SCDOT contract 4072820 bid tabulation
Richland County CTC Rehab. Let by South Carolina DOT on May 13, 2025, Richland, District 1. 5 bids received; low bid $3,405,913 by Palmetto Corp. of Conway.
- Owner
- South Carolina DOT
- Letting
- 13 MAY 2025
- Pay items
- 61
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Palmetto Corp. of Conway | $3,405,913 | Low |
| 2 | Blythe Construction, Inc. | $4,155,629 | +22% |
| 3 | Truerock Construction, LLC | $4,233,548 | +24% |
| 4 | Reeves Construction Company | $4,700,162 | +38% |
| 5 | C.R. Jackson, Inc. | $4,937,987 | +45% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Palmetto Corp. of Conway | 2. Blythe Construction, Inc. | 3. Truerock Construction, LLC | 4. Reeves Construction Company | 5. C.R. Jackson, Inc. |
|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $135,000 | $207,725 | $215,000 | $63,000 | $247,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $65,000 | $25,000 | $85,000 | $22,800 | $98,000 |
| 0030 | Railroad insurance and flagging 001 (1071403) | LS | 1 | $33,000 | $23,000 | $45,000 | $11,250 | $20,000 |
| 0040 | Removal & disposal of existing pavement (2023000) | SY | 687.50 | $33.00 | $40.00 | $36.00 | $50.00 | $40.00 |
| 0050 | Removal & disposal of existing curb (2024100) | LF | 405 | $36.50 | $15.00 | $16.00 | $18.75 | $15.00 |
| 0060 | Removal of exist. guardrail (2027801) | LF | 300 | $4.00 | $4.00 | $4.00 | $1.25 | $4.00 |
| 0070 | Borrow excavation (2033000) | CY | 276 | $71.50 | $135.25 | $80.00 | $105.68 | $150.00 |
| 0080 | Excavation for shoulder paving (2036000) | STA | 12.70 | $260.00 | $432.40 | $1,000.00 | $541.34 | $460.00 |
| 0090 | Hauling of excavated shoulder material (2072000) | STA | 12.70 | $87.00 | $108.00 | $275.00 | $165.01 | $110.00 |
| 0100 | Maintenance stone (3059900) | TON | 85.85 | $160.00 | $50.00 | $115.00 | $253.32 | $200.00 |
| 0110 | Liquid asphalt binder PG64-22 (4011004) | TON | 628.52 | $615.00 | $695.00 | $715.00 | $749.83 | $630.00 |
| 0120 | Full depth asph. pav. patching 6" unif. (4012060) | SY | 1,210 | $75.00 | $85.45 | $95.00 | $136.78 | $110.00 |
| 0130 | Full depth asph. pav. patching 8" unif (4012080) | SY | 7,375 | $84.75 | $84.25 | $120.00 | $133.22 | $112.00 |
| 0140 | Milling existing asphalt pavement 1.5" (4013115) | SY | 28,702 | $2.85 | $5.50 | $5.00 | $5.47 | $4.00 |
| 0150 | Milling existing asphalt pavement 1.75" (4013117) | SY | 23,085 | $2.95 | $4.85 | $6.00 | $6.46 | $4.10 |
| 0160 | Milling existing asphalt pavement 2.0" (4013120) | SY | 42,990 | $2.55 | $3.65 | $4.50 | $3.76 | $4.25 |
| 0170 | Milling existing asphalt pavement (variable) (4013990) | SY | 3,880 | $6.05 | $16.15 | $20.00 | $15.00 | $11.00 |
| 0180 | Asphalt surface course type B (4040320) | TON | 4,014.43 | $96.00 | $106.40 | $100.00 | $138.25 | $125.00 |
| 0190 | Asphalt surface course type C (4040340) | TON | 5,768.76 | $113.00 | $113.75 | $120.00 | $131.71 | $145.00 |
| 0200 | Driveway paving-surface type C (4047220) | TON | 703 | $235.00 | $441.40 | $350.00 | $362.40 | $285.00 |
| 0210 | Traffic control (6011000) | LS | 1 | $235,000 | $475,000 | $183,925 | $407,400 | $846,000 |
| 0220 | Permanent construction signs (ground mounted) (6051120) | SF | 2,644 | $5.45 | $5.45 | $5.45 | $6.81 | $6.75 |
| 0230 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 1,330 | $0.12 | $0.12 | $0.12 | $0.19 | $0.12 |
| 0240 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 60,420 | $0.13 | $0.13 | $0.13 | $0.19 | $0.13 |
| 0250 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 4,590 | $0.50 | $0.50 | $0.50 | $0.19 | $0.50 |
| 0260 | 12" white solid lines - fast dry paint (6240020) | LF | 270 | $0.50 | $0.50 | $0.50 | $1.25 | $0.50 |
| 0270 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 4,230 | $1.00 | $1.00 | $1.00 | $2.50 | $1.00 |
| 0280 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 30 | $10.00 | $10.00 | $10.00 | $18.75 | $10.00 |
| 0290 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 3 | $25.00 | $25.00 | $25.00 | $31.25 | $25.00 |
| 0300 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 180 | $0.15 | $0.15 | $0.15 | $0.19 | $0.15 |
| 0310 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 88,820 | $0.13 | $0.13 | $0.13 | $0.19 | $0.13 |
| 0320 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 510 | $0.48 | $0.48 | $0.75 | $0.94 | $0.48 |
| 0330 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 21,760 | $0.46 | $0.46 | $0.48 | $0.60 | $0.46 |
| 0340 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 1,590 | $3.00 | $3.00 | $2.75 | $3.44 | $3.00 |
| 0350 | 12" white solid lines - thermo. - 125 mil. (6271020) | LF | 90 | $5.00 | $5.00 | $4.15 | $5.19 | $5.00 |
| 0360 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 20 | $5.00 | $5.00 | $25.00 | $31.25 | $5.00 |
| 0370 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 1,515 | $10.00 | $10.00 | $8.00 | $10.00 | $10.00 |
| 0380 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 10 | $75.00 | $75.00 | $75.00 | $93.75 | $75.00 |
| 0390 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 1 | $500.00 | $500.00 | $400.00 | $500.00 | $500.00 |
| 0400 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 60 | $0.48 | $0.48 | $0.48 | $0.60 | $0.48 |
| 0410 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 31,360 | $0.46 | $0.46 | $0.48 | $0.60 | $0.46 |
| 0420 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 10 | $5.00 | $5.00 | $6.50 | $8.13 | $5.00 |
| 0430 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 10 | $5.00 | $5.00 | $6.50 | $8.13 | $5.00 |
| 0440 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 543 | $5.00 | $5.00 | $6.50 | $8.13 | $5.00 |
| 0450 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 120 | $24.75 | $24.75 | $24.75 | $16.88 | $15.00 |
| 0460 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 2,180 | $1.00 | $1.00 | $1.00 | $2.50 | $1.40 |
| 0470 | Sawcut for loop detector (6780495) | LF | 680 | $12.00 | $12.00 | $12.00 | $11.88 | $8.90 |
| 0480 | Catch basin - type 9 MH (top only) (7196152) | EACH | 1 | $4,175.00 | $2,000.00 | $3,000.00 | $2,500.00 | $2,000.00 |
| 0490 | Adjust catch basin (7197110) | EACH | 13 | $1,080.00 | $2,800.00 | $2,000.00 | $3,500.00 | $2,800.00 |
| 0500 | Adjust drop inlet adjust D. I. (7197130) | EACH | 4 | $1,350.00 | $2,500.00 | $2,000.00 | $3,125.00 | $2,500.00 |
| 0510 | Concrete curb and gutter(1'-6") ogee (7203130) | LF | 350 | $41.20 | $45.00 | $40.00 | $56.25 | $45.00 |
| 0520 | Concrete sidewalk(4" uniform) (7204100) | SY | 50 | $79.45 | $125.00 | $90.00 | $156.25 | $125.00 |
| 0530 | Detectable warning material (7204900) | SF | 300 | $45.00 | $55.00 | $40.00 | $68.75 | $55.00 |
| 0540 | Concrete driveway(6" uniform) (7205000) | SY | 37.50 | $239.00 | $140.00 | $90.00 | $175.00 | $140.00 |
| 0550 | Pedestrian ramp construction (7209000) | SY | 600 | $147.25 | $140.00 | $150.00 | $175.00 | $140.00 |
| 0560 | Surface applied detectable warning (7209100) | SF | 30 | $65.00 | $60.00 | $60.00 | $75.00 | $60.00 |
| 0570 | MT3 leading end treatment TL3 (8051151) | EACH | 1 | $4,200.00 | $4,200.00 | $4,200.00 | $6,056.00 | $4,200.00 |
| 0580 | MB trailing end treatment (8051710) | EACH | 1 | $1,750.00 | $1,750.00 | $1,750.00 | $2,875.00 | $1,750.00 |
| 0590 | MGS3 GR standard shoulder (8052100) | LF | 187.50 | $24.00 | $24.00 | $24.00 | $35.00 | $24.00 |
| 0600 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 1.33 | $3,175.00 | $3,250.00 | $3,900.00 | $3,968.75 | $3,300.00 |
| 0610 | Mowing (8109901) | ACRE | 0.74 | $750.00 | $1,000.00 | $1,550.00 | $937.50 | $615.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of May 13, 2025. Compiled by Mirage Metrics.