TDOT contract CN261013 bid tabulation

The on-call guardrail repair and new guardrail installation on various interstate and state routes. Let by Tennessee DOT on March 20, 2026, Counties Anderson, Blount, Campbell, Carter, Claiborne, Cocke, Grainger, Greene, Hamblen, Hancock, Hawkins, Jefferson, Johnson, Knox, Loudon, Monroe, Morgan, Roane, Scott, Sevier, Sullivan, Unicoi, Union, And Washington. 3 bids received; low bid $5,490,700 by Tennessee Guardrail, Inc..

Owner
Tennessee DOT
Letting
20 MAR 2026
Pay items
63
Data through
02 OCT 2026

Bidders

RankBidderTotal bidAgainst the low bid
1Tennessee Guardrail, Inc.$5,490,700Low
2Superior Traffic Control, LLC$5,833,510+6.0%
3Reynolds Fence and Guardrail, Inc.$5,899,870+7.0%
TDOT contract CN261013: bids by rank

Bid tabulation

LinePay itemUnitQuantity1. Tennessee Guardrail, Inc.2. Superior Traffic Control, LLC3. Reynolds Fence and Guardrail, Inc.
1Guardrail at bridge ends (705-01.01)LF375$74.00$80.00$104.00
2Guardrail at bridge piers (705-01.02)LF50$41.50$75.00$61.00
3Metal beam guard fence (705-01.04)LF150$76.00$90.00$75.00
4Shop curved guardrail at bridge ends (705-01.50)LF50$40.00$100.00$104.00
5Single guardrail, with rub-rail (type 2) (705-02.01)LF150$30.00$45.00$100.00
6Single guardrail (type 2) (705-02.02)LF25,000$28.50$28.00$23.00
7Rub-rail (only) (705-02.05)LF20$20.50$30.00$30.00
8Guardrail transition 27IN to 31IN (705-02.10)EACH75$50.00$80.00$70.00
9Single guardrail (type 2) long post (6 FT-9 FT) (705-02.20)LF18,500$31.00$33.00$30.00
10Single guardrail (type 2) long post (9 FT-12 FT) (705-02.25)LF300$34.00$40.00$42.00
11Shop curved guardrail (705-02.50)LF35$46.00$50.00$31.00
12Median divider guardrail, with rub-rail (type 2) (705-03.01)LF275$50.00$75.00$181.00
13Median divider guardrail (type 2) (705-03.02)LF250$30.00$42.00$72.00
14Median divider guardrail (type 2) (27" MT HT) (705-03.03)LF100$34.00$70.00$71.00
15Median divider guardrail at concrete barrier (705-03.04)LF25$46.00$100.00$83.00
16Guardrail terminal (type 12) (705-04.02)EACH2$2,600.00$3,000.00$2,200.00
17Guardrail terminal (type 13) (705-04.03)EACH1$500.00$1,200.00$950.00
18Guardrail terminal (type-in-line) (705-04.05)EACH2$500.00$1,000.00$650.00
19Stone for guardrail end terminal pad (705-04.11)TON650$66.00$80.00$50.00
20Guardrail delineation enhancement (705-04.21)LF100$3.50$5.00$7.00
21Guardrail end terminal delineation sheeting (705-04.24)SF50$4.00$30.00$20.00
22C-A-T crash cushion attenuating terminal (705-04.29)EACH6$9,400.00$15,000$8,000.00
23W beam GR (type 2) MASH TL-3 (705-06.01)LF300$29.00$30.00$40.00
24W beam GR (type 2) MASH TL-3 (long post) (705-06.02)LF2,000$30.00$34.00$36.00
25Weak-post guardrail attachment to culvert(MASH TL-3) (705-06.09)LF75$260.00$300.00$210.00
26GR terminaltrailing end (type 13) MASH TL-3 (705-06.10)EACH35$1,200.00$1,200.00$1,650.00
27GR terminal (in-inline) MASH TL-3 (705-06.11)EACH45$1,000.00$1,200.00$1,300.00
28Tangent energy absorbing term MASH TL-3 (705-06.20)EACH640$3,100.00$3,200.00$3,100.00
29Tangent energy absorbing term MASH TL-3 (powder coating) (705-06.21)EACH6$6,870.00$6,200.00$5,000.00
30Thrie beam bridge transition MASH TL-3 (705-06.25)EACH2$2,300.00$2,200.00$3,200.00
31Thrie beam bridge transition MASH TL-2 (705-06.26)EACH2$1,750.00$1,800.00$1,800.00
32GR terminal (energy absorbing) MASH TL-2 (705-06.30)EACH25$3,000.00$3,000.00$2,500.00
33Guardrail attachment to slope face endpost (705-10.30)LF150$150.00$180.00$104.00
34Guardrail attachment to vertical face endpost (705-10.31)LF75$127.00$130.00$110.00
35Guardrail attachment to existing bridge pier protection (705-10.32)EACH1$3,100.00$3,000.00$1,700.00
36Guardrail bridgerail attached to bridge curbs (705-10.38)LF50$110.00$180.00$25.00
37Guardrail end terminal SKT 350 bolt conversion (705-10.98)EACH50$46.00$50.00$25.00
38Guardrail end terminal anchor cable assembly (705-10.99)EACH5$400.00$1,500.00$110.00
39Guardrail at bridge ends (powder coated) (705-11.01)LF30$85.50$100.00$160.00
40Single guardrail (type 2) (powder coated) (705-11.03)LF415$54.00$55.00$44.00
41Guardrail terminal (type 13) (powder coated) (705-11.08)EACH1$2,100.00$2,300.00$2,600.00
42Median attenuating trend terminal (matt) (705-16.01)EACH1$14,200$15,000$7,000.00
43Guardrail removed (706-01)LF775$2.00$5.00$3.00
44Reset single guardrail (type 2) (706-02.21)LF45$18.00$20.00$11.00
45Posts furnished (706-03.01)EACH400$115.00$140.00$77.00
46Median divider thrie rail (type 2) (706-06.02)LF20$135.00$150.00$50.00
47Radius rail (706-06.03)LF1,820$32.00$36.00$33.00
48Radius rail long post (6-9 FT) (706-06.05)LF635$33.00$39.00$39.00
49Radius rail long post (9-12 FT) (706-06.06)LF50$38.00$42.00$32.00
50Rounded end element (706-10.26)EACH65$100.00$150.00$175.00
51RE-align guardrail (706-10.54)LF20,000$4.00$5.50$4.00
52Buffer ends 88" (706-10.56)EACH2$100.00$100.00$105.00
53Hazard markers (706-10.71)EACH10$45.00$250.00$105.00
54Pull and reinstall guardarail post for verification (706-10.72)EACH8$60.00$200.00$10.00
55Concrete barrier wall repair (706-10.74)CY30$2,500.00$5,000.00$5,000.00
56Michigan and modified michigan end shoe (706-10.80)EACH11$77.00$250.00$60.00
57Guardrail reflectors (706-10.81)EACH5$18.50$20.00$3.00
58Concrete bridge end or pier protection repair (706-10.82)CY1$2,500.00$5,000.00$5,000.00
59Drill BR. par. wall for michigan end shoe (706-10.83)EACH6$285.00$300.00$1,700.00
60Lane closure (712-01.02)EACH800$1,000.00$1,000.00$1,200.00
61Truck mounted attenuator W/mssage board (712-08.20)DAY314$1,000.00$850.00$510.00
62Mobilization (717-01)LS1$140,000$150,000$520,000
63Mobilization (emergency call-out) (717-01.04)EACH85$1,000.00$1,500.00$1,500.00
TDOT contract CN261013: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TDOT's tabulation for this contract. TDOT Summary of Bids PDFs: every letting posted for February 2024 to October 2026, and nine lettings of 2018 to 2023 recovered from archived copies of the tn.gov files. Cost-plus-time bids, and bids that did not match their published total, are left out.

Every contract let that day: TDOT letting of March 20, 2026. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy