SCDOT contract 4074670 bid tabulation

2026 Richland Pavement Improvement. Let by South Carolina DOT on November 12, 2025, Richland, District 1. 5 bids received; low bid $9,698,857 by Blythe Construction, Inc..

Owner
South Carolina DOT
Letting
12 NOV 2025
Pay items
72
Data through
13 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Blythe Construction, Inc.$9,698,857Low
2C.R. Jackson, Inc.$10,685,870+10%
3Palmetto Corp. of Conway$11,205,616+16%
4Truerock Construction, LLC$11,708,049+21%
5Reeves Construction Company$19,627,960+102%
SCDOT contract 4074670: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Blythe Construction, Inc.2. C.R. Jackson, Inc.3. Palmetto Corp. of Conway4. Truerock Construction, LLC5. Reeves Construction Company
0010Mobilization (1031000)LS1$325,250$530,000$428,000$595,000$440,000
0020Bonds and insurance (1032010)LS1$83,000$210,000$220,000$238,000$152,000
0030Removal & disposal of existing pavement (2023000)SY2,570$40.00$40.00$20.45$42.00$52.92
0040Removal & disposal of existing curb (2024100)LF455$15.00$15.00$24.25$17.00$18.75
0050Borrow excavation (2033000)CY828$81.80$35.00$58.90$60.00$123.96
0060Excavation for shoulder paving (2036000)STA437.10$58.75$85.00$37.35$80.00$117.66
0070Hauling of excavated shoulder material (2072000)STA437.10$53.65$60.00$71.20$70.00$168.23
0080Maintenance stone (3059900)TON98$47.50$150.00$125.00$170.00$146.99
0090HMA shoulder widening course (3104000)TON2,185.92$84.50$85.00$79.75$95.00$161.48
0100Liquid asphalt binder PG64-22 (4011004)TON2,324.85$616.00$645.00$695.00$750.00$855.07
0110Full depth asph. pav. patching 8" unif (4012080)SY9,800$77.00$76.00$83.15$110.00$189.62
0120Milling existing asphalt pavement 2.0" (4013120)SY393,600$2.54$2.45$3.10$3.50$5.25
0130Asphalt surface course type B (4040320)TON39,335.54$81.00$85.00$96.30$95.00$203.33
0140Driveway paving-surface type C (4047220)TON827$268.00$200.00$210.00$300.00$567.78
0150Traffic control (6011000)LS1$537,630$773,000$725,675$418,000$1,541,200
0160Permanent construction signs (ground mounted) (6051120)SF2,836$5.35$5.35$5.35$5.35$6.88
01704" white broken lines -(gaps excluded)-fast dry paint (6240005)LF76,800$0.11$0.11$0.11$0.11$0.15
01804" white solid lines (PVT. edge lines)-fast dry paint (6240010)LF227,190$0.11$0.11$0.11$0.11$0.22
01906" white solid lines (PVT. edge lines)-fast dry paint (6240012)LF660$0.18$0.18$0.18$0.18$0.22
02008"white solid lines (crosswalk& channelization)fast dry paint (6240015)LF50,700$0.20$0.20$0.20$0.20$0.15
021024" white solid lines (stop/diagonal lines)-fast dry paint (6240025)LF22,365$0.50$0.50$0.50$0.50$0.31
0220White single arrow (left, straight, right)-fast dry paint (6240030)EACH432$10.00$10.00$10.00$10.00$6.25
0230White single bike lane arrow (LT, straight, RT)-fast dry paint (6240031)EACH15$10.00$10.00$10.00$10.00$6.25
0240White word message "only"- fast dry paint (6240035)EACH237$10.00$10.00$10.00$10.00$6.25
0250White combination arrow(STR.& RT.or STR.& LT.)fast dry paint (6240040)EACH48$10.00$10.00$10.00$10.00$6.25
0260White lane drop arrow (left or right)-fast dry paint (6240043)EACH12$20.00$20.00$20.00$20.00$6.25
0270Railroad crossing symbols - fast dry paint (6240045)EACH3$50.00$50.00$50.00$50.00$31.25
0280Bike lane symbol - fast dry paint (6240055)EACH15$10.00$10.00$10.00$10.00$12.50
02904" yellow broken lines(gaps exc) - fast dry paint (6240105)LF31,500$0.11$0.11$0.11$0.11$0.22
03004"yellow solid line(PVT.edge&no passing zone)-fast dry paint (6240110)LF250,650$0.11$0.11$0.11$0.11$0.22
03106" yellow solid line on curb/median - fast dry paint (6240112)LF7,975$0.50$0.50$0.50$0.50$0.94
03206"yel solid lines on 6"conc.curb(top&side)-fast dry PNT (6240113)LF6,400$0.50$0.50$0.50$0.50$0.94
033024" yellow diagonal lines - fast dry paint (6240115)LF1,080$1.00$1.00$1.00$1.00$0.63
03404" white broken lines(gaps excl.)thermoplastic- 90 mil. (6271005)LF25,600$0.48$0.48$0.48$0.48$0.94
03504" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271010)LF75,730$0.46$0.46$0.46$0.46$0.56
03606" white solid lines (PVT. edge lines) thermo.- 90 mil. (6271012)LF220$0.69$0.69$0.69$0.69$0.94
03708" white solid lines thermoplastic - 125 mil. (6271015)LF16,900$2.50$2.50$2.50$2.50$3.13
038012IN X 18IN white triang. yield bar (gaps exc)thermo-125MIL (6271023)LF35$5.00$5.00$5.00$5.00$18.75
039024" white solid lines (stop/diag lines)-thermo.-125 mil (6271025)LF7,500$8.00$8.00$8.00$8.00$8.44
0400White single arrows (LT, STRGHT, RT) thermo.-125 mil. (6271030)EACH144$60.00$60.00$60.00$60.00$81.25
0410White word message "only" - thermoplastic - 125 mil. (6271035)EACH79$60.00$60.00$60.00$60.00$81.25
0420White combination arrows(STR&RT.or STR& LT)thermo-125MIL (6271040)EACH16$75.00$75.00$75.00$75.00$187.50
0430White lane drop arrow(LT.or RT.)thermo-125MIL (6271043)EACH4$150.00$150.00$150.00$150.00$187.50
0440Railroad crossing symbols - thermoplastic - 125 mil. (6271045)EACH1$400.00$400.00$400.00$400.00$625.00
04504" yellow broken lines(gaps exc)thermoplastic - 90 mil. (6271064)LF10,500$0.45$0.48$0.48$0.48$0.56
04604" yellow solid lines(PVT.edge lines) thermo- 90 mil. (6271074)LF83,550$0.46$0.46$0.46$0.46$0.56
047024" yellow solid lines - thermoplastic - 125 mil. (6271080)LF360$10.00$10.00$10.00$10.00$7.50
0480Bike lane symbol -preformed thermo - 60MIL (6280055)EACH5$150.00$150.00$150.00$150.00$125.00
0490Bike lane arrow - preformed thermo - 60MIL (6280056)EACH5$65.00$65.00$65.00$65.00$125.00
0500Permanent clear pavement markers- mono-dir.- 4"X4" (6300005)EACH5,470$5.00$5.00$5.00$5.00$6.25
0510Permanent yellow pavement markers mono-dir.- 4"X 4" perm. yel. (6301005)EACH940$5.00$5.00$5.00$5.00$6.25
0520Permanent yellow pavement markers BI-dir.- 4"X4" (6301100)EACH2,120$5.00$5.00$5.00$5.00$6.25
0530Milled-in rumble strip (6321000)MI10.98$500.00$1,050.00$500.00$500.00$1,506.35
0540Plastic curbing with dual post (6562005)EACH15$275.00$275.00$275.00$275.00$312.50
0550Furnish & install 1.0" schedule 80 PVC conduit (6750275)LF2,635$17.50$15.00$17.50$15.98$25.00
0560Furnish & install 2.0" schedule 80 PVC conduit (6750278)LF19,065$18.00$17.00$18.00$16.96$25.71
0570Furnish & install 2" schedule 80 HDPE conduit (directional bored) (6760065)LF775$35.00$65.00$35.00$34.50$50.00
0580Furnish & install no. 14 copper wire, 4 conductor - gray (6770389)LF19,840$5.21$6.50$5.21$6.56$7.44
0590Furnish & install no. 14 copper wire, 8 conductor (gray) (6770394)LF775$5.70$7.30$5.70$6.96$8.14
0600Furnish & instl no. 14 copper wire,1-conductor for loop wire (6770413)LF60,760$1.15$4.00$1.15$1.30$1.64
0610Sawcut for loop detector (6780495)LF19,685$9.61$10.00$9.61$11.20$13.73
0620F&I-12"X12"X12"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800508)EACH155$596.42$800.00$596.42$596.00$852.00
0630F&I-13"X24"X18"D.elec.flush undgrd.enclos- (STR.poly.conc.)HD (6800518)EACH31$831.17$3,000.00$831.17$650.00$1,187.00
0640Adjust catch basin (7197110)EACH8$2,400.00$2,400.00$2,530.00$2,310.00$3,000.00
0650Adjust drop inlet adjust D. I. (7197130)EACH2$2,400.00$2,400.00$2,530.00$2,310.00$3,000.00
0660Concrete curb and gutter(1'-6") vertical face (7203110)LF375$50.00$50.00$111.15$43.00$62.50
0670Concrete curb and gutter (3'-0") vertical face (7203310)LF80$70.00$70.00$138.10$57.00$87.50
0680Concrete sidewalk(4" uniform) (7204100)SY370$70.00$70.00$145.25$107.00$87.50
0690Detectable warning material (7204900)SF1,100$55.00$55.00$45.00$58.00$68.75
0700Pedestrian ramp construction (7209000)SY2,200$140.00$140.00$178.50$149.00$175.00
0710Surface applied detectable warning (7209100)SF40$60.00$60.00$55.00$58.00$75.00
0720Permanent grassing for non-permitted resurfacing projects (8100102)ACRE4$3,415.98$3,300.00$3,135.22$4,415.98$4,250.00
SCDOT contract 4074670: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from SCDOT's tabulation for this contract. SCDOT Tabulation of Bids PDFs, one per contract, from its public bid tabulation library, January 2022 to October 2026, with bidder names from each contract's vendor ranking. Bids that did not match their published total are left out.

Every contract let that day: SCDOT letting of November 12, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy