| 1 | Removing concrete (mowstrip) (104-7003) | SY | 1,427 | | $32.00 | $25.30 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 885 | | $54.00 | $53.40 |
| 3 | Removing concrete (curb) (104-7016) | LF | 165 | | $12.00 | $2.40 |
| 4 | Removing concrete (rail) (104-7036) | LF | 26 | | $100.00 | $22.50 |
| 5 | Remove (6") TRT/untrt base & asphalt pavement (105-7026) | SY | 865 | | $63.00 | $5.00 |
| 6 | Excavation (roadway) (110-7001) | CY | 651 | | $50.00 | $120.00 |
| 7 | Block sodding (162-7002) | SY | 1,745 | | $8.00 | $4.50 |
| 8 | Fertilizer (166-7001) | ACRE | 0.41 | | $2,900.00 | $750.00 |
| 9 | Vegetative watering (168-7001) | TGL | 49.20 | | $109.00 | $132.00 |
| 10 | Asphalt (AC-20-5TR or AC-20XP) (316-7067) | GAL | 231,855 | $4.40 | $3.80 | $3.50 |
| 11 | Aggregate (type-PB or PL, GR-4)(sac-B) (316-7245) | CY | 5,589 | $320.00 | $230.00 | $324.00 |
| 12 | Tom-C PG76-22 sac-A (347-7001) | TON | 40,951 | $193.00 | $222.50 | $189.00 |
| 13 | Tom-F PG76-22 sac-B (347-7007) | TON | 40,951 | $180.00 | $211.00 | $189.00 |
| 14 | Tack coat (347-7011) | GAL | 43,488 | $3.00 | $6.50 | $3.40 |
| 15 | Plane concrete pavement(0" to 1.5") (354-7065) | SY | 14,537 | $1.95 | $10.25 | $12.30 |
| 16 | Planing asphalt concrete pavement (2.5") (354-7082) | SY | 642,539 | $2.15 | $2.90 | $5.90 |
| 17 | Full - depth repair CRCP (13") (361-7008) | CY | 625 | $1,940.00 | $1,750.00 | $1,500.00 |
| 18 | Class C concrete (rail foundation) (420-7052) | CY | 793 | | $822.00 | $850.00 |
| 19 | Blast finish (427-7007) | SF | 387,106 | | $0.30 | $4.50 |
| 20 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 120 | | $76.00 | $65.00 |
| 21 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 1,144 | | $304.00 | $260.00 |
| 22 | Riprap (concrete)(4 in) (432-7001) | CY | 67 | | $1,318.00 | $730.00 |
| 23 | Riprap (mow strip)(4 in) (432-7013) | CY | 154 | | $1,377.00 | $750.00 |
| 24 | Cleaning and sealing existing joints (438-7001) | LF | 576 | $50.00 | $82.00 | $70.00 |
| 25 | Rail (type SSTR) (450-7024) | LF | 7,186 | | $130.00 | $115.00 |
| 26 | Retrofit rail (type SSTR) (451-7024) | LF | 330 | | $493.00 | $330.00 |
| 27 | Remove STR (barrier gate) (496-7043) | EACH | 8 | | $5,365.00 | $5,000.00 |
| 28 | Mobilization (500-7001) | LS | 1 | $3,500,877 | $2,100,000 | $4,700,000 |
| 29 | Barricades, signs and traffic handling (502-7001) | MO | 14 | $50,000 | $11,000 | $60,000 |
| 30 | Portable changeable message sign (503-7001) | DAY | 974 | $150.00 | $140.00 | $80.00 |
| 31 | TMA (stationary) (505-7001) | DAY | 1,184 | $300.00 | $280.00 | $258.00 |
| 32 | TMA (mobile operation) (505-7003) | DAY | 284 | $300.00 | $522.00 | $258.00 |
| 33 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 59,469 | | $113.25 | $100.00 |
| 34 | Portable concrete traffic barrier (des source)(single slope)(type 1) (512-7013) | LF | 1,320 | $14.00 | $66.00 | $23.00 |
| 35 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 60,900 | $8.00 | $4.75 | $6.00 |
| 36 | Portable concrete traffic barrier (stockpile)(single slope)(type 1) (512-7037) | LF | 1,320 | $12.50 | $66.00 | $10.00 |
| 37 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 61,269 | | $17.00 | $9.00 |
| 38 | Portable concrete traffic barrier (connection hardware) (512-7070) | EACH | 1,725 | $100.00 | $5.00 | $1.00 |
| 39 | Permanent CTB (tran SSCB to CTB) (mod) (514-7037) | LF | 1,800 | | $427.00 | $200.00 |
| 40 | Metal W-beam guard fence (timber post) (540-7001) | LF | 25 | | $37.00 | $46.00 |
| 41 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 1 | | $2,450.00 | $3,560.00 |
| 42 | Remove metal beam guard fence (542-7001) | LF | 3,233 | | $2.35 | $6.00 |
| 43 | Remove terminal anchor section (542-7002) | EACH | 3 | | $251.00 | $553.00 |
| 44 | Remove downstream anchor terminal (542-7003) | EACH | 18 | | $269.00 | $371.00 |
| 45 | RM metal beam guard fence trans (thrie-beam) (542-7004) | EACH | 17 | | $298.00 | $506.00 |
| 46 | Guardrail end treatment (install) (544-7001) | EACH | 1 | | $3,415.00 | $5,303.00 |
| 47 | Guardrail end treatment (remove) (544-7003) | EACH | 32 | | $380.00 | $506.00 |
| 48 | Crash cushion attenuator (stockpile) (545-7003) | EACH | 54 | $925.00 | $1,150.00 | $2,535.00 |
| 49 | Crash cushion attenuator (install)(L)(N)(TL3) (545-7006) | EACH | 21 | | $37,350 | $35,682 |
| 50 | Cca (install)(N)(TL3)(work zone) (545-7018) | EACH | 54 | $10,000 | $8,250.00 | $10,809 |
| 51 | Install delineator assembly (D-DW)SZ 1(WFLX)SRF (658-7047) | EACH | 591 | $60.00 | $103.00 | $110.00 |
| 52 | Remove delin & object marker assms (658-7078) | EACH | 591 | $35.00 | $21.00 | $21.40 |
| 53 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 86,609 | $0.40 | $0.50 | $0.42 |
| 54 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 413,772 | $0.40 | $0.45 | $0.39 |
| 55 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 45,418 | $0.85 | $0.91 | $0.78 |
| 56 | Work zone pavement marking non-removing (W)12"(lane drop) (662-7014) | LF | 18,738 | $1.20 | $3.33 | $2.85 |
| 57 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 21,934 | $1.30 | $3.33 | $2.85 |
| 58 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 55 | $135.00 | $99.31 | $85.00 |
| 59 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 55 | $150.00 | $134.36 | $115.00 |
| 60 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 110,852 | $0.40 | $0.46 | $0.39 |
| 61 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 10,600 | | $2.75 | $2.35 |
| 62 | Work zone pavement marking removing (W)6"(solid) (662-7068) | LF | 46,076 | | $1.29 | $1.10 |
| 63 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 27,730 | | $1.29 | $1.10 |
| 64 | Reflectorized pavement marking type I (W)6"(lane drop)(100MIL) (666-7012) | LF | 521 | $2.00 | $1.03 | $0.88 |
| 65 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 31,603 | $1.75 | $1.87 | $1.60 |
| 66 | Reflectorized pavement marking type I (W)12"(lane drop)(100MIL) (666-7027) | LF | 7,082 | $3.00 | $2.06 | $1.76 |
| 67 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 22,683 | $3.60 | $4.32 | $3.70 |
| 68 | RE PV marking type I(black)6"(shadow)(100MIL) (666-7138) | LF | 76,838 | $1.15 | $0.84 | $0.72 |
| 69 | Reflectorized pavement marking type II (W) 6" (broken) (666-7172) | LF | 76,838 | $0.35 | $0.49 | $0.42 |
| 70 | Reflectorized pavement marking type II (W) 6" (lane drop) (666-7174) | LF | 521 | $3.00 | $0.49 | $0.42 |
| 71 | Reflectorized pavement marking type II (W) 6" (solid) (666-7175) | LF | 166,212 | $0.21 | $0.46 | $0.39 |
| 72 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 31,603 | $0.70 | $0.91 | $0.78 |
| 73 | Reflectorized pavement marking type II (W) 12" (lane drop) (666-7181) | LF | 7,082 | $2.75 | $3.33 | $2.85 |
| 74 | Reflectorized pavement marking type II (W) 12" (solid) (666-7182) | LF | 22,683 | $1.30 | $3.33 | $2.85 |
| 75 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 92,090 | $0.35 | $0.46 | $0.39 |
| 76 | Reflectorized pavement marking type II (BLK)(6")(shadow) (666-7229) | LF | 76,838 | $0.52 | $0.49 | $0.42 |
| 77 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 76,838 | $0.83 | $0.81 | $0.69 |
| 78 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 166,212 | $0.50 | $0.78 | $0.67 |
| 79 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 92,090 | $1.15 | $0.78 | $0.67 |
| 80 | Prefabricated PM type C (W)(arrow) (668-7091) | EACH | 77 | $295.00 | $360.45 | $308.52 |
| 81 | Prefabricated PM type C (W)(double arrow) (668-7093) | EACH | 3 | $385.00 | $510.16 | $436.66 |
| 82 | Prefabricated PM type C (W)(word) (668-7103) | EACH | 97 | $350.00 | $486.05 | $416.02 |
| 83 | Prefabricated PM type C (W)(symbol) (668-7109) | EACH | 37 | $350.00 | $376.58 | $322.32 |
| 84 | Prefabricated PM type C (multi)(shield) (668-7135) | EACH | 67 | $2,900.00 | $2,917.43 | $2,497.09 |
| 85 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 7,216 | $5.00 | $6.72 | $5.75 |
| 86 | Eliminating existing PM & markers (6") (677-7002) | LF | 171,479 | $0.35 | $0.55 | $0.47 |
| 87 | Eliminating existing PM & markers (8") (677-7004) | LF | 9,292 | $0.70 | $0.98 | $0.84 |
| 88 | Eliminating existing PM & markers (12") (677-7006) | LF | 6,047 | $2.10 | $1.69 | $1.45 |
| 89 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 12 | $100.00 | $81.78 | $70.00 |
| 90 | Eliminating existing PM & markers (word) (677-7015) | EACH | 26 | $107.00 | $81.78 | $70.00 |
| 91 | Eliminating existing PM & markers (symbol) (677-7020) | EACH | 12 | $70.00 | $81.78 | $70.00 |
| 92 | Eliminating existing PM & markers (shield) (677-7022) | EACH | 11 | | $292.08 | $250.00 |
| 93 | Pavement surface preparation for marking (6") (678-7002) | LF | 412,499 | $0.07 | $0.02 | $0.02 |
| 94 | Pavement surface preparation for marking (8") (678-7004) | LF | 31,603 | $0.10 | $0.04 | $0.03 |
| 95 | Pavement surface preparation for marking (12") (678-7006) | LF | 29,765 | $0.20 | $0.05 | $0.04 |
| 96 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 77 | $10.00 | $5.84 | $5.00 |
| 97 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 3 | $15.00 | $5.84 | $5.00 |
| 98 | Pavement surface preparation for marking (word) (678-7016) | EACH | 97 | $15.00 | $5.84 | $5.00 |
| 99 | Pavement surface preparation for marking (symbol) (678-7021) | EACH | 37 | $2.50 | $5.84 | $5.00 |
| 100 | Pavement surface preparation for marking (shield) (678-7025) | EACH | 67 | $32.00 | $5.84 | $5.00 |
| 101 | Pavement surface preparation for marking (RPM) (678-7033) | EACH | 7,216 | $0.40 | $1.17 | $1.00 |
| 102 | Fiber reinforced polymer patching materials (721-7001) | LB | 129,434 | $3.00 | $3.50 | $3.00 |
| 103 | Debris removal (CNTR medians/mainlanes) (735-7003) | MI | 2 | $1,000.00 | $4,150.00 | $2,000.00 |
| 104 | Slotted drain cleaning (764-7021) | LF | 6,612 | | $9.00 | $10.00 |
| 105 | Bridge joint replacement (SEJ) (785-7011) | LF | 1,375 | | $1,460.00 | $1,250.00 |
| 106 | Replacing elastomeric bearing pads (787-7001) | EACH | 13 | | $17,500 | $15,000 |
| 107 | Concrete beam repair (788-7001) | EACH | 34 | | $2,700.00 | $2,300.00 |
| 108 | Pedestrian barrier (furn & install) (5010-7001) | LF | 760 | | $49.00 | $45.00 |
| 109 | Pedestrian barrier (remove & reinstall) (5010-7002) | LF | 21,714 | | $8.65 | $15.00 |
| 110 | Barrier gate (5034-7001) | EACH | 8 | | $47,000 | $25,000 |
| 111 | Cover (adjust) (6013-7001) | EACH | 26 | $2,000.00 | $2,700.00 | $1,000.00 |
| 112 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 12 | | $1,165.00 | $1,000.00 |