SCDOT contract 4074670 bid tabulation
2026 Richland Pavement Improvement. Let by South Carolina DOT on November 12, 2025, Richland, District 1. 5 bids received; low bid $9,698,857 by Blythe Construction, Inc..
- Owner
- South Carolina DOT
- Letting
- 12 NOV 2025
- Pay items
- 72
- Data through
- 13 OCT 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid |
|---|---|---|---|
| 1 | Blythe Construction, Inc. | $9,698,857 | Low |
| 2 | C.R. Jackson, Inc. | $10,685,870 | +10% |
| 3 | Palmetto Corp. of Conway | $11,205,616 | +16% |
| 4 | Truerock Construction, LLC | $11,708,049 | +21% |
| 5 | Reeves Construction Company | $19,627,960 | +102% |
Bid tabulation
| Line | Pay item | Unit | Quantity | 1. Blythe Construction, Inc. | 2. C.R. Jackson, Inc. | 3. Palmetto Corp. of Conway | 4. Truerock Construction, LLC | 5. Reeves Construction Company |
|---|---|---|---|---|---|---|---|---|
| 0010 | Mobilization (1031000) | LS | 1 | $325,250 | $530,000 | $428,000 | $595,000 | $440,000 |
| 0020 | Bonds and insurance (1032010) | LS | 1 | $83,000 | $210,000 | $220,000 | $238,000 | $152,000 |
| 0030 | Removal & disposal of existing pavement (2023000) | SY | 2,570 | $40.00 | $40.00 | $20.45 | $42.00 | $52.92 |
| 0040 | Removal & disposal of existing curb (2024100) | LF | 455 | $15.00 | $15.00 | $24.25 | $17.00 | $18.75 |
| 0050 | Borrow excavation (2033000) | CY | 828 | $81.80 | $35.00 | $58.90 | $60.00 | $123.96 |
| 0060 | Excavation for shoulder paving (2036000) | STA | 437.10 | $58.75 | $85.00 | $37.35 | $80.00 | $117.66 |
| 0070 | Hauling of excavated shoulder material (2072000) | STA | 437.10 | $53.65 | $60.00 | $71.20 | $70.00 | $168.23 |
| 0080 | Maintenance stone (3059900) | TON | 98 | $47.50 | $150.00 | $125.00 | $170.00 | $146.99 |
| 0090 | HMA shoulder widening course (3104000) | TON | 2,185.92 | $84.50 | $85.00 | $79.75 | $95.00 | $161.48 |
| 0100 | Liquid asphalt binder PG64-22 (4011004) | TON | 2,324.85 | $616.00 | $645.00 | $695.00 | $750.00 | $855.07 |
| 0110 | Full depth asph. pav. patching 8" unif (4012080) | SY | 9,800 | $77.00 | $76.00 | $83.15 | $110.00 | $189.62 |
| 0120 | Milling existing asphalt pavement 2.0" (4013120) | SY | 393,600 | $2.54 | $2.45 | $3.10 | $3.50 | $5.25 |
| 0130 | Asphalt surface course type B (4040320) | TON | 39,335.54 | $81.00 | $85.00 | $96.30 | $95.00 | $203.33 |
| 0140 | Driveway paving-surface type C (4047220) | TON | 827 | $268.00 | $200.00 | $210.00 | $300.00 | $567.78 |
| 0150 | Traffic control (6011000) | LS | 1 | $537,630 | $773,000 | $725,675 | $418,000 | $1,541,200 |
| 0160 | Permanent construction signs (ground mounted) (6051120) | SF | 2,836 | $5.35 | $5.35 | $5.35 | $5.35 | $6.88 |
| 0170 | 4" white broken lines -(gaps excluded)-fast dry paint (6240005) | LF | 76,800 | $0.11 | $0.11 | $0.11 | $0.11 | $0.15 |
| 0180 | 4" white solid lines (PVT. edge lines)-fast dry paint (6240010) | LF | 227,190 | $0.11 | $0.11 | $0.11 | $0.11 | $0.22 |
| 0190 | 6" white solid lines (PVT. edge lines)-fast dry paint (6240012) | LF | 660 | $0.18 | $0.18 | $0.18 | $0.18 | $0.22 |
| 0200 | 8"white solid lines (crosswalk& channelization)fast dry paint (6240015) | LF | 50,700 | $0.20 | $0.20 | $0.20 | $0.20 | $0.15 |
| 0210 | 24" white solid lines (stop/diagonal lines)-fast dry paint (6240025) | LF | 22,365 | $0.50 | $0.50 | $0.50 | $0.50 | $0.31 |
| 0220 | White single arrow (left, straight, right)-fast dry paint (6240030) | EACH | 432 | $10.00 | $10.00 | $10.00 | $10.00 | $6.25 |
| 0230 | White single bike lane arrow (LT, straight, RT)-fast dry paint (6240031) | EACH | 15 | $10.00 | $10.00 | $10.00 | $10.00 | $6.25 |
| 0240 | White word message "only"- fast dry paint (6240035) | EACH | 237 | $10.00 | $10.00 | $10.00 | $10.00 | $6.25 |
| 0250 | White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040) | EACH | 48 | $10.00 | $10.00 | $10.00 | $10.00 | $6.25 |
| 0260 | White lane drop arrow (left or right)-fast dry paint (6240043) | EACH | 12 | $20.00 | $20.00 | $20.00 | $20.00 | $6.25 |
| 0270 | Railroad crossing symbols - fast dry paint (6240045) | EACH | 3 | $50.00 | $50.00 | $50.00 | $50.00 | $31.25 |
| 0280 | Bike lane symbol - fast dry paint (6240055) | EACH | 15 | $10.00 | $10.00 | $10.00 | $10.00 | $12.50 |
| 0290 | 4" yellow broken lines(gaps exc) - fast dry paint (6240105) | LF | 31,500 | $0.11 | $0.11 | $0.11 | $0.11 | $0.22 |
| 0300 | 4"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110) | LF | 250,650 | $0.11 | $0.11 | $0.11 | $0.11 | $0.22 |
| 0310 | 6" yellow solid line on curb/median - fast dry paint (6240112) | LF | 7,975 | $0.50 | $0.50 | $0.50 | $0.50 | $0.94 |
| 0320 | 6"yel solid lines on 6"conc.curb(top&side)-fast dry PNT (6240113) | LF | 6,400 | $0.50 | $0.50 | $0.50 | $0.50 | $0.94 |
| 0330 | 24" yellow diagonal lines - fast dry paint (6240115) | LF | 1,080 | $1.00 | $1.00 | $1.00 | $1.00 | $0.63 |
| 0340 | 4" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005) | LF | 25,600 | $0.48 | $0.48 | $0.48 | $0.48 | $0.94 |
| 0350 | 4" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010) | LF | 75,730 | $0.46 | $0.46 | $0.46 | $0.46 | $0.56 |
| 0360 | 6" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012) | LF | 220 | $0.69 | $0.69 | $0.69 | $0.69 | $0.94 |
| 0370 | 8" white solid lines thermoplastic - 125 mil. (6271015) | LF | 16,900 | $2.50 | $2.50 | $2.50 | $2.50 | $3.13 |
| 0380 | 12IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023) | LF | 35 | $5.00 | $5.00 | $5.00 | $5.00 | $18.75 |
| 0390 | 24" white solid lines (stop/diag lines)-thermo.-125 mil (6271025) | LF | 7,500 | $8.00 | $8.00 | $8.00 | $8.00 | $8.44 |
| 0400 | White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030) | EACH | 144 | $60.00 | $60.00 | $60.00 | $60.00 | $81.25 |
| 0410 | White word message "only" - thermoplastic - 125 mil. (6271035) | EACH | 79 | $60.00 | $60.00 | $60.00 | $60.00 | $81.25 |
| 0420 | White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040) | EACH | 16 | $75.00 | $75.00 | $75.00 | $75.00 | $187.50 |
| 0430 | White lane drop arrow(LT.or RT.)thermo-125MIL (6271043) | EACH | 4 | $150.00 | $150.00 | $150.00 | $150.00 | $187.50 |
| 0440 | Railroad crossing symbols - thermoplastic - 125 mil. (6271045) | EACH | 1 | $400.00 | $400.00 | $400.00 | $400.00 | $625.00 |
| 0450 | 4" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064) | LF | 10,500 | $0.45 | $0.48 | $0.48 | $0.48 | $0.56 |
| 0460 | 4" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074) | LF | 83,550 | $0.46 | $0.46 | $0.46 | $0.46 | $0.56 |
| 0470 | 24" yellow solid lines - thermoplastic - 125 mil. (6271080) | LF | 360 | $10.00 | $10.00 | $10.00 | $10.00 | $7.50 |
| 0480 | Bike lane symbol -preformed thermo - 60MIL (6280055) | EACH | 5 | $150.00 | $150.00 | $150.00 | $150.00 | $125.00 |
| 0490 | Bike lane arrow - preformed thermo - 60MIL (6280056) | EACH | 5 | $65.00 | $65.00 | $65.00 | $65.00 | $125.00 |
| 0500 | Permanent clear pavement markers- mono-dir.- 4"X4" (6300005) | EACH | 5,470 | $5.00 | $5.00 | $5.00 | $5.00 | $6.25 |
| 0510 | Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005) | EACH | 940 | $5.00 | $5.00 | $5.00 | $5.00 | $6.25 |
| 0520 | Permanent yellow pavement markers BI-dir.- 4"X4" (6301100) | EACH | 2,120 | $5.00 | $5.00 | $5.00 | $5.00 | $6.25 |
| 0530 | Milled-in rumble strip (6321000) | MI | 10.98 | $500.00 | $1,050.00 | $500.00 | $500.00 | $1,506.35 |
| 0540 | Plastic curbing with dual post (6562005) | EACH | 15 | $275.00 | $275.00 | $275.00 | $275.00 | $312.50 |
| 0550 | Furnish & install 1.0" schedule 80 PVC conduit (6750275) | LF | 2,635 | $17.50 | $15.00 | $17.50 | $15.98 | $25.00 |
| 0560 | Furnish & install 2.0" schedule 80 PVC conduit (6750278) | LF | 19,065 | $18.00 | $17.00 | $18.00 | $16.96 | $25.71 |
| 0570 | Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065) | LF | 775 | $35.00 | $65.00 | $35.00 | $34.50 | $50.00 |
| 0580 | Furnish & install no. 14 copper wire, 4 conductor - gray (6770389) | LF | 19,840 | $5.21 | $6.50 | $5.21 | $6.56 | $7.44 |
| 0590 | Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394) | LF | 775 | $5.70 | $7.30 | $5.70 | $6.96 | $8.14 |
| 0600 | Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413) | LF | 60,760 | $1.15 | $4.00 | $1.15 | $1.30 | $1.64 |
| 0610 | Sawcut for loop detector (6780495) | LF | 19,685 | $9.61 | $10.00 | $9.61 | $11.20 | $13.73 |
| 0620 | F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508) | EACH | 155 | $596.42 | $800.00 | $596.42 | $596.00 | $852.00 |
| 0630 | F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518) | EACH | 31 | $831.17 | $3,000.00 | $831.17 | $650.00 | $1,187.00 |
| 0640 | Adjust catch basin (7197110) | EACH | 8 | $2,400.00 | $2,400.00 | $2,530.00 | $2,310.00 | $3,000.00 |
| 0650 | Adjust drop inlet adjust D. I. (7197130) | EACH | 2 | $2,400.00 | $2,400.00 | $2,530.00 | $2,310.00 | $3,000.00 |
| 0660 | Concrete curb and gutter(1'-6") vertical face (7203110) | LF | 375 | $50.00 | $50.00 | $111.15 | $43.00 | $62.50 |
| 0670 | Concrete curb and gutter (3'-0") vertical face (7203310) | LF | 80 | $70.00 | $70.00 | $138.10 | $57.00 | $87.50 |
| 0680 | Concrete sidewalk(4" uniform) (7204100) | SY | 370 | $70.00 | $70.00 | $145.25 | $107.00 | $87.50 |
| 0690 | Detectable warning material (7204900) | SF | 1,100 | $55.00 | $55.00 | $45.00 | $58.00 | $68.75 |
| 0700 | Pedestrian ramp construction (7209000) | SY | 2,200 | $140.00 | $140.00 | $178.50 | $149.00 | $175.00 |
| 0710 | Surface applied detectable warning (7209100) | SF | 40 | $60.00 | $60.00 | $55.00 | $58.00 | $75.00 |
| 0720 | Permanent grassing for non-permitted resurfacing projects (8100102) | ACRE | 4 | $3,415.98 | $3,300.00 | $3,135.22 | $4,415.98 | $4,250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.
Every contract let that day: SCDOT letting of November 12, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.