SCDOT contract 4074030 bid tabulation

2026 Richland CTC Rehab. Let by South Carolina DOT on October 14, 2025, Richland, District 1. 5 bids received; low bid $4,119,054 by C.R. Jackson, Inc..

Owner
South Carolina DOT
Letting
14 OCT 2025
Pay items
44
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1C.R. Jackson, Inc.$4,119,054Low
2Blythe Construction, Inc.$4,331,746+5.0%
3Palmetto Corp. of Conway$4,659,208+13%
4Truerock Construction, LLC$4,848,027+18%
5Reeves Construction Company$5,942,482+44%
SCDOT contract 4074030: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. C.R. Jackson, Inc.2. Blythe Construction, Inc.3. Palmetto Corp. of Conway4. Truerock Construction, LLC5. Reeves Construction Company
0010Mobilization (1031000)LS1$205,000$270,000$155,000$240,000$73,700
0020Bonds and insurance (1032010)LS1$82,000$25,000$92,000$96,000$19,200
0030Removal & disposal of existing pavement (2023000)SY750$35.00$40.00$34.50$40.00$64.75
0040Unclassified excavation (2031000)CY42$250.00$291.00$120.00$100.00$269.78
0050Borrow excavation (2033000)CY1,854$28.00$92.25$70.50$48.00$86.40
0060Excavation for shoulder paving (2036000)STA243.90$270.00$67.50$55.75$100.00$123.00
0070Hauling of excavated shoulder material (2072000)STA243.90$58.00$65.90$72.90$80.00$120.49
0080Maintenance stone (3059900)TON114.45$185.00$50.00$145.00$110.00$70.00
0090HMA shoulder widening course (3104000)TON1,219.68$78.00$89.00$91.45$105.00$127.22
0100Liquid asphalt binder PG64-22 (4011004)TON962.43$650.00$654.00$598.74$615.00$758.60
0110Full depth asph. pav. patching 6" unif. (4012060)SY11,445$65.00$57.50$67.95$85.00$104.28
0120Milling existing asphalt pavement 1.5" (4013115)SY235$14.50$33.00$29.10$20.00$30.27
0130Milling existing asphalt pavement 2.0" (4013120)SY200$17.00$38.75$34.10$25.00$35.56
0140Milling existing asphalt pavement (variable) (4013990)SY6,475$12.00$12.85$24.50$20.00$24.17
0150Asphalt surface course type C (4040340)TON12,545.10$80.00$89.30$105.10$110.00$131.45
0160Driveway paving-surface type C (4047220)TON1,763.50$170.00$318.50$250.00$250.00$332.43
0170Traffic control (6011000)LS1$473,500$270,000$450,000$365,225$663,300
0180Permanent construction signs (ground mounted) (6051120)SF1,752$6.25$6.25$5.95$6.25$9.25
01904" white broken lines -(gaps excluded)-fast dry paint (6240005)LF2,820$0.11$0.11$0.11$0.01$0.01
02004" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF133,900$0.11$0.11$0.11$0.08$0.10
02108"white solid lines (crosswalk& channelization)fast dry paint (6240015)LF1,120$0.50$0.50$0.50$0.08$0.10
022024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF2,240$0.50$0.50$0.50$1.50$1.88
0230White single arrow (left, straight, right)-fast dry paint (6240030)EACH4$10.00$10.00$10.00$5.00$6.25
0240White word message "only"- fast dry paint (6240035)EACH2$10.00$10.00$10.00$5.00$6.25
0250White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040)EACH2$10.00$10.00$10.00$5.00$6.25
02604"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF160,730$0.11$0.11$0.11$0.08$0.10
02704" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF310$0.48$0.48$0.48$0.75$0.94
02804" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF66,950$0.46$0.46$0.46$0.50$0.63
02908" white solid lines thermoplastic - 125 mil. (6271015)LF560$3.00$3.00$3.00$2.50$3.13
030024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF1,150$9.00$9.00$9.00$8.50$10.63
0310White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH2$75.00$75.00$75.00$75.00$93.75
0320White word message "only" - thermoplastic - 125 mil. (6271035)EACH1$75.00$75.00$75.00$75.00$93.75
0330White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040)EACH1$75.00$75.00$75.00$75.00$93.75
03404" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF80,365$0.46$0.46$0.46$0.50$0.63
0350Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH32$6.00$6.00$6.00$6.00$7.50
0360Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH634$6.00$6.00$6.00$6.00$7.50
0370Furnish & install 1.0" schedule 80 PVC conduit (6750275)LF20$16.95$17.50$17.50$16.95$21.88
0380Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413)LF1,450$1.20$1.15$1.15$1.20$1.44
0390Sawcut for loop detector (6780495)LF450$9.00$9.61$9.61$9.00$12.01
0400Adjust catch basin (7197110)EACH16$1,500.00$2,400.00$3,260.00$2,200.00$3,125.00
0410Adjust drop inlet adjust D. I. (7197130)EACH16$1,200.00$2,400.00$3,260.00$2,200.00$3,125.00
0420Detectable warning material (7204900)SF300$60.00$55.00$40.00$55.00$50.00
0430Pedestrian ramp construction (7209000)SY600$150.00$140.00$130.80$105.00$150.00
0440Permanent grassing for non-permitted resurfacing projects (8100102)ACRE8.84$3,300.00$2,850.00$2,850.00$3,492.00$4,365.00
SCDOT contract 4074030: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of October 14, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy