TxDOT contract A00182264 bid tabulation
Surfacing/Roadway Restoration, SH 171 (SH 22 to FM 308). Let by Texas DOT on January 7, 2025, Hill, Waco District. 5 bids received; low bid $8,760,907 by Big Creek Construction, LTD., -6.2% against the engineer's estimate of $9,344,627.
- Owner
- Texas DOT
- Letting
- 07 JAN 2025
- Pay items
- 40
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Big Creek Construction, LTD. | $8,760,907 | Low | -6.0% |
| 2 | Texas Materials Group, Inc. | $9,849,158 | +12% | +5.0% |
| 3 | Knife River Corporation - South | $9,933,550 | +13% | +6.0% |
| 4 | CK Newberry, LLC | $10,892,840 | +24% | +17% |
| 5 | FNH Construction, LLC | $15,747,495 | +80% | +69% |
Engineer's estimate: $9,344,627.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Big Creek Construction, LTD. | 2. Texas Materials Group, Inc. | 3. Knife River Corporation - South | 4. CK Newberry, LLC | 5. FNH Construction, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 960 | $14.00 | $20.00 | $12.50 | $12.50 | $20.00 | $100.00 |
| 2 | Embankment (final)(OC)(type B) (132-7003) | CY | 236 | $41.81 | $75.00 | $100.00 | $75.00 | $80.00 | $100.00 |
| 3 | Backfill (type B) (134-7002) | STA | 376 | $250.00 | $250.00 | $240.00 | $268.00 | $225.00 | $250.00 |
| 4 | Hydro mulch seed (permanent_rural_clay) (164-7018) | SY | 712 | $1.00 | $4.00 | $2.50 | $2.75 | $4.00 | $10.00 |
| 5 | Vegetative watering (168-7001) | TGL | 5.80 | $35.00 | $150.00 | $283.00 | $200.00 | $220.00 | $1,000.00 |
| 6 | SP mixes SP-B PG64-22 (344-7001) | TON | 39,912 | $85.00 | $90.00 | $103.60 | $97.50 | $100.00 | $155.00 |
| 7 | SP mixes SP-C sac-A PG70-22 (344-7020) | TON | 31,927 | $110.00 | $100.00 | $121.50 | $118.45 | $120.00 | $175.00 |
| 8 | Tack coat (344-7077) | GAL | 58,924 | $2.33 | $3.50 | $2.90 | $2.95 | $5.00 | $5.00 |
| 9 | Flexible pavement structure repair(8") (351-7007) | SY | 528 | $65.50 | $70.00 | $94.00 | $125.00 | $140.00 | $80.00 |
| 10 | Planing asphalt concrete pavement (2" to 4 1/2") (354-7081) | SY | 295,261 | $3.00 | $2.35 | $2.00 | $1.95 | $2.00 | $3.50 |
| 11 | Flowable backfill (401-7001) | CY | 80 | $325.00 | $360.00 | $700.00 | $350.00 | $400.00 | $350.00 |
| 12 | Riprap (mow strip)(4 in) (432-7013) | CY | 76.30 | $650.00 | $700.00 | $780.00 | $1,050.00 | $700.00 | $550.00 |
| 13 | Mobilization (500-7001) | LS | 1 | $608,773 | $200,000 | $172,500 | $385,000 | $1,000,000 | $1,500,000 |
| 14 | Barricades, signs and traffic handling (502-7001) | MO | 8 | $5,000.00 | $5,000.00 | $1,700.00 | $18,500 | $25,000 | $8,500.00 |
| 15 | Portable changeable message sign (503-7001) | DAY | 180 | $76.10 | $125.00 | $25.00 | $110.00 | $100.00 | $150.00 |
| 16 | Portable changeable message sign (503-7002) | EACH | 2 | $9,762.50 | $10,000 | $2,165.00 | $15,500 | $12,000 | $20,000 |
| 17 | TMA (stationary) (505-7001) | DAY | 180 | $235.00 | $370.00 | $100.00 | $200.00 | $350.00 | $250.00 |
| 18 | TMA (mobile operation) (505-7002) | HR | 360 | $20.00 | $75.00 | $20.00 | $25.00 | $100.00 | $85.00 |
| 19 | Intersections (ACP) (530-7002) | SY | 5,015 | $41.00 | $30.00 | $60.00 | $64.00 | $50.00 | $45.00 |
| 20 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 128,539 | $0.20 | $0.20 | $0.23 | $0.16 | $0.35 | $0.30 |
| 21 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 64,160 | $0.20 | $0.20 | $0.35 | $0.16 | $0.23 | $0.30 |
| 22 | Metal W-beam guard fence (steel post) (540-7002) | LF | 587.50 | $29.75 | $40.00 | $28.00 | $30.00 | $30.00 | $35.00 |
| 23 | Short radius (28") (540-7013) | LF | 21.25 | $50.00 | $100.00 | $33.00 | $36.00 | $150.00 | $200.00 |
| 24 | Downstream anchor terminal section (540-7015) | EACH | 1 | $1,500.00 | $2,000.00 | $1,250.00 | $1,350.00 | $1,200.00 | $1,850.00 |
| 25 | Remove metal beam guard fence (542-7001) | LF | 587.50 | $1.75 | $6.00 | $2.50 | $2.75 | $3.00 | $3.00 |
| 26 | Remove terminal anchor section (542-7002) | EACH | 1 | $230.00 | $500.00 | $250.00 | $275.00 | $230.00 | $500.00 |
| 27 | Guardrail end treatment (install) (544-7001) | EACH | 9 | $3,000.00 | $3,200.00 | $2,800.00 | $3,000.00 | $3,150.00 | $3,250.00 |
| 28 | Guardrail end treatment (remove) (544-7003) | EACH | 9 | $500.00 | $500.00 | $250.00 | $275.00 | $470.00 | $1,500.00 |
| 29 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 11 | $45.00 | $60.00 | $35.00 | $40.00 | $44.50 | $100.00 |
| 30 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 13,870 | $0.29 | $0.10 | $0.05 | $0.06 | $0.30 | $0.50 |
| 31 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 131,860 | $0.23 | $0.22 | $0.18 | $0.19 | $0.20 | $0.50 |
| 32 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 29,620 | $0.28 | $0.40 | $0.33 | $0.35 | $0.20 | $0.50 |
| 33 | Work zone pavement marking removing (W)24"(solid) (662-7077) | LF | 140 | $12.00 | $5.00 | $4.00 | $4.30 | $10.00 | $20.00 |
| 34 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 747 | $0.96 | $1.50 | $0.92 | $2.50 | $0.80 | $6.00 |
| 35 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 220 | $1.50 | $1.80 | $1.65 | $1.77 | $2.00 | $6.00 |
| 36 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 140 | $7.50 | $15.00 | $12.00 | $12.90 | $8.00 | $20.00 |
| 37 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 131,860 | $0.60 | $0.80 | $0.65 | $0.70 | $0.80 | $0.75 |
| 38 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 29,620 | $0.60 | $0.60 | $0.54 | $0.58 | $0.85 | $0.75 |
| 39 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 13,870 | $0.60 | $0.75 | $0.68 | $0.73 | $0.85 | $0.75 |
| 40 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,617 | $5.00 | $7.00 | $6.00 | $6.45 | $5.00 | $6.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.