TxDOT contract A00139936 bid tabulation
Install/Upgrade Drainage Structure(S), SH 27 (At Irene Creek to .). Let by Texas DOT on April 3, 2025, Kerr, San Antonio District. 7 bids received; low bid $1,403,742 by Acee Construction LLC., -44% against the engineer's estimate of $2,512,371.
- Owner
- Texas DOT
- Letting
- 03 APR 2025
- Pay items
- 101
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Acee Construction LLC. | $1,403,742 | Low | -44% |
| 2 | MPB, Inc. | $1,730,872 | +23% | -31% |
| 3 | Dan Williams Company | $1,877,364 | +34% | -25% |
| 4 | Acme Bridge Company, Inc. | $2,185,879 | +56% | -13% |
| 5 | Hunter Industries, LTD. | $2,304,308 | +64% | -8.0% |
| 6 | STX Civil | $2,421,453 | +72% | -4.0% |
| 7 | Icos Management, LLC | $2,672,864 | +90% | +6.0% |
Engineer's estimate: $2,512,371.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Acee Construction LLC. | 2. MPB, Inc. | 3. Dan Williams Company | 4. Acme Bridge Company, Inc. | 5. Hunter Industries, LTD. | 6. STX Civil |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7001) | ACRE | 0.49 | $10,000 | $5,500.00 | $6,500.00 | $200,000 | $20,618 | $21,100 | $20,000 |
| 2 | Removing concrete (riprap) (104-7006) | SY | 320 | $12.00 | $12.50 | $10.00 | $20.00 | $36.90 | $42.00 | $30.00 |
| 3 | Removing stab base and asphalt pavement(0"-16") (105-7129) | SY | 79 | $10.00 | $20.00 | $55.00 | $50.00 | $106.00 | $38.50 | $25.00 |
| 4 | Excavation (roadway) (110-7001) | CY | 27 | $13.74 | $50.00 | $85.00 | $50.00 | $134.00 | $77.00 | $40.00 |
| 5 | Excavation (channel) (110-7002) | CY | 783 | $12.00 | $25.00 | $18.00 | $40.00 | $46.90 | $77.00 | $40.00 |
| 6 | Embankment (final)(OC)(type C) (132-7005) | CY | 28 | $30.00 | $55.00 | $165.00 | $55.00 | $238.00 | $77.00 | $50.00 |
| 7 | Blading (150-7002) | HR | 10 | $65.85 | $180.00 | $65.00 | $43.40 | $144.00 | $100.00 | |
| 8 | Straw/hay mulch seed(permanent_rural_clay) (164-7026) | SY | 3,096 | $1.50 | $1.00 | $5.00 | $1.40 | $1.36 | $6.00 | |
| 9 | Vegetative watering (168-7001) | TGL | 49 | $35.70 | $300.00 | $15.00 | $143.00 | $31.50 | $50.00 | |
| 10 | Soil ret BLKT(chan_temporary_4 PSF) (169-7030) | SY | 526 | $4.75 | $5.25 | $8.00 | $4.80 | $4.64 | $10.00 | |
| 11 | Asphalt (AC-15P or CRS-2P) (316-7078) | GAL | 1,070 | $7.50 | $6.30 | $22.00 | $9.40 | $9.20 | $25.00 | |
| 12 | Aggregate (type-PB, GR-4)(sac-B) (316-7211) | CY | 31 | $241.00 | $735.00 | $450.00 | $652.00 | $553.55 | $900.00 | |
| 13 | D-GR HMA type-B PG64-22 (exempt) (341-7003) | TON | 195 | $133.00 | $205.00 | $315.00 | $210.00 | $338.00 | $220.00 | $200.00 |
| 14 | D-GR HMA type-C sac-B PG70-22 (exempt) (341-7037) | TON | 112 | $190.79 | $205.00 | $331.00 | $235.00 | $355.00 | $225.50 | $400.00 |
| 15 | Planing asphalt concrete pavement(0" to 2") (354-7032) | SY | 973 | $2.60 | $4.50 | $10.50 | $14.00 | $11.30 | $9.04 | $25.00 |
| 16 | Cut & restore asphalt paving (400-7008) | SY | 150 | $107.50 | $140.00 | $185.00 | $128.00 | $239.66 | $350.00 | |
| 17 | Cem stabil BKFL (400-7010) | CY | 154 | $161.76 | $142.50 | $95.00 | $250.00 | $390.00 | $324.00 | $250.00 |
| 18 | Flowable backfill (401-7001) | CY | 40 | $250.00 | $145.00 | $150.00 | $265.00 | $225.00 | $324.00 | $300.00 |
| 19 | Trench excavation protection (402-7001) | LF | 220 | $5.00 | $8.50 | $17.00 | $1.00 | $156.00 | $34.56 | $20.00 |
| 20 | Temporary special shoring (403-7001) | SF | 1,430 | $25.00 | $20.00 | $106.00 | $25.00 | $56.40 | $70.20 | $75.00 |
| 21 | Class C concrete (cap) (420-7022) | CY | 1 | $1,075.00 | $850.00 | $650.00 | $1,200.00 | $4,270.00 | $1,943.99 | $5,000.00 |
| 22 | Riprap (concrete)(4 in) (432-7001) | CY | 21 | $350.00 | $495.00 | $645.00 | $625.00 | $1,060.00 | $674.99 | $900.00 |
| 23 | Riprap (concrete)(5 in) (432-7002) | CY | 105.10 | $479.00 | $505.00 | $460.00 | $600.00 | $932.00 | $669.59 | $1,000.00 |
| 24 | Rail (type C1W) (450-7030) | LF | 91.72 | $227.24 | $532.00 | $550.00 | $400.00 | $741.00 | $430.92 | $600.00 |
| 25 | Gabion mattresses (galvanized)(9 in) (459-7006) | SY | 100 | $120.00 | $168.00 | $200.00 | $121.00 | $136.00 | $100.00 | |
| 26 | Gabion (1.5' X 3')(galvanized) (459-7014) | CY | 18 | $120.00 | $265.00 | $300.00 | $480.00 | $650.00 | $200.00 | |
| 27 | Concrete box culvert (6 FT X 5 FT) (462-7013) | LF | 73 | $654.59 | $785.00 | $1,650.00 | $1,000.00 | $1,160.00 | $944.45 | $1,100.00 |
| 28 | Concrete box culvert (7 FT X 3 FT) (462-7015) | LF | 210 | $615.00 | $450.00 | $900.00 | $1,170.00 | $1,037.49 | $1,300.00 | |
| 29 | Concrete box culvert (12 FT X 5 FT) (462-7048) | LF | 73 | $1,586.98 | $3,250.00 | $2,700.00 | $2,000.00 | $2,660.00 | $3,197.86 | $2,500.00 |
| 30 | RC pipe (CL III)(36 in) (464-7009) | LF | 82 | $188.74 | $151.50 | $165.00 | $165.00 | $232.00 | $118.80 | $300.00 |
| 31 | Wingwall (PW - 1) (HW=9 FT) (466-7179) | EACH | 2 | $45,872 | $38,500 | $40,000 | $50,000 | $54,300 | $38,121 | $60,000 |
| 32 | Set (type I)(S= 7 FT)(HW= 4 FT)(4:1)(C) (467-7154) | EACH | 10 | $9,750.00 | $5,425.00 | $7,500.00 | $8,340.00 | $11,312 | $20,000 | |
| 33 | Set (type II) (36 in) (RCP) (6: 1) (P) (467-7368) | EACH | 2 | $4,963.33 | $4,499.95 | $5,200.00 | $6,000.00 | $9,130.00 | $6,543.67 | $10,000 |
| 34 | Removing structure (manhole) (496-7003) | EACH | 1 | $1,360.43 | $500.00 | $500.00 | $1,800.00 | $1,050.00 | $782.19 | $1,000.00 |
| 35 | Removing structure (set) (496-7004) | EACH | 2 | $607.89 | $350.00 | $250.00 | $650.00 | $409.00 | $669.59 | $250.00 |
| 36 | Removing structure (wingwall) (496-7005) | EACH | 2 | $1,838.72 | $330.75 | $500.00 | $1,850.00 | $843.00 | $1,564.39 | $2,500.00 |
| 37 | Removing structure (pipe) (496-7007) | LF | 643 | $26.00 | $21.80 | $9.25 | $25.00 | $17.90 | $59.40 | $20.00 |
| 38 | Remove STR (rail) (496-7017) | LF | 60 | $15.00 | $15.20 | $5.75 | $12.00 | $22.30 | $12.50 | $50.00 |
| 39 | Mobilization (500-7001) | LS | 1 | $1,256,475 | $137,500 | $150,000 | $180,000 | $195,000 | $230,367 | $220,000 |
| 40 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $5,000.00 | $5,500.00 | $5,000.00 | $20,000 | $6,470.00 | $20,270 | $10,000 |
| 41 | Portable changeable message sign (503-7001) | DAY | 70 | $89.01 | $80.00 | $75.00 | $150.00 | $358.00 | $169.17 | $60.00 |
| 42 | Rock filter dams (install) (type 2) (506-7002) | LF | 228 | $35.00 | $47.90 | $47.25 | $45.00 | $55.60 | $53.79 | $70.00 |
| 43 | Rock filter dams (remove) (506-7011) | LF | 228 | $14.83 | $5.30 | $5.25 | $5.00 | $12.40 | $12.00 | $10.00 |
| 44 | Construction exits (install) (type 1) (506-7020) | SY | 314 | $25.00 | $29.80 | $29.50 | $28.00 | $31.30 | $30.30 | $60.00 |
| 45 | Construction exits (remove) (506-7024) | SY | 314 | $7.97 | $2.65 | $2.65 | $2.50 | $10.00 | $9.70 | $22.00 |
| 46 | Temporary sediment control fence (install) (506-7039) | LF | 920 | $4.75 | $4.75 | $4.45 | $5.10 | $4.90 | $7.00 | |
| 47 | Temporary sediment control fence (remove) (506-7041) | LF | 920 | $0.95 | $1.00 | $1.00 | $1.70 | $1.65 | $2.50 | |
| 48 | Constructing detours (508-7001) | SY | 392 | $56.60 | $205.00 | $100.00 | $166.00 | $253.00 | $200.00 | |
| 49 | One-way traffic control (port traffic signal) (510-7003) | MO | 3 | $5,000.00 | $4,850.00 | $3,500.00 | $5,200.00 | $11,588 | $7,500.00 | |
| 50 | Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001) | LF | 210 | $26.50 | $140.00 | $45.00 | $152.00 | $115.00 | $160.00 | |
| 51 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 360 | $200.00 | $26.80 | $110.00 | $30.00 | $40.30 | $75.00 | $100.00 |
| 52 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 80 | $140.00 | $25.05 | $105.00 | $30.00 | $53.40 | $85.00 | $100.00 |
| 53 | Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025) | LF | 210 | $10.00 | $40.00 | $15.00 | $17.80 | $70.00 | $30.00 | |
| 54 | Portable concrete traffic barrier (move)(low prof)(type 1) (512-7033) | LF | 220 | $10.00 | $10.00 | $28.00 | $15.00 | $13.80 | $80.00 | $30.00 |
| 55 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 40 | $20.00 | $10.00 | $40.00 | $15.00 | $28.10 | $125.00 | $30.00 |
| 56 | Portable concrete traffic barrier (remove)(single slope)(type 1) (512-7049) | LF | 210 | $12.50 | $62.00 | $35.00 | $48.80 | $95.00 | $105.00 | |
| 57 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 360 | $30.00 | $12.50 | $31.00 | $25.00 | $30.50 | $55.00 | $30.00 |
| 58 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 80 | $23.92 | $12.50 | $20.00 | $25.00 | $51.30 | $65.00 | $30.00 |
| 59 | Concrete curb (type I) (529-7001) | LF | 179 | $20.00 | $12.15 | $41.00 | $30.00 | $45.70 | $34.56 | $100.00 |
| 60 | Driveways (concrete) (530-7006) | SY | 67 | $101.21 | $99.65 | $157.00 | $110.00 | $205.00 | $128.52 | $150.00 |
| 61 | Driveways (ACP) (530-7010) | SY | 12 | $50.43 | $325.80 | $350.00 | $165.00 | $372.00 | $101.20 | $110.00 |
| 62 | Concrete sidewalks (4") (531-7001) | SY | 101 | $70.14 | $62.50 | $130.00 | $85.00 | $143.00 | $97.20 | $100.00 |
| 63 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 2 | $750.00 | $1,500.00 | $2,000.00 | $2,900.00 | $875.00 | $1,500.00 | |
| 64 | Crash cushion attenuator (remove) (545-7004) | EACH | 2 | $650.00 | $650.00 | $2,000.00 | $1,010.00 | $800.00 | $1,000.00 | |
| 65 | Crash cushion attenuator (install)(R)(N)(TL2) (545-7009) | EACH | 1 | $20,233 | $20,000 | $30,000 | $30,000 | $30,900 | $25,750 | $20,000 |
| 66 | Crash cushion attenuator (install)(S)(N)(TL2) (545-7013) | EACH | 2 | $6,750.00 | $8,750.00 | $8,500.00 | $11,100 | $7,700.00 | $9,000.00 | |
| 67 | Install object marker assembly (OM-2Z)(WFLX)GND(BI) (658-7059) | EACH | 2 | $182.90 | $100.00 | $200.00 | $84.60 | $97.58 | $100.00 | |
| 68 | Work zone pavement marking removing (W)4"(DOT) (662-7062) | LF | 144 | $1.66 | $3.70 | $3.68 | $3.50 | $2.55 | $2.40 | $4.50 |
| 69 | Work zone pavement marking removing (W)4"(solid) (662-7064) | LF | 4,424 | $0.50 | $2.05 | $2.05 | $1.95 | $2.55 | $2.40 | $2.50 |
| 70 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 24 | $15.75 | $15.75 | $15.00 | $11.30 | $10.65 | $18.00 | |
| 71 | Work zone pavement marking removing (Y)4"(solid) (662-7097) | LF | 7,860 | $0.46 | $2.05 | $2.05 | $1.95 | $2.55 | $2.40 | $2.50 |
| 72 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 24 | $1.64 | $3.55 | $5.00 | $2.26 | $2.20 | $1.69 | $2.50 |
| 73 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 40 | $1.38 | $2.75 | $5.00 | $2.26 | $2.20 | $1.69 | $2.50 |
| 74 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 28 | $3.25 | $5.00 | $2.26 | $2.20 | $1.69 | $3.00 | |
| 75 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 237 | $1.00 | $2.15 | $2.10 | $2.00 | $2.80 | $2.66 | $2.50 |
| 76 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 205 | $8.90 | $13.15 | $13.13 | $12.50 | $11.30 | $10.65 | $15.00 |
| 77 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $186.09 | $262.50 | $262.50 | $250.00 | $225.00 | $213.03 | $303.00 |
| 78 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 2 | $232.22 | $288.75 | $288.75 | $275.00 | $254.00 | $239.66 | $333.00 |
| 79 | Pavement sler 6" (666-7347) | LF | 9,134 | $0.32 | $1.00 | $1.00 | $1.00 | $0.56 | $0.53 | $1.50 |
| 80 | Pavement sler 8" (666-7348) | LF | 237 | $0.43 | $1.60 | $1.58 | $1.50 | $0.85 | $0.80 | $2.00 |
| 81 | Pavement sler 24" (666-7352) | LF | 205 | $1.82 | $5.80 | $5.78 | $5.50 | $3.40 | $3.20 | $7.00 |
| 82 | Pavement sler (arrow) (666-7353) | EACH | 2 | $51.68 | $105.00 | $105.00 | $100.00 | $113.00 | $106.52 | $121.00 |
| 83 | Pavement sler (word) (666-7354) | EACH | 2 | $45.71 | $105.00 | $105.00 | $100.00 | $113.00 | $106.52 | $121.00 |
| 84 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 970 | $0.60 | $1.60 | $1.58 | $1.50 | $1.40 | $1.33 | $2.00 |
| 85 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 2,200 | $1.30 | $1.32 | $1.25 | $1.40 | $1.33 | $1.50 | |
| 86 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 1,049 | $0.48 | $1.60 | $1.16 | $1.50 | $1.40 | $1.33 | $2.00 |
| 87 | Reflectorized pavement marking type I (Y)6"(solid)(060MIL) (666-7421) | LF | 3,815 | $0.36 | $1.15 | $1.16 | $1.10 | $1.30 | $1.22 | $1.50 |
| 88 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 1,100 | $1.30 | $1.32 | $1.25 | $1.40 | $1.33 | $1.50 | |
| 89 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 28 | $10.50 | $10.50 | $10.00 | $5.60 | $5.33 | $12.00 | |
| 90 | Eliminating existing PM & markers (4") (677-7001) | LF | 5,074 | $0.75 | $1.60 | $1.58 | $1.50 | $1.15 | $1.07 | $2.00 |
| 91 | Underseal course (3006-7001) | GAL | 195 | $4.38 | $4.50 | $14.70 | $25.00 | $15.80 | $5.75 | $15.00 |
| 92 | Hydrostatic pressure test (7044-7001) | EACH | 1 | $2,500.00 | $1,500.00 | $1,000.00 | $6,000.00 | $5,000.00 | $3,500.00 | $8,000.00 |
| 93 | Remove 8" water line (7044-7002) | LF | 100 | $12.00 | $15.00 | $25.00 | $25.00 | $33.80 | $25.00 | $35.00 |
| 94 | Tie in (complete)(8") (7044-7003) | EACH | 2 | $2,200.00 | $2,500.00 | $500.00 | $4,000.00 | $5,000.00 | $3,500.00 | $5,000.00 |
| 95 | Pipe WTR main (PVC/C-900) (8IN.) (7044-7004) | LF | 56 | $95.00 | $80.00 | $100.00 | $325.00 | $500.00 | $125.00 | $120.00 |
| 96 | Ductile iron fittings (7044-7005) | TON | 1.80 | $6,500.00 | $2,500.00 | $1,000.00 | $7,500.00 | $15,000 | $8,500.00 | $9,000.00 |
| 97 | Carrier pipe 8" (open cut trench) (8") (7044-7006) | LF | 44 | $115.00 | $85.00 | $250.00 | $185.00 | $300.00 | $100.00 | $130.00 |
| 98 | Temporary blow-off complete (2") (7044-7007) | EACH | 2 | $1,800.00 | $2,850.00 | $1,000.00 | $5,000.00 | $1,000.00 | $3,750.00 | $5,250.00 |
| 99 | Gate valve & box (complete) (8") (7044-7008) | EACH | 2 | $6,500.00 | $2,950.00 | $2,250.00 | $6,500.00 | $5,000.00 | $27,500 | $6,200.00 |
| 100 | 24" steel casing (7044-7009) | LF | 44 | $155.00 | $200.00 | $100.00 | $325.00 | $500.00 | $450.00 | $400.00 |
| 101 | Trench excavation protection (7044-7010) | LF | 100 | $5.00 | $8.50 | $60.00 | $1.00 | $30.00 | $15.00 | $20.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.