SCDOT contract 4071780 bid tabulation
Richland County Rehab. 11/21/2024 8:03:35 AM. Let by South Carolina DOT on March 11, 2025, Richland, District 1. 5 bids received; low bid $10,554,671 by Palmetto Corp. of Conway.
- Owner
- South Carolina DOT
- Letting
- 11 MAR 2025
- Pay items
- 82
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Palmetto Corp. of Conway | $10,554,671 | Low |
| 2 | Blythe Construction, Inc. | $11,410,345 | +8.0% |
| 3 | Truerock Construction, LLC | $11,707,347 | +11% |
| 4 | C.R. Jackson, Inc. | $12,156,949 | +15% |
| 5 | Reeves Construction Company | $17,674,636 | +67% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Palmetto Corp. of Conway | 2. Blythe Construction, Inc. | 3. Truerock Construction, LLC | 4. C.R. Jackson, Inc. | 5. Reeves Construction Company |
|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $295,000 | $515,050 | $585,000 | $607,000 | $225,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $210,000 | $67,500 | $230,000 | $243,000 | $61,500 |
| 0030 | Railroad insurance and flagging 01 (1071403) | LS | 1 | $90,000 | $87,300 | $32,000 | $22,500 | $32,000 |
| 0040 | Removal & disposal of existing pavement (2023000) | SY | 3,445 | $24.40 | $40.00 | $35.00 | $35.00 | $48.61 |
| 0050 | Unclassified excavation (2031000) | CY | 112 | $88.00 | $175.70 | $170.00 | $140.00 | $224.84 |
| 0060 | Borrow excavation (2033000) | CY | 920.20 | $64.55 | $115.60 | $55.00 | $35.00 | $127.97 |
| 0070 | Excavation for shoulder paving (2036000) | STA | 247.10 | $27.30 | $68.05 | $100.00 | $225.00 | $95.39 |
| 0080 | Hauling of excavated shoulder material (2072000) | STA | 247.10 | $64.40 | $48.80 | $70.00 | $35.00 | $115.27 |
| 0090 | Maintenance stone (3059900) | TON | 153.65 | $120.00 | $47.00 | $100.00 | $125.00 | $104.70 |
| 0100 | HMA shoulder widening course (3104000) | TON | 960.96 | $76.80 | $96.88 | $110.00 | $72.00 | $152.42 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,279.53 | $725.00 | $703.75 | $700.00 | $650.00 | $885.26 |
| 0120 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 2,650 | $66.25 | $71.60 | $100.00 | $75.00 | $142.32 |
| 0130 | Full depth asph. pav. patching 8" unif (4012080) | SY | 12,715 | $84.25 | $94.75 | $110.00 | $80.00 | $180.21 |
| 0140 | Milling existing asphalt pavement 1.5" (4013115) | SY | 25,030 | $2.15 | $2.75 | $3.75 | $2.75 | $4.80 |
| 0150 | Milling existing asphalt pavement 1.75" (4013117) | SY | 10,525 | $3.10 | $3.40 | $3.50 | $3.75 | $5.30 |
| 0160 | Milling existing asphalt pavement 2.0" (4013120) | SY | 291,555 | $3.05 | $3.05 | $3.75 | $3.00 | $6.00 |
| 0170 | Milling existing asphalt pavement (variable) (4013990) | SY | 5,025 | $7.80 | $18.90 | $25.00 | $20.00 | $23.07 |
| 0171 | Asphalt intermediate course type B (4030320) | TON | 3,294.72 | $72.45 | $90.10 | $95.00 | $90.00 | $160.46 |
| 0180 | Asphalt surface course type B (4040320) | TON | 29,847.88 | $92.15 | $98.60 | $95.00 | $98.00 | $165.26 |
| 0190 | Asphalt surface course type C (4040340) | TON | 4,372.71 | $92.90 | $106.30 | $100.00 | $111.00 | $158.94 |
| 0200 | Asphalt surface course type D (4040350) | TON | 478.34 | $94.80 | $108.80 | $150.00 | $125.00 | $146.58 |
| 0210 | Driveway paving-surface type B (4047210) | TON | 18 | $645.00 | $354.00 | $500.00 | $800.00 | $454.94 |
| 0220 | Driveway paving-surface type C (4047220) | TON | 1,563.75 | $205.00 | $232.30 | $250.00 | $280.00 | $408.62 |
| 0230 | Driveway paving-surface type D (4047230) | TON | 90 | $240.00 | $238.75 | $325.00 | $225.00 | $354.82 |
| 0240 | Traffic control (6011000) | LS | 1 | $695,000 | $931,000 | $722,450 | $1,740,000 | $1,390,000 |
| 0250 | Permanent construction signs (ground mounted) (6051120) | SF | 5,024 | $5.35 | $5.35 | $4.25 | $5.55 | $7.50 |
| 0260 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 50,425 | $0.11 | $0.11 | $0.11 | $0.11 | $0.17 |
| 0270 | 6" white broken lines -(gaps excluded)-fast dry paint (6240007) | LF | 1,500 | $0.18 | $0.18 | $0.18 | $0.18 | $0.17 |
| 0280 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 227,810 | $0.11 | $0.11 | $0.11 | $0.11 | $0.17 |
| 0290 | 6" white solid lines (PVT. edge lines)-fast dry paint (6240012) | LF | 97,500 | $0.18 | $0.18 | $0.18 | $0.18 | $0.17 |
| 0300 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 19,520 | $0.25 | $0.25 | $0.25 | $0.25 | $0.17 |
| 0310 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 16,445 | $0.75 | $0.75 | $0.75 | $0.75 | $0.71 |
| 0320 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 320 | $10.00 | $10.00 | $10.00 | $10.00 | $21.43 |
| 0330 | White single bike lane arrow (LT, straight, RT)-fast dry paint (6240031) | EACH | 62 | $10.00 | $10.00 | $10.00 | $10.00 | $21.43 |
| 0340 | White word message "only"- fast dry paint (6240035) | EACH | 218 | $10.00 | $10.00 | $10.00 | $10.00 | $21.43 |
| 0350 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 46 | $10.00 | $10.00 | $10.00 | $10.00 | $21.43 |
| 0360 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 18 | $100.00 | $100.00 | $100.00 | $100.00 | $35.71 |
| 0370 | Bike lane symbol - fast dry paint (6240055) | EACH | 31 | $10.00 | $10.00 | $10.00 | $10.00 | $21.43 |
| 0380 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 33,360 | $0.11 | $0.11 | $0.11 | $0.11 | $0.17 |
| 0390 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 437,290 | $0.11 | $0.11 | $0.11 | $0.11 | $0.17 |
| 0400 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 5,020 | $0.25 | $0.25 | $0.25 | $0.25 | $1.07 |
| 0410 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 1,905 | $1.00 | $1.00 | $1.00 | $1.00 | $1.43 |
| 0420 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 17,025 | $0.52 | $0.52 | $0.52 | $0.52 | $1.21 |
| 0430 | 6" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271007) | LF | 500 | $0.75 | $0.75 | $0.75 | $0.75 | $1.79 |
| 0440 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 73,030 | $0.50 | $0.50 | $0.50 | $0.50 | $0.69 |
| 0450 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 32,500 | $0.70 | $0.70 | $0.70 | $0.70 | $0.97 |
| 0460 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 6,750 | $3.00 | $3.00 | $3.00 | $3.00 | $4.07 |
| 0470 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 15 | $5.00 | $5.00 | $5.00 | $5.00 | $35.71 |
| 0480 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 5,560 | $8.00 | $8.00 | $8.00 | $8.00 | $11.21 |
| 0490 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 109 | $55.00 | $55.00 | $55.00 | $55.00 | $107.14 |
| 0500 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 75 | $65.00 | $65.00 | $65.00 | $65.00 | $121.43 |
| 0510 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 16 | $75.00 | $75.00 | $75.00 | $75.00 | $214.29 |
| 0520 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 6 | $300.00 | $300.00 | $300.00 | $300.00 | $714.29 |
| 0530 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 11,110 | $0.52 | $0.52 | $0.52 | $0.52 | $0.69 |
| 0540 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 148,910 | $0.50 | $0.50 | $0.50 | $0.50 | $0.69 |
| 0550 | 8" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271078) | LF | 275 | $3.00 | $3.00 | $3.00 | $3.00 | $4.07 |
| 0560 | 24" yellow solid lines - thermoplastic - 125 mil. (6271080) | LF | 635 | $8.00 | $8.00 | $8.00 | $8.00 | $8.57 |
| 0570 | White bike symbol - hot applied preformed thermoplastic - 90 mils (6280051) | EACH | 31 | $159.00 | $159.00 | $159.00 | $159.00 | $357.14 |
| 0580 | White bike lane arrow - hot applied preformed thermoplastic - 90 mils (6280052) | EACH | 62 | $80.00 | $80.00 | $80.00 | $80.00 | $214.29 |
| 0590 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 1,222 | $5.00 | $5.00 | $5.00 | $5.00 | $9.64 |
| 0600 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 975 | $5.00 | $5.00 | $5.00 | $5.00 | $9.64 |
| 0610 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 2,291 | $5.00 | $5.00 | $5.00 | $5.00 | $9.64 |
| 0620 | Milled-in rumble strip (6321000) | MI | 6.76 | $500.00 | $500.00 | $500.00 | $500.00 | $999.58 |
| 0630 | Plastic curbing with single post (6562000) | EACH | 5 | $210.00 | $210.00 | $210.00 | $210.00 | $678.57 |
| 0640 | Plastic curbing with dual post (6562005) | EACH | 27 | $265.00 | $265.00 | $265.00 | $265.00 | $678.57 |
| 0650 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 670 | $24.75 | $13.75 | $24.75 | $13.75 | $21.43 |
| 0660 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 3,690 | $16.25 | $14.50 | $16.25 | $14.50 | $28.57 |
| 0670 | Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065) | LF | 150 | $35.00 | $28.00 | $35.00 | $28.00 | $71.43 |
| 0680 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 3,840 | $3.99 | $3.75 | $3.99 | $3.75 | $10.00 |
| 0690 | Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394) | LF | 150 | $4.28 | $4.50 | $4.28 | $4.50 | $11.14 |
| 0700 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 24,941 | $0.56 | $1.20 | $0.56 | $1.20 | $5.71 |
| 0710 | Sawcut for loop detector (6780495) | LF | 8,149 | $9.00 | $8.40 | $9.00 | $8.40 | $10.00 |
| 0720 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 30 | $264.00 | $495.00 | $264.00 | $495.00 | $2,142.86 |
| 0730 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 6 | $703.00 | $650.00 | $703.00 | $650.00 | $5,000.00 |
| 0740 | Adjust catch basin (7197110) | EACH | 4 | $2,975.00 | $3,000.00 | $2,000.00 | $2,900.00 | $2,857.14 |
| 0750 | Adjust drop inlet adjust D. I. (7197130) | EACH | 3 | $2,975.00 | $2,500.00 | $2,000.00 | $2,900.00 | $2,857.14 |
| 0760 | Concrete curb and gutter(1'-6") ogee (7203130) | LF | 50 | $60.50 | $70.00 | $36.00 | $38.00 | $51.43 |
| 0770 | Detectable warning material (7204900) | SF | 1,537.50 | $40.00 | $50.00 | $40.00 | $60.00 | $57.14 |
| 0780 | Pedestrian ramp construction (7209000) | SY | 3,075 | $180.20 | $140.00 | $120.00 | $142.00 | $171.43 |
| 0790 | Surface applied detectable warning (7209100) | SF | 30 | $70.00 | $60.00 | $60.00 | $60.00 | $85.71 |
| 0800 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 4.45 | $2,750.00 | $3,224.00 | $3,110.00 | $3,300.00 | $4,605.71 |
| 0810 | Mowing (8109901) | ACRE | 4.45 | $750.00 | $492.00 | $450.00 | $450.00 | $702.86 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of March 11, 2025. Compiled by Mirage Metrics.