Massana, Inc.: TxDOT bid record

Massana, Inc. submitted 12 bids on Texas DOT contracts in the data, from 07 MAY 2020 to 07 JAN 2022, and was the low bidder on 5 of them (42%). When it was not low, its total sat a median +14% above the low bid.

Owner
Texas DOT
Low bid volume
$19,166,900
Latest bid
07 JAN 2022
Data through
19 NOV 2026
12Bids
5Low bids
42Win rate, percent
+14%Median gap to the low bid when not low, 7 bids

By year

YearBidsLow bidsWin rate
20209556%
2021100%
2022200%
Massana, Inc., TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
Waco District3267%
Dallas District200%
Bryan District200%
Amarillo District100%
Maintenance Division District11100%
Wichita Falls District11100%
San Angelo District11100%
Yoakum District100%
Massana, Inc., TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Riprap (mow strip)(4 in)432-7013CY119 (82%)$305.00$643.00
TMA (stationary)505-7001DAY128 (67%)$103.23$230.00
Cable barrier system (TL-4)543-6002LF115 (45%)$7.90$12.55
Biodegradable erosion control logs (remove)506-7046LF84 (50%)$1.25$1.40
Vegetative watering168-7001MG72 (29%)$40.00$29.97
Temporary sediment control fence (remove)506-7041LF62 (33%)$1.25$1.00
Cable barrier terminal section (TL-4)543-6020EACH111 (9%)$4,500.00$3,142.82
Temporary sediment control fence (install)506-7039LF61 (17%)$3.85$4.00
Massana, Inc., TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

Massana, Inc., TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
07 JAN 202201223210Dallas DistrictUS 287 Safety improvement projects from FM 813 to BUS 287R3 of 7$3,135,490+10%
06 JAN 202201223016Bryan DistrictUS 190 Install raised median from SH OSR to FM 28182 of 6$1,704,217+18%
08 JAN 202101213212Yoakum DistrictSH 71 Install median barrier from BASTROP C/L to 2.408 MI EAST OF FM 154, ETC.7 of 10$2,238,621+41%
06 AUG 202008203219Bryan DistrictSH 6 Install cable median barrier from FALLS COUNTY LINE to 1.9 MILES SOUTH OF FM 16443 of 5$5,311,929+18%
05 AUG 202008203023San Angelo DistrictIH 10 Median cable barrier from US 83 IN JUNCTION to KERR COUNTY LINE1 of 4$2,752,521Low, 8.0% under the second
05 AUG 202008203062Waco DistrictSH 6 Hazzard elimination and safety from SL 340 to FALLS COUNTY LINE1 of 6$6,830,728Low, 7.0% under the second
05 AUG 202008203064Waco DistrictSH 31 Install cable median barrier and upgrade mbgf from US 84 to HILL CO LN., ETC.1 of 6$3,044,240Low, 3.0% under the second
09 JUL 202007203216Waco DistrictIH 35W Roadway lane departure - cable median barriers from IH 35 E/W SPLIT to JOHNSON COUNTY LINE3 of 6$2,478,589+6.0%
09 JUL 202007203244Wichita Falls DistrictUS 81 Install median barrier from US 287 to WAGGONSELLER ROAD1 of 5$482,811Low, 0.0% under the second
08 JUL 202007203017Dallas DistrictVA Install cable barriers from VARIOUS LOCATIONS to ON SL 12 AND US 2872 of 8$4,807,383+14%
08 JUL 202007203022Maintenance Division DistrictUS 281 Install cable barrier from .75 MILES SOUTH OF FM 3066 to 10.825 MILES SOUTH OF FM 30661 of 5$6,056,600Low, 18% under the second
07 MAY 202005203009Amarillo DistrictVA Install cable median barrier from VARIOUS LOCATIONS to ON IH 402 of 5$3,974,224+1.0%
Massana, Inc.: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy