TxDOT contract A00184547 bid tabulation
Hazard Elimination & Safety, FM 1806 (0.15 mi W of Hill Top Rd to SH 59). Let by Texas DOT on June 5, 2025, Montague, Wichita Falls District. 5 bids received; low bid $6,384,868 by Foutsco Paving Company, LLC, -3.4% against the engineer's estimate of $6,607,393.
- Owner
- Texas DOT
- Letting
- 05 JUN 2025
- Pay items
- 95
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Foutsco Paving Company, LLC | $6,384,868 | Low | -3.0% |
| 2 | Eurovia Atlantic Coast LLC | $6,709,332 | +5.0% | +2.0% |
| 3 | Jagoe-Public Company | $6,746,295 | +6.0% | +2.0% |
| 4 | A. L. Helmcamp, Inc. | $6,752,657 | +6.0% | +2.0% |
| 5 | Austin Bridge & Road Services, LP | $7,785,881 | +22% | +18% |
Engineer's estimate: $6,607,393.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Foutsco Paving Company, LLC | 2. Eurovia Atlantic Coast LLC | 3. Jagoe-Public Company | 4. A. L. Helmcamp, Inc. | 5. Austin Bridge & Road Services, LP |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 7 | $3,350.00 | $500.00 | $15,000 | $2,000.00 | $4,500.00 | $3,000.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 222 | $15.00 | $25.00 | $37.00 | $14.00 | $45.00 | $43.16 |
| 3 | Excavation (roadway) (110-7001) | CY | 5,665 | $22.00 | $8.00 | $34.00 | $50.00 | $36.00 | $30.00 |
| 4 | Excavation (channel) (110-7002) | CY | 30 | $35.00 | $75.00 | $65.00 | $36.00 | $100.00 | $121.64 |
| 5 | Embankment (final)(OC)(type B) (132-7003) | CY | 12,008 | $28.00 | $15.00 | $41.00 | $28.00 | $43.00 | $31.60 |
| 6 | Blading (150-7002) | HR | 4 | $125.00 | $200.00 | $25.00 | $250.00 | $261.58 | |
| 7 | Broadcast seed (temporary_warm) (164-7005) | SY | 42,131.50 | $0.30 | $0.06 | $0.10 | $0.05 | $0.10 | $0.15 |
| 8 | Broadcast seed (temporary_cool) (164-7006) | SY | 42,131.50 | $0.30 | $0.06 | $0.16 | $0.05 | $0.16 | $0.15 |
| 9 | Drill seed (temporary_warm) (164-7013) | SY | 84,263 | $0.60 | $0.06 | $0.10 | $0.05 | $0.10 | $0.15 |
| 10 | Drill seed (temporary_cool) (164-7014) | SY | 84,263 | $0.60 | $0.06 | $0.16 | $0.05 | $0.16 | $0.15 |
| 11 | Vegetative watering (168-7001) | TGL | 343 | $35.00 | $1.00 | $77.00 | $75.00 | $36.00 | $66.00 |
| 12 | Cement (275-7001) | TON | 552 | $274.00 | $225.00 | $250.00 | $325.00 | $240.00 | $224.83 |
| 13 | Cement TRT (existing material)(8") (275-7003) | SY | 37,918 | $10.00 | $4.00 | $3.90 | $3.75 | $4.40 | $10.00 |
| 14 | Prime coat (MC-30) (310-7004) | GAL | 9,478 | $7.00 | $4.00 | $6.75 | $1.00 | $9.00 | $5.39 |
| 15 | D-GR HMA type-B PG64-22 (341-7001) | TON | 5,828 | $105.00 | $140.00 | $110.00 | $110.00 | $113.00 | $147.00 |
| 16 | D-GR HMA type-C sac-B PG70-22 (341-7024) | TON | 13,329 | $115.00 | $135.50 | $118.00 | $112.00 | $116.00 | $144.17 |
| 17 | D-GR HMA type D PG70-28 (level-UP) (341-7055) | TON | 1,035 | $130.00 | $140.00 | $134.00 | $130.00 | $155.00 | $207.00 |
| 18 | Tack coat (341-7082) | GAL | 4,709 | $5.00 | $6.00 | $3.00 | $3.00 | $6.50 | $4.60 |
| 19 | Flexible pavement structure repair(4") (351-7003) | SY | 4,675 | $40.00 | $36.00 | $33.00 | $36.00 | $49.00 | $50.00 |
| 20 | Cut & restoring pavement (400-7006) | SY | 95 | $160.00 | $45.00 | $85.00 | $90.00 | $50.00 | $250.00 |
| 21 | Flowable backfill (401-7001) | CY | 93 | $350.00 | $225.00 | $225.00 | $470.00 | $240.00 | $350.00 |
| 22 | Trench excavation protection (402-7001) | LF | 140 | $15.00 | $15.00 | $15.00 | $21.00 | $16.00 | $10.00 |
| 23 | Temporary special shoring (403-7001) | SF | 1,000 | $25.00 | $45.00 | $45.00 | $18.00 | $48.00 | $50.00 |
| 24 | Riprap (concrete)(5 in) (432-7002) | CY | 8 | $600.00 | $735.00 | $1,100.00 | $640.00 | $950.00 | |
| 25 | Riprap (mow strip)(4 in) (432-7013) | CY | 128 | $650.00 | $720.00 | $1,000.00 | $690.00 | $950.00 | |
| 26 | Riprap (stone common)(dry)(18 in) (432-7033) | CY | 115 | $150.00 | $285.00 | $480.00 | $300.00 | $300.00 | $285.00 |
| 27 | Miscellaneous non-bridge (nbis) (442-7017) | LB | 56 | $6.00 | $10.00 | $275.00 | $90.00 | $53.00 | $300.00 |
| 28 | CMP (gal steel 18 in) (460-7003) | LF | 1,434 | $80.00 | $80.00 | $80.00 | $80.00 | $85.00 | $60.00 |
| 29 | Concrete box culvert (4 FT X 3 FT) (462-7004) | LF | 56 | $550.00 | $400.00 | $400.00 | $380.00 | $430.00 | $750.00 |
| 30 | Concrete box culvert (5 FT X 2 FT)(extend) (462-7061) | LF | 48 | $775.00 | $775.00 | $320.00 | $820.00 | $700.00 | |
| 31 | Concrete box culvert (5 FT X 4 FT)(extend) (462-7063) | LF | 7 | $950.00 | $950.00 | $900.00 | $1,000.00 | $850.00 | |
| 32 | Concrete box culvert (6 FT X 2 FT)(extend) (462-7065) | LF | 25 | $880.00 | $880.00 | $700.00 | $930.00 | $825.00 | |
| 33 | Concrete box culvert (8 FT X 5 FT)(extend) (462-7077) | LF | 28 | $1,700.00 | $1,300.00 | $1,300.00 | $1,200.00 | $1,400.00 | $900.00 |
| 34 | Concrete box culvert (8 FT X 8 FT)(extend) (462-7080) | LF | 20 | $1,700.00 | $1,575.00 | $1,575.00 | $1,300.00 | $1,700.00 | $1,200.00 |
| 35 | Concrete box culvert (9 FT X 5 FT)(extend) (462-7082) | LF | 21 | $1,400.00 | $1,400.00 | $1,100.00 | $1,500.00 | $1,200.00 | |
| 36 | Concrete box culvert (10 FT X 10 FT)(extend) (462-7093) | LF | 88 | $1,800.00 | $1,800.00 | $1,200.00 | $1,900.00 | $2,200.00 | |
| 37 | RC pipe (CL III)(18 in) (464-7003) | LF | 11 | $120.00 | $100.00 | $100.00 | $135.00 | $110.00 | $70.00 |
| 38 | RC pipe (CL III)(24 in) (464-7005) | LF | 211 | $150.00 | $110.00 | $110.00 | $150.00 | $120.00 | $150.00 |
| 39 | RC pipe (CL III)(36 in) (464-7009) | LF | 49 | $195.00 | $195.00 | $180.00 | $210.00 | $285.00 | |
| 40 | RC pipe (CL III)(48 in) (464-7011) | LF | 18 | $270.00 | $320.00 | $320.00 | $300.00 | $340.00 | $450.00 |
| 41 | Headwall (CH - PW - 0) (diameter= 24 in) (466-7101) | EACH | 1 | $8,000.00 | $7,800.00 | $7,800.00 | $9,000.00 | $8,200.00 | $5,000.00 |
| 42 | Headwall (CH - PW - 0) (diameter= 48 in) (466-7107) | EACH | 4 | $10,000 | $18,400 | $18,400 | $27,000 | $20,000 | $16,000 |
| 43 | Wingwall (FW - 0) (HW=3 FT) (466-7145) | EACH | 4 | $8,000.00 | $8,000.00 | $11,000 | $8,500.00 | $4,000.00 | |
| 44 | Wingwall (PW - 2) (HW=5 FT) (466-7189) | EACH | 2 | $17,000 | $10,000 | $10,000 | $26,000 | $11,000 | $7,000.00 |
| 45 | Wingwall (PW - 2) (HW=6 FT) (466-7190) | EACH | 1 | $16,200 | $16,200 | $23,000 | $17,000 | $10,000 | |
| 46 | Wingwall (PW - 2) (HW=7 FT) (466-7191) | EACH | 4 | $35,000 | $21,600 | $21,600 | $27,000 | $23,000 | $14,000 |
| 47 | Wingwall (PW - 2) (HW=8 FT) (466-7192) | EACH | 1 | $26,400 | $26,400 | $32,000 | $28,000 | $17,000 | |
| 48 | Wingwall (PW - 2) (HW=10 FT) (466-7194) | EACH | 2 | $50,000 | $47,800 | $47,800 | $49,000 | $50,000 | $30,000 |
| 49 | Wingwall (PW - 2) (HW=12 FT) (466-7196) | EACH | 2 | $84,200 | $84,200 | $67,000 | $88,000 | $52,000 | |
| 50 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 106 | $1,000.00 | $1,200.00 | $1,200.00 | $1,600.00 | $1,300.00 | $1,000.00 |
| 51 | Set (type II) (18 in) (RCP) (4: 1) (C) (467-7306) | EACH | 2 | $1,500.00 | $1,000.00 | $1,000.00 | $1,400.00 | $1,100.00 | $900.00 |
| 52 | Set (type II) (18 in) (RCP) (6: 1) (P) (467-7308) | EACH | 6 | $1,000.00 | $1,200.00 | $1,200.00 | $1,600.00 | $1,300.00 | $1,000.00 |
| 53 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 16 | $1,650.00 | $1,400.00 | $1,400.00 | $2,100.00 | $1,500.00 | $2,500.00 |
| 54 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 13 | $1,500.00 | $1,350.00 | $1,350.00 | $2,000.00 | $1,400.00 | $2,200.00 |
| 55 | Set (type II) (36 in) (RCP) (4: 1) (C) (467-7366) | EACH | 6 | $2,700.00 | $3,850.00 | $3,850.00 | $3,400.00 | $4,000.00 | $4,500.00 |
| 56 | Removing & RE - lay pipe (24 in) (472-7006) | LF | 14 | $100.00 | $100.00 | $80.00 | $120.00 | $65.00 | |
| 57 | Removing & RE - lay pipe (36 in) (472-7011) | LF | 10 | $150.00 | $150.00 | $100.00 | $155.00 | $100.00 | |
| 58 | Clean existing culverts (480-7001) | EACH | 20 | $2,000.00 | $300.00 | $3,500.00 | $500.00 | $2,200.00 | $2,000.00 |
| 59 | Removing structure (wingwall) (496-7005) | EACH | 14 | $1,000.00 | $500.00 | $500.00 | $3,400.00 | $550.00 | $1,500.00 |
| 60 | Removing structure (headwall) (496-7006) | EACH | 20 | $1,000.00 | $500.00 | $500.00 | $250.00 | $550.00 | $1,500.00 |
| 61 | Removing structure (pipe) (496-7007) | LF | 382 | $85.00 | $12.00 | $12.00 | $19.00 | $13.00 | $40.00 |
| 62 | Mobilization (500-7001) | LS | 1 | $592,490 | $400,000 | $400,000 | $755,000 | $395,000 | $856,447 |
| 63 | Barricades, signs and traffic handling (502-7001) | MO | 18 | $5,000.00 | $23,500 | $19,000 | $21,000 | $10,000 | $24,157 |
| 64 | TMA (stationary) (505-7001) | DAY | 359 | $150.00 | $1.00 | $300.00 | $100.00 | $250.00 | $5.00 |
| 65 | TMA (mobile operation) (505-7003) | DAY | 20 | $150.00 | $1.00 | $750.00 | $100.00 | $250.00 | $50.00 |
| 66 | Rock filter dams (install) (type 1) (506-7001) | LF | 140 | $45.00 | $20.00 | $26.00 | $50.00 | $27.00 | $42.00 |
| 67 | Rock filter dams (remove) (506-7011) | LF | 140 | $10.00 | $5.00 | $10.00 | $14.00 | $15.00 | $11.00 |
| 68 | Temporary sediment control fence (install) (506-7039) | LF | 2,272 | $5.00 | $2.50 | $3.00 | $6.00 | $3.20 | $5.00 |
| 69 | Temporary sediment control fence (remove) (506-7041) | LF | 2,272 | $1.50 | $0.50 | $1.00 | $1.75 | $1.10 | $1.50 |
| 70 | Biodegradable erosion control logs (install) (18") (506-7045) | LF | 1,200 | $10.00 | $3.00 | $4.00 | $10.00 | $4.30 | $8.50 |
| 71 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,200 | $1.50 | $0.50 | $1.00 | $2.50 | $1.10 | $2.00 |
| 72 | Driveways (concrete) (530-7006) | SY | 222 | $75.00 | $120.00 | $131.00 | $130.00 | $130.00 | $241.93 |
| 73 | Driveways (ACP) (530-7010) | SY | 1,510 | $30.00 | $48.00 | $40.00 | $45.00 | $60.00 | $59.00 |
| 74 | Driveways (base) (530-7015) | SY | 6,654 | $20.00 | $30.00 | $19.00 | $13.00 | $37.00 | $25.12 |
| 75 | Turnouts (ACP) (530-7018) | SY | 752 | $51.00 | $75.00 | $80.00 | $45.00 | $60.00 | $33.14 |
| 76 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 74,186 | $0.30 | $0.10 | $0.21 | $0.20 | $0.25 | $0.07 |
| 77 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 37,093 | $0.35 | $0.10 | $0.21 | $0.20 | $0.25 | $0.08 |
| 78 | Metal W-beam guard fence (timber post) (540-7001) | LF | 700 | $25.00 | $29.80 | $25.00 | $26.00 | $24.00 | |
| 79 | Metal W - beam guard fence (low fill culvert) (540-7018) | LF | 200 | $85.00 | $100.00 | $85.00 | $88.00 | $83.00 | |
| 80 | Guardrail end treatment (install) (544-7001) | EACH | 8 | $3,350.00 | $3,460.00 | $3,200.00 | $3,200.00 | $3,000.00 | |
| 81 | Wire fence (type C) (552-7003) | LF | 147 | $35.00 | $40.00 | $16.00 | $23.00 | $30.00 | |
| 82 | Gate (type 1) (552-7006) | EACH | 1 | $2,000.00 | $3,500.00 | $1,700.00 | $3,000.00 | $2,000.00 | |
| 83 | Mailbox install-S (TWG-post) type 2 (560-7002) | EACH | 40 | $450.00 | $275.00 | $220.00 | $225.00 | $320.00 | $220.00 |
| 84 | Mailbox install-S (TWW-post) type 4 (560-7008) | EACH | 7 | $450.00 | $275.00 | $250.00 | $255.00 | $400.00 | $250.00 |
| 85 | Install small roadside sign support and assembly type 10BWG(1)SB(P) (644-7009) | EACH | 9 | $650.00 | $725.00 | $750.00 | $775.00 | $910.00 | $750.00 |
| 86 | Install small roadside sign support and assembly type 10BWG(1)SB(T) (644-7012) | EACH | 22 | $500.00 | $825.00 | $850.00 | $900.00 | $1,000.00 | $850.00 |
| 87 | Install small roadside sign support and assembly type 10BWG(1)SB(U) (644-7015) | EACH | 2 | $650.00 | $1,045.00 | $850.00 | $900.00 | $1,300.00 | $850.00 |
| 88 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 13 | $650.00 | $475.00 | $450.00 | $475.00 | $650.00 | $450.00 |
| 89 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 5 | $500.00 | $555.00 | $650.00 | $675.00 | $700.00 | $650.00 |
| 90 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 44 | $43.00 | $28.00 | $30.00 | $35.00 | $36.00 | $34.00 |
| 91 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 4,932 | $0.89 | $0.10 | $2.00 | $2.50 | $0.60 | $2.00 |
| 92 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 75,821 | $0.62 | $0.54 | $0.61 | $0.70 | $0.57 | $0.54 |
| 93 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 16,246 | $0.65 | $0.57 | $0.69 | $0.70 | $0.60 | $0.57 |
| 94 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 51,836 | $0.65 | $0.55 | $0.61 | $0.70 | $0.58 | $0.55 |
| 95 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 1,264 | $8.00 | $3.90 | $4.50 | $5.00 | $4.20 | $3.90 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.