Nixon Engineering: TxDOT bid record

Nixon Engineering submitted 12 bids on Texas DOT contracts in the data, from 25 MAR 2020 to 05 MAY 2023, and was the low bidder on 3 of them (25%). When it was not low, its total sat a median +45% above the low bid.

Owner
Texas DOT
Low bid volume
$1,228,615
Latest bid
05 MAY 2023
Data through
19 NOV 2026
12Bids
3Low bids
25Win rate, percent
+45%Median gap to the low bid when not low, 9 bids

By year

YearBidsLow bidsWin rate
2020200%
2022600%
20234375%
Nixon Engineering, TxDOT: bids and low bids by year of letting

By district

DistrictBidsLow bidsWin rate
El Paso District2150%
Dallas District200%
Odessa District22100%
Austin District100%
Lufkin District100%
San Antonio District100%
Houston District100%
Tyler District100%
Waco District100%
Nixon Engineering, TxDOT: bids and low bids by district

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
TMA (stationary)505-7001DAY115 (45%)$400.00$230.00
Furnish additional arrow board7148-6021HR54 (80%)$10.00$22.50
Portable changeable message sign503-7001DAY103 (30%)$100.00$100.00
Mobilization (callout)500-7002EACH53 (60%)$100.00$688.00
1 LN closure 2 LN RD no shoulders7148-6001HR72 (29%)$150.00$100.00
Mobilization (emergency)500-7033EACH62 (33%)$1,500.00$1,000.00
Furnish additional flagger7148-6019HR62 (33%)$50.00$48.00
TMA (mobile operation)505-7002HR91 (11%)$130.00$78.00
1 LN closure 2 LN RD paved shoulders7148-6002HR61 (17%)$135.00$110.00
Nixon Engineering, TxDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
FC Traffic Control, Inc.61 of 6
Statewide Safety Systems66 of 6
Mijelum, L.L.C.31 of 3
Professional Traffic Control LLC22 of 2
Barricades Unlimited20 of 2
Apache Barricade & Sign11 of 1
Big Creek Construction, LTD.11 of 1
Angel Brothers Holdings Corp.10 of 1
Hunter Industries, LTD.10 of 1
Dan Williams Company10 of 1
Nixon Engineering, TxDOT: the firms on the same contracts most often

Latest bids

LetContractDistrictProjectRankIts bidAgainst the low bid
05 MAY 202305234211El Paso DistrictUS0090 Traffic control services from VARIOUS LOCATIONS to VARIOUS LOCATIONS1 of 2$410,000Low, 6.0% under the second
05 MAY 202305234219Odessa DistrictIH0010 Traffic control services from VARIOUS to VARIOUS1 of 3$414,290Low, 41% under the second
05 MAY 202305234220Odessa DistrictIH0020 Traffic control services from VARIOUS to VARIOUS1 of 2$404,325Low, 5.0% under the second
22 FEB 202302231825Dallas DistrictUS0075 Traffic control services from VARIOUS ROADWAYS IN THE COLLIN to COUNTY MAINTENANCE SECTION2 of 2$394,680+55%
03 NOV 202211224209Houston DistrictSL0008 Traffic control services from VARIOUS HWYS IN SOUTHEAST HARRIS CO to VARIOUS HWYS IN SOUTHEAST HARRIS CO5 of 7$743,960+48%
03 NOV 202211224213Tyler DistrictUS0080 Traffic control services from VARIOUS ROADWAYS IN to WOOD AND VAN ZANDT COUNTIES3 of 4$2,092,400+6.0%
03 NOV 202211224214Waco DistrictFM0056 Traffic control services from VARIOUS LOCATIONS to IN WACO DISTRICT2 of 3$3,373,600+18%
02 NOV 202211224009Dallas DistrictSH0031 Traffic control services from VARIOUS ROADWAYS IN THE to NAVARRO COUNTY MAINTENANCE SECTION3 of 4$774,320+19%
02 NOV 202211224012Lufkin DistrictUS0059 Traffic control services from SAN JACINTO/POLK MAINT SECTIONS to VARIOUS LOCATIONS3 of 4$969,450+88%
02 NOV 202211224015San Antonio DistrictIH0010 Traffic control services from VARIOUS LOCATIONS to VARIOUS LOCATIONS4 of 5$2,591,100+58%
05 NOV 202011203217Austin DistrictFM 2336 Hazard elimination & safety from US 290 to SH 952 of 8$4,222,903+6.0%
25 MAR 202003202407El Paso DistrictIH0010 Barricades, signs, traffic control from VARIOUS LOCATIONS to VARIOUS LOCATIONS3 of 3$347,800+45%
Nixon Engineering: latest TxDOT bids in the data

How this record was read

TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

  • Every bid counted here matched its published total to within one dollar; TxDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy