Vann/Elli, Inc.: TxDOT bid record
Vann/Elli, Inc. submitted 23 bids on Texas DOT contracts in the data, from 10 JAN 2020 to 05 JUN 2025, and was the low bidder on 1 of them (4%). When it was not low, its total sat a median +64% above the low bid.
- Owner
- Texas DOT
- Low bid volume
- $730,335
- Latest bid
- 05 JUN 2025
- Data through
- 19 NOV 2026
By year
| Year | Bids | Low bids | Win rate |
|---|---|---|---|
| 2020 | 16 | 1 | 6% |
| 2021 | 2 | 0 | 0% |
| 2022 | 2 | 0 | 0% |
| 2023 | 2 | 0 | 0% |
| 2025 | 1 | 0 | 0% |
By district
| District | Bids | Low bids | Win rate |
|---|---|---|---|
| Dallas District | 4 | 0 | 0% |
| Waco District | 4 | 0 | 0% |
| Fort Worth District | 4 | 0 | 0% |
| Wichita Falls District | 2 | 0 | 0% |
| San Angelo District | 2 | 0 | 0% |
| Bryan District | 2 | 1 | 50% |
| Amarillo District | 1 | 0 | 0% |
| Lufkin District | 1 | 0 | 0% |
| Austin District | 1 | 0 | 0% |
| Paris District | 1 | 0 | 0% |
| Yoakum District | 1 | 0 | 0% |
Pay items where it is most often lowest
| Pay item | Code | Unit | Lines bid | Lowest on the line | Its median price | All bidders' median |
|---|---|---|---|---|---|---|
| Guardrail end treatment (remove) | 544-7003 | EACH | 8 | 3 (38%) | $200.00 | $275.00 |
| Mobilization (callout) | 500-7002 | EACH | 5 | 3 (60%) | $500.00 | $688.00 |
| TMA (stationary) | 505-7001 | DAY | 23 | 2 (9%) | $300.00 | $230.00 |
| Remove metal beam guard fence | 542-7001 | LF | 10 | 2 (20%) | $3.00 | $3.00 |
| Biodegradable erosion control logs (remove) | 506-7046 | LF | 9 | 2 (22%) | $1.00 | $1.40 |
| Metal W-beam guard fence (steel post) | 540-7002 | LF | 6 | 2 (33%) | $26.23 | $33.00 |
| Barricades, signs and traffic handling | 502-7001 | MO | 17 | 1 (6%) | $9,000.00 | $5,000.00 |
| Cable barrier terminal section (TL-4) | 543-6020 | EACH | 11 | 1 (9%) | $2,900.00 | $3,142.82 |
| Guardrail end treatment (install) | 544-7001 | EACH | 9 | 1 (11%) | $3,200.00 | $3,245.00 |
| Remove terminal anchor section | 542-7002 | EACH | 9 | 1 (11%) | $200.00 | $240.31 |
| Portable changeable message sign | 503-7002 | EACH | 8 | 1 (13%) | $15,500 | $10,000 |
| Portable changeable message sign | 503-7001 | DAY | 8 | 1 (13%) | $200.00 | $100.00 |
A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.
Who it meets most
| Firm | Contracts in common | That firm ranked ahead |
|---|---|---|
| FNH Construction, LLC | 14 | 7 of 14 |
| SCR Civil Construction, LLC | 10 | 9 of 10 |
| Altus Construction LLC | 8 | 7 of 8 |
| Gratiot Construction, LTD. | 6 | 6 of 6 |
| Massana, Inc. | 6 | 6 of 6 |
| Cross Plus Construction, LLC | 6 | 6 of 6 |
| HJC Farms, Inc. | 4 | 3 of 4 |
| SJ&J Construction, LLC | 4 | 0 of 4 |
| Silver Creek Construction, Inc. | 3 | 3 of 3 |
| Dbi Services, LLC | 3 | 1 of 3 |
Latest bids
| Let | Contract | District | Project | Rank | Its bid | Against the low bid |
|---|---|---|---|---|---|---|
| 05 JUN 2025 | A00207748 | Fort Worth District | METAL BEAM GUARD FENCE REPAIR, IH0035W (Various Locations In to Johnson County) | 8 of 8 | $1,976,750 | +128% |
| 16 NOV 2023 | 11230201 | Fort Worth District | US0377 Tree trimming and brush removal from VARIOUS LOCATIONS IN to ERATH, HOOD AND SOMERVELL COUNTIES | 3 of 3 | $656,240 | +172% |
| 02 AUG 2023 | 08233022 | Fort Worth District | US 380 Hazard elimination & safety from .300 MI EAST OF SH 101 to BU 380F | 5 of 5 | $8,660,909 | +71% |
| 29 JUN 2022 | 06224420 | Fort Worth District | IH0035W Metal beam guard fence repair from VARIOUS LOCATIONS WITHIN to JOHNSON COUNTY | 4 of 4 | $3,817,451 | +112% |
| 07 APR 2022 | 04224212 | Dallas District | IH0045 Metal beam guard fence repair from VARIOUS ROADWAYS IN THE to ELLIS COUNTY MAINTENANCE SECTION | 3 of 4 | $1,187,175 | +117% |
| 04 FEB 2021 | 02213017 | Dallas District | US 380 Cable barrier installation from WISE COUNTY LINE to FM 156 | 8 of 10 | $2,079,518 | +28% |
| 08 JAN 2021 | 01213212 | Yoakum District | SH 71 Install median barrier from BASTROP C/L to 2.408 MI EAST OF FM 154, ETC. | 8 of 10 | $2,251,420 | +42% |
| 04 SEP 2020 | 09203223 | Paris District | IH 30 Remove/replace bridge rail from AT RILEY CREEK, LINDLEY CREEK, to AND ELM CREEK | 4 of 10 | $447,140 | +13% |
| 04 SEP 2020 | 09204205 | Bryan District | US0084 Metal beam guard fence repair from VARIOUS to VARIOUS | 1 of 3 | $730,335 | Low, 0.0% under the second |
| 04 SEP 2020 | 09204212 | Waco District | SH0006 Mbgf,bridge rail,cable barrier repr&inst from WACO DISTRICT - FALLS, HILL, LIMEST to AND MCLENNAN COUNTIES | 2 of 4 | $892,690 | +1.0% |
| 03 SEP 2020 | 09203027 | Austin District | SH 71 Safety improvement projects from 0.337 MILES WEST OF COLORADO DRIVE to FAYETTE COUNTY LINE | 4 of 10 | $650,637 | +24% |
| 06 AUG 2020 | 08203248 | Wichita Falls District | FM 51 Upgrade guardrail from FM 1630 to FM 922 | 5 of 8 | $1,466,999 | +23% |
| 05 AUG 2020 | 08203021 | Lufkin District | VA Install cable median barrier from VARIOUS LOCATIONS DISTRICT WIDE | 5 of 5 | $4,968,849 | +63% |
| 05 AUG 2020 | 08203023 | San Angelo District | IH 10 Median cable barrier from US 83 IN JUNCTION to KERR COUNTY LINE | 4 of 4 | $4,114,305 | +49% |
| 05 AUG 2020 | 08203026 | San Angelo District | VA Upgrade guard fence from VARIOUS ROADWAYS IN SJT DISTRICT | 7 of 7 | $3,928,038 | +146% |
| 05 AUG 2020 | 08203062 | Waco District | SH 6 Hazzard elimination and safety from SL 340 to FALLS COUNTY LINE | 6 of 6 | $11,651,482 | +71% |
| 05 AUG 2020 | 08203064 | Waco District | SH 31 Install cable median barrier and upgrade mbgf from US 84 to HILL CO LN., ETC. | 6 of 6 | $5,018,530 | +65% |
| 05 AUG 2020 | 08203065 | Waco District | IH 35 Upgrading mbgf to mash compliant standards. from COUNTY LINE RD to SH 81, ETC. | 6 of 6 | $9,460,462 | +79% |
| 05 AUG 2020 | 08203067 | Bryan District | SH 21 Replace terminal anchor sections on guardrail from IH 45 to SAN JACINTO CL | 3 of 3 | $3,140,635 | +55% |
| 09 JUL 2020 | 07203244 | Wichita Falls District | US 81 Install median barrier from US 287 to WAGGONSELLER ROAD | 3 of 5 | $530,372 | +10% |
| 08 JUL 2020 | 07203017 | Dallas District | VA Install cable barriers from VARIOUS LOCATIONS to ON SL 12 AND US 287 | 8 of 8 | $9,712,484 | +130% |
| 08 JUL 2020 | 07203029 | Dallas District | VA Construction of hazard elimination & safety on ml from VARIOUS LOCATIONS to ON IH20, IH30, IH35E, AND SL12 | 2 of 9 | $2,861,755 | +4.0% |
| 10 JAN 2020 | 01203205 | Amarillo District | IH 40 Install median barrier from POTTER COUNTY LINE to MILE MARKER 107 | 4 of 4 | $2,848,194 | +72% |
How this record was read
TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
- Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
- The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
- A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.
A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.