,513 |
| 105 | Weed control (1030-0101000R) | ACRE | 2 | $3,838.00 | $3,200.00 | $3,203.06 | $2,900.00 | $4,000.00 | $3,560.95 |
| 106 | 6 foot chain link fence (1050-0135000F) | LF | 850 | $44.95 | $39.00 | $39.40 | $50.00 | $64.00 | $61.40 |
| 107 | Moving existing hydrants (1160-0102000E) | EACH | 5 | $3,500.00 | $1,350.00 | $715.00 | $722.00 | $2,500.00 | $3,097.17 |
| 108 | Ductile iron pipe coupling, 4 inch (1140-0660000E) | EACH | 1 | $310.00 | $475.00 | $440.00 | $444.00 | $1,450.00 | $659.53 |
| 109 | Ductile iron pipe bend, 4 inch (1140-0650000E) | EACH | 4 | $600.00 | $650.00 | $430.00 | $434.00 | $1,450.00 | $643.09 |
| 110 | Replace meter box (1170-0111000E) | EACH | 48 | $1,000.00 | $550.00 | $543.00 | $548.00 | $1,700.00 | $2,321.00 |
| 111 | Metal handrail, 2 rail with optional rail (1069-0300000F) | LF | 580 | $154.45 | $170.00 | $261.77 | $190.00 | $141.00 | $235.52 |
| 112 | Flashing beacon installation, US97/26 @ love'S truck stop entrance, MP 96.84 (0990-0106000A) | EACH | 1 | $62,395 | $70,000 | $91,674 | $76,650 | $125,000 | $79,877 |
| 113 | Interconnect system (0990-0105000A) | LS | 1 | $29,402 | $32,000 | $49,703 | $36,120 | $52,000 | $37,640 |
| 114 | Remove existing signs (0905-0100000A) | LS | 1 | $9,600.00 | $10,000 | $13,806 | $11,775 | $19,500 | $15,349 |
| 115 | Pavement legend, type B-HS: disabled parking (0867-0173100E) | EACH | 1 | $850.00 | $900.00 | $938.83 | $850.00 | $850.00 | $1,043.73 |
| 116 | Midwest guardrail system, type 2A (0810-0146100F) | LF | 1,987.50 | $26.35 | $29.00 | $37.55 | $26.00 | $26.35 | $39.78 |
| 117 | Cold plane pavement removal, 5.5 inches deep (0620-0125000J) | SY | 9,700 | $1.69 | $6.50 | $10.51 | $3.50 | $6.00 | $4.39 |
| 118 | Concrete manholes, diversion (0470-0116000E) | EACH | 1 | $14,575 | $25,000 | $23,120 | $23,330 | $20,000 | $14,023 |
| 119 | Concrete inlets, type CG-3 (0470-0309000E) | EACH | 13 | $3,543.00 | $3,200.00 | $3,416.33 | $2,382.00 | $4,300.00 | $4,894.68 |
| 120 | Irrigation system (1120-0100000A) | LS | 1 | $14,900 | $57,000 | $35,344 | $83,200 | $120,000 | $190,427 |
| 121 | Truncated domes on new surfaces, curb ramp (0765-0100000J) | SF | 3,600 | $40.00 | $24.00 | $58.54 | $52.50 | $40.00 | $60.53 |
| 122 | Longitudinal pavement markings - paint (0860-0200000F) | LF | 4,510 | $1.20 | $1.25 | $1.33 | $1.20 | $1.20 | $1.47 |
| 123 | Drainage curbs (0480-0100000F) | LF | 672 | $15.00 | $36.00 | $38.04 | $49.00 | $28.41 | $43.43 |
| 124 | Trench resurfacing (0495-0100000J) | SY | 6,006 | $85.00 | $110.00 | $71.99 | $110.00 | $95.00 | $102.85 |
| 125 | Luminaires, lamps, and ballasts (0970-0104000A) | EACH | 11 | $634.45 | $681.82 | $702.87 | $781.82 | $13,636 | $812.21 |
| 126 | Hot applied joint sealant (0585-0400000A) | LF | 134 | $24.76 | $26.12 | $53.94 | $30.37 | $24.76 | $31.86 |
| 127 | Extra for salvaging and stockpiling bridge (0501-0200000A) | SF | 313 | $4.31 | $31.95 | $5.35 | $4.79 | $47.92 | $29.78 |
| 128 | Emulsified asphalt for tack coat (0730-0100000M) | TON | 100 | $550.00 | $350.00 | $955.00 | $325.00 | $325.00 | $1,172.66 |
| 129 | Cold plane pavement removal, 2 - 3 inches deep (0620-0112000J) | SY | 14,300 | $1.69 | $4.50 | $6.24 | $2.90 | $4.15 | $4.16 |
| 130 | Retaining wall "D", prefabricated modular gravity (0596-B002000A) | SF | 164 | $120.65 | $54.88 | $92.40 | $125.70 | $213.41 | $130.29 |
| 131 | Structure excavation (0510-0101000A) | CY | 72 | $50.00 | $43.06 | $87.44 | $77.78 | $277.78 | $149.64 |
| 132 | Concrete storm sewer manholes (0470-0101000E) | EACH | 11 | $4,500.00 | $8,300.00 | $5,715.00 | $5,800.00 | $5,100.00 | $6,520.64 |
| 133 | 8 inch culvert pipe, 5 FT depth (0445-010008AF) | LF | 10 | $145.00 | $95.00 | $109.00 | $110.00 | $135.00 | $166.10 |
| 134 | Mainline video with laser profile inspection (0415-0401000F) | LF | 7,447 | $11.25 | $12.00 | $11.05 | $11.00 | $10.00 | $13.51 |
| 135 | Construction entrance, type 1 (0280-0110010E) | EACH | 1 | $2,000.00 | $2,100.00 | $5,329.97 | $3,000.00 | $5,200.00 | $4,587.59 |
| 136 | Temporary signs (0222-0102000J) | SF | 3,644 | $17.00 | $19.00 | $24.30 | $21.00 | $17.00 | $20.74 |
| 137 | Matting, type D (0280-0105040J) | SY | 6,000 | $7.00 | $2.50 | $8.06 | $9.00 | $3.30 | $8.38 |
| 138 | Removal of pipes (0310-0100000F) | LF | 2,124 | $24.34 | $26.00 | $68.00 | $85.00 | $39.00 | $14.69 |
| 139 | Clearing and grubbing (0320-0100000A) | ACRE | 1 | $12,500 | $19,000 | $33,042 | $8,500.00 | $105,000 | $19,684 |
| 140 | Ductile iron pipe tees, 6 inch (1140-0610000E) | EACH | 3 | $1,080.00 | $1,170.00 | $920.00 | $928.00 | $1,750.00 | $1,159.19 |
| 141 | Flashing beacon installation, US97/26 SB (SW 4TH ST) @ SW G ST, MP 92.71 (0990-0106000A) | EACH | 1 | $57,484 | $63,000 | $81,733 | $72,000 | $125,000 | $73,590 |
| 142 | Major adjustment of manholes (0490-0121000E) | EACH | 2 | $2,000.00 | $2,900.00 | $3,116.00 | $3,140.00 | $2,500.00 | $5,680.66 |
| 143 | Signs, standard sheeting, sheet aluminum (0940-0202000J) | SF | 300 | $35.00 | $38.00 | $25.40 | $35.00 | $25.00 | $28.24 |
| 144 | Guardrail terminals, non-flared (0810-0129000E) | EACH | 9 | $3,895.00 | $4,300.00 | $4,384.88 | $3,896.00 | $4,000.00 | $4,389.79 |
| 145 | Concrete driveways (0759-0126000J) | SF | 25,100 | $13.25 | $11.50 | $15.48 | $13.00 | $11.25 | $18.12 |
| 146 | Telecommunications, installation (0987-0110000A) | LS | 1 | $29,857 | $32,000 | $2,209.01 | $37,000 | $55,000 | $38,222 |
| 147 | Salvage, stockpile, and reinstall unit pavers (0760-0100000J) | SF | 310 | $10.00 | $51.00 | $45.45 | $60.50 | $34.00 | $39.54 |
| 148 | Erosion and sediment control manager (0280-0110000A) | LS | 1 | $25,000 | $3,200.00 | $7,391.06 | $20,000 | $15,000 | $692,754 |
| 149 | 5 inch asphalt concrete pavement repair (0748-0103000J) | SY | 2,200 | $24.00 | $46.00 | $47.00 | $42.00 | $61.00 | $46.66 |
| 150 | Extra for inlets over existing sewers (0490-0123000E) | EACH | 10 | $1,500.00 | $950.00 | $5,220.00 | $1,730.00 | $4,400.00 | $1,284.43 |
| 151 | Concrete inlets, type CG-3 (modified) (0470-0310000E) | EACH | 1 | $3,620.00 | $4,400.00 | $3,084.22 | $1,680.00 | $4,350.00 | $4,673.98 |
| 152 | 12 inch storm sewer pipe, 10 FT depth (0445-035012BF) | LF | 1,119 | $130.94 | $100.00 | $243.00 | $245.00 | $210.00 | $141.78 |
| 153 | 12 inch storm sewer pipe, 5 FT depth (0445-035012AF) | LF | 1,399 | $103.49 | $110.00 | $133.00 | $135.00 | $195.00 | $89.69 |
| 154 | Temporary barricades, type III (0224-0105000E) | EACH | 39 | $180.00 | $200.00 | $220.90 | $185.00 | $215.00 | $83.02 |
| 155 | Flashing beacon installation, US97 @ NE cedar ST, MP 91.71 (0990-0106000A) | EACH | 1 | $72,158 | $80,000 | $96,092 | $88,640 | $125,000 | $92,375 |
| 156 | 5 foot chain link fence (1050-0135000F) | LF | 200 | $48.13 | $38.00 | $39.40 | $50.00 | $49.00 | $61.40 |
| 157 | Temporary pavement legends (0225-0153100E) | EACH | 5 | $115.00 | $125.00 | $127.02 | $142.00 | $115.00 | $141.21 |
| 158 | Concrete inlets, type G-2 (0470-0315000E) | EACH | 18 | $3,185.00 | $2,500.00 | $2,753.60 | $1,950.00 | $3,900.00 | $5,133.59 |
| 159 | BI-directional yellow type iar markers, recessed (0855-0107100E) | EACH | 710 | $19.25 | $21.00 | $21.26 | $19.25 | $19.25 | $23.64 |
| 160 | Temporary pavement bars (0225-0153200J) | SF | 3,816 | $3.50 | $3.75 | $3.87 | $4.30 | $3.50 | $4.30 |
| 161 | Sediment barrier, type 3 (0280-0115030F) | LF | 6,069 | $7.00 | $3.00 | $43.22 | $6.00 | $6.00 | $6.40 |
| 162 | Removal of surfacings for curb ramp construction (0310-0106101J) | SY | 25,720 | $35.67 | $23.00 | $4.59 | $33.70 | $38.00 | $56.76 |
| 163 | Lighting poles and arms (0970-0200000A) | EACH | 27 | $2,057.56 | $2,222.22 | $2,372.64 | $2,527.78 | $5,370.37 | $2,634.03 |
| 164 | Lead compliance plan (0294-0500000A) | LS | 1 | $4,500.00 | $8,500.00 | $1,005.22 | $2,000.00 | $1,500.00 | $2,000.23 |
| 165 | Water quality seeding (1030-0118000R) | ACRE | 1.70 | $5,227.00 | $5,500.00 | $3,755.31 | $3,400.00 | $3,400.00 | $4,174.90 |
| 166 | Cinder mulch (1040-0192000K) | CY | 5 | $188.00 | $165.00 | $165.68 | $225.00 | $250.00 | $276.28 |
| 167 | Tree grates (1040-0200000E) | EACH | 22 | $1,012.00 | $1,900.00 | $1,977.06 | $1,706.00 | $1,800.00 | $1,841.87 |
| 168 | Temporary impact attenuator, truck mounted (0226-0138000E) | EACH | 2 | $25,000 | $5,500.00 | $42,523 | $55,000 | $30,000 | $34,487 |
| 169 | Pedestrian channelizing devices (0228-0141600F) | LF | 800 | $35.00 | $28.00 | $28.72 | $30.00 | $30.00 | $19.16 |
| 170 | Inlet protection, type 11 (0280-0114110E) | EACH | 6 | $75.00 | $130.00 | $153.01 | $150.00 | $200.00 | $133.56 |
| 171 | Straw bale (0280-0119000E) | EACH | 25 | $50.00 | $8.00 | $54.22 | $17.00 | $23.00 | $84.69 |
| 172 | Bark mulch (1040-0190000K) | CY | 5 | $164.20 | $165.00 | $165.68 | $200.00 | $225.00 | $245.58 |
| 173 | Weed control geotextile (1040-0208000J) | SF | 7,500 | $0.54 | $0.35 | $0.33 | $1.20 | $1.25 | $1.47 |
| 174 | Asphalt pavement sawcutting, 6 to 14 inches deep (0310-0119120F) | LF | 60,000 | $6.00 | $6.10 | $3.16 | $5.00 | $7.00 | $3.74 |
| 175 | 12 foot X 72 inch chain link double gates (1050-0202000E) | EACH | 1 | $1,440.00 | $5,500.00 | $4,379.36 | $3,000.00 | $2,640.00 | $3,683.73 |
| 176 | Temporary work access and containment (0253-0106000A) | LS | 1 | $2,250.00 | $11,000 | $5,522.52 | $12,000 | $10,000 | $41,905 |
| 177 | Permanent surface mounted tubular markers (0856-0101000E) | EACH | 227 | $165.00 | $155.00 | $160.15 | $145.00 | $145.00 | $178.05 |
| 178 | Permanent seeding (1030-0108000R) | ACRE | 0.20 | $5,500.00 | $17,500 | $9,940.55 | $9,000.00 | $9,000.00 | $11,051 |
| 179 | Rock mulch (1040-0196000M) | TON | 12 | $117.90 | $165.00 | $165.68 | $305.00 | $325.00 | $374.51 |
| 180 | Pavement legend, type B-HS: "only" (0867-0107100E) | EACH | 3 | $925.00 | $1,000.00 | $1,021.67 | $925.00 | $925.00 | $1,135.82 |
| 181 | Pavement bar, type B-HS (0867-0145100J) | SF | 9,300 | $13.75 | $15.00 | $15.19 | $13.75 | $13.75 | $16.88 |
| 182 | Hydrant assemblies (1160-0100000E) | EACH | 6 | $6,901.00 | $6,150.00 | $6,000.00 | $6,054.00 | $8,500.00 | $7,222.57 |
| 183 | Telecommunications, splicing and testing (0987-0120000A) | LS | 1 | $5,000.00 | $5,500.00 | $6,627.02 | $6,200.00 | $55,000 | $6,400.88 |
| 184 | 14 inch ductile iron pipe, 5 FT depth (0445-060014AF) | LF | 62 | $160.00 | $185.00 | $265.00 | $268.00 | $260.00 | $447.39 |
| 185 | Minor adjustment of manholes (0490-0120000E) | EACH | 13 | $250.00 | $1,700.00 | $907.17 | $266.00 | $1,300.00 | $2,698.32 |
| 186 | Concrete manholes, with inlet (0470-0103000E) | EACH | 1 | $5,000.00 | $8,800.00 | $6,540.00 | $6,600.00 | $5,100.00 | $6,429.50 |
| 187 | 24 inch ductile iron pipe, 5 FT depth (0445-060024AF) | LF | 379 | $246.00 | $300.00 | $350.00 | $354.00 | $355.00 | $542.68 |
| 188 | 12 inch culvert pipe, 5 FT depth (0445-010012AF) | LF | 187 | $58.00 | $145.00 | $93.00 | $94.00 | $145.00 | $109.86 |
| 189 | Riprap basins (0390-0139000E) | EACH | 3 | $500.00 | $500.00 | $650.00 | $666.00 | $2,000.00 | $3,731.80 |
| 190 | Inlet protection, type 4 (0280-0114040E) | EACH | 53 | $75.00 | $75.00 | $148.55 | $150.00 | $200.00 | $205.25 |
| 191 | 6 inch gate valve (1150-0100000E) | EACH | 3 | $1,881.00 | $1,950.00 | $2,225.00 | $2,245.00 | $2,500.00 | $2,572.91 |
| 192 | Traffic signal modification, US97/26 NB (5TH ST) @ OR361 (SE D ST) (0990-0102000A) | EACH | 1 | $136,239 | $145,000 | $163,467 | $167,300 | $200,000 | $174,410 |
| 193 | Flaggers (0223-0168000T) | HR | 80 | $125.00 | $85.00 | $106.96 | $140.00 | $102.21 | $110.45 |
| 194 | Cold plane pavement removal, 3 inches deep (0620-0122000J) | SY | 17,400 | $1.69 | $4.25 | $5.89 | $2.60 | $4.00 | $4.03 |
| 195 | Securing concrete barrier (0820-0400000F) | LF | 68.75 | $40.00 | $65.00 | $65.17 | $40.00 | $34.00 | $72.45 |
| 196 | Bollards (0815-0100000E) | EACH | 10 | $1,350.00 | $665.00 | $441.80 | $1,300.00 | $900.00 | $1,841.87 |
| 197 | Removable bollards (0815-0101000E) | EACH | 1 | $1,100.00 | $1,095.00 | $2,319.46 | $1,320.00 | $1,100.00 | $2,148.85 |
| 198 | Delineators, type 5 (0840-0105000E) | EACH | 4 | $25.00 | $27.00 | $27.61 | $17.50 | $18.00 | $30.70 |
| 199 | Sequential arrow signs (0222-0162000E) | EACH | 4 | $1,000.00 | $3,335.00 | $2,209.01 | $2,200.00 | $5,000.00 | $5,172.98 |
| 200 | Temporary striping (0225-0153000F) | LF | 114,700 | $0.16 | $0.18 | $0.18 | $0.20 | $0.16 | $0.20 |
| 201 | Removal of curbs (0310-0101000F) | LF | 480 | $8.00 | $5.00 | $17.62 | $22.00 | $36.50 | $14.37 |
| 202 | Removal of structures and obstructions (0310-0106000A) | LS | 1 | $40,000 | $17,500 | $22,066 | $220,000 | $75,000 | $37,736 |
| 203 | 8 inch storm sewer pipe, 5 FT depth (0445-035008AF) | LF | 26 | $55.00 | $93.00 | $160.00 | $162.00 | $135.00 | $179.48 |
| 204 | 12 inch ductile iron pipe, 5 FT depth (0445-060012AF) | LF | 1,998 | $145.41 | $150.00 | $202.00 | $204.00 | $250.00 | $380.37 |
| 205 | Reconnecting existing water services, 2 inch (1170-0107000E) | EACH | 2 | $1,435.00 | $1,800.00 | $2,285.00 | $2,305.00 | $500.00 | $8,615.03 |
| 206 | Concrete in blocks (0445-0735030K) | CY | 7 | $834.00 | $750.00 | $730.00 | $740.00 | $2,100.00 | $933.88 |
| 207 | Filling abandoned structures (0490-0117000E) | EACH | 35 | $750.00 | $1,285.00 | $1,250.00 | $1,550.00 | $5,600.00 | $18,239 |
| 208 | Class 2 preparation (0504-0100000J) | SY | 67 | $150.00 | $165.00 | $209.86 | $184.00 | $150.00 | $193.03 |
| 209 | Retaining wall "A", prefabricated modular gravity (0596-B002000A) | SF | 112 | $148.48 | $54.46 | $87.51 | $130.45 | $223.21 | $72.85 |
| 210 | Reinforcement, grade 60 (0530-0104000A) | LB | 7,542 | $4.16 | $6.63 | $2.20 | $2.04 | $3.31 | $9.51 |
| 211 | Bridge identification markers (0842-0401000E) | EACH | 1 | $90.00 | $275.00 | $276.13 | $250.00 | $200.00 | $306.98 |
| 212 | Retaining wall "B", prefabricated modular gravity (0596-B002000A) | SF | 127 | $159.57 | $61.02 | $93.54 | $168.35 | $220.47 | $151.37 |
| 213 | Perforated steel square tube slip base sign supports (0930-0114000A) | LB | 15,600 | $0.08 | $0.08 | $9.43 | $0.08 | $8.01 | $10.48 |
| 214 | Wood sign posts (0910-0100000K) | FBM | 132 | $30.00 | $33.00 | $17.67 | $30.00 | $20.00 | $19.65 |
| 215 | Concrete barrier, tall (0820-0127000F) | LF | 68.75 | $200.00 | $240.00 | $193.29 | $200.00 | $190.00 | $214.88 |
| 216 | 6 inch potable water pipe, fittings & couplings with restrained joints and class B backfill (1140-0145000F) | LF | 130 | $165.00 | $175.00 | $80.00 | $81.00 | $190.00 | $110.11 |
| 217 | Temporary walks (0228-0167680J) | SF | 1,080 | $12.00 | $12.00 | $14.72 | $10.00 | $11.00 | $15.33 |
| 218 | Check dam, type 6 (0280-0106060E) | EACH | 3 | $250.00 | $195.00 | $152.78 | $352.00 | $400.00 | $990.58 |
| 219 | Inlet protection, type 3 (0280-0114030E) | EACH | 239 | $75.00 | $53.00 | $113.57 | $65.00 | $200.00 | $99.73 |
| 220 | Inlet protection, type 7 (0280-0114070E) | EACH | 4 | $75.00 | $115.00 | $149.32 | $150.00 | $200.00 | $184.47 |
| 221 | 30 inch storm sewer pipe, 10 FT depth (0445-035030BF) | LF | 711 | $313.19 | $250.00 | $367.00 | $371.00 | $460.00 | $211.11 |
| 222 | Sloped end sections, 24 inch (0445-0700240E) | EACH | 1 | $900.00 | $585.00 | $740.00 | $920.00 | $2,600.00 | $2,408.78 |
| 223 | Connection to existing structures (0490-0104000E) | EACH | 35 | $1,700.00 | $1,600.00 | $1,456.00 | $1,800.00 | $1,800.00 | $948.97 |
| 224 | Hot applied joint sealant (0585-0400000A) | LF | 89 | $23.63 | $25.84 | $51.47 | $28.99 | $23.60 | $30.41 |
| 225 | Concrete stairs (0759-0150000K) | CY | 1.10 | $3,602.00 | $2,200.00 | $7,041.08 | $7,000.00 | $7,848.00 | $3,958.31 |
| 226 | Concrete curbs, standard curb, modified (0759-0112000F) | LF | 271 | $44.00 | $38.00 | $45.99 | $43.00 | $42.00 | $90.27 |
| 227 | Level 4, 1/2 inch lime treated ACP (0745-0422000M) | TON | 25,200 | $83.00 | $105.00 | $57.40 | $98.50 | $98.50 | $70.48 |
| 228 | Adjusting inlets (0490-0105000E) | EACH | 20 | $1,800.00 | $1,600.00 | $1,609.59 | $523.00 | $1,350.00 | $748.65 |
| 229 | PG 64-28 asphalt in 1/2 inch ACP (0745-0622000M) | TON | 300 | $545.00 | $1.10 | $634.00 | $1.00 | $1.00 | $778.50 |
| 230 | Adjusting boxes (0490-0100000E) | EACH | 126 | $200.00 | $150.00 | $473.60 | $188.00 | $700.00 | $680.14 |
| 231 | Concrete islands (0759-0122000J) | SF | 2,320 | $18.00 | $13.00 | $16.89 | $14.00 | $16.00 | $24.95 |
| 232 | Soil testing (1040-0100000E) | EACH | 2 | $236.00 | $665.00 | $331.35 | $300.00 | $300.00 | $368.38 |
| 233 | Reconnecting existing water services, 3/4 inch (1170-0104000E) | EACH | 24 | $225.00 | $775.00 | $655.00 | $661.00 | $750.00 | $1,608.92 |
| 234 | Soil conditioner (1040-0107000K) | CY | 2 | $222.75 | $165.00 | $165.68 | $510.00 | $515.00 | $626.24 |
| 235 | Methyl methacrylate, extruded, grooved, non-profiled (0865-0116530F) | LF | 156,000 | $2.92 | $3.25 | $3.23 | $2.90 | $2.92 | $3.59 |
| 236 | Concrete curbs, curb and gutter (0759-0103000F) | LF | 8,300 | $45.00 | $44.00 | $60.82 | $58.00 | $45.00 | $52.55 |
| 237 | Extra for asphalt slope paving (0749-0108000J) | SF | 14,720 | $2.80 | $3.00 | $1.45 | $2.70 | $2.65 | $4.18 |
| 238 | Impact attenuator, type G (0830-0120000E) | EACH | 1 | $30,000 | $33,000 | $42,523 | $30,000 | $26,000 | $46,599 |
| 239 | Electrical systems installation (0985-0110000A) | LS | 1 | $6,500.00 | $7,000.00 | $1,656.76 | $8,000.00 | $380,000 | $8,321.14 |
| 240 | Type "F" concrete rail, 42 inch, modified (0587-0126100A) | LF | 55 | $546.91 | $606.36 | $662.70 | $636.36 | $1,090.91 | $858.69 |
| 241 | 36 inch storm sewer pipe, 10 FT depth (0445-035036BF) | LF | 388 | $298.00 | $320.00 | $440.00 | $444.00 | $500.00 | $357.96 |
| 242 | 6 inch ductile iron pipe with restrained joints and class B backfill (1140-0500000F) | LF | 39 | $87.41 | $215.00 | $123.00 | $124.00 | $2,000.00 | $347.26 |
| 243 | Seeding mobilization (1030-0102000E) | EACH | 2 | $737.50 | $3,500.00 | $1,380.63 | $1,250.00 | $1,250.00 | $1,534.89 |
| 244 | Crosswalk closure supports (0902-0101000E) | EACH | 19 | $1,500.00 | $1,650.00 | $1,435.85 | $1,500.00 | $1,200.00 | $1,596.29 |
| 245 | Signs, standard sheeting, plywood (0940-0203000J) | SF | 2,600 | $28.00 | $31.00 | $27.61 | $28.00 | $25.00 | $30.70 |
| 246 | Traffic signal modification, US97/26 NB (5TH ST) @ E B ST (0990-0102000A) | EACH | 1 | $141,885 | $150,000 | $171,198 | $174,300 | $200,000 | $181,638 |
| 247 | 30 inch storm sewer pipe, 20 FT depth (0445-035030CF) | LF | 324 | $360.00 | $320.00 | $750.00 | $757.00 | $500.00 | $413.00 |
| 248 | Delineators, type 4 alternate 2 (0840-0104200E) | EACH | 80 | $45.00 | $50.00 | $53.02 | $45.00 | $40.00 | $58.94 |
| 249 | 24 inch storm sewer pipe, 5 FT depth (0445-035024AF) | LF | 86 | $190.26 | $235.00 | $320.00 | $330.00 | $335.00 | $130.81 |
| 250 | 18 inch subgrade stabilization (0331-0109000J) | SY | 700 | $60.00 | $46.00 | $35.55 | $27.00 | $60.00 | $53.85 |
| 251 | Embankment in place (0330-0123000K) | CY | 3,701 | $43.30 | $30.00 | $44.37 | $45.00 | $40.00 | $25.47 |
| 252 | Flashing beacon installation, US97/26 @ SW brush lane, MP 96.68 (0990-0106000A) | EACH | 1 | $68,043 | $75,000 | $93,883 | $84,000 | $125,000 | $87,107 |
| 253 | Sediment fence (0280-0113000F) | LF | 911 | $3.50 | $3.00 | $2.64 | $5.00 | $5.00 | $6.84 |
| 254 | Flagger station lighting (0223-0168100E) | EACH | 4 | $1,200.00 | $3,335.00 | $2,540.36 | $4,000.00 | $1,200.00 | $3,680.77 |
| 255 | Pavement legend, type B-HS: yield line triangle (0867-0169100E) | EACH | 6 | $85.00 | $90.00 | $93.88 | $85.00 | $85.00 | $104.37 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from ODOT's tabulation for this contract. ODOT Bid Data Program yearly workbooks. ODOT publishes rank and unit price only: no bidder names and no bid totals, so these bids cannot be checked against a total and Oregon is left out of the competitor views.
Every contract let that day: ODOT letting of April 2, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.