TxDOT contract A00184722 bid tabulation
Hazard Elimination & Safety, US 377 (.300 Mi S of FM 922 to .3 Mi N of McKnight Rd). Let by Texas DOT on March 4, 2025, Grayson, Paris District. 3 bids received; low bid $6,968,771 by Jagoe-Public Company, -34% against the engineer's estimate of $10,545,460.
- Owner
- Texas DOT
- Letting
- 04 MAR 2025
- Pay items
- 129
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Jagoe-Public Company | $6,968,771 | Low | -34% |
| 2 | Ed Bell Construction Company | $7,778,847 | +12% | -26% |
| 3 | Grey Sky Construction LLC | $11,297,550 | +62% | +7.0% |
Engineer's estimate: $10,545,460.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Jagoe-Public Company | 2. Ed Bell Construction Company | 3. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 81 | $7,616.67 | $100.00 | $4,260.00 | $9,450.00 |
| 2 | Removing concrete (driveways) (104-7011) | SY | 728 | $27.15 | $22.00 | $40.00 | $30.00 |
| 3 | Remove (4"-8") TRT/untrt base & asphalt pavement (105-7004) | SY | 2,492 | $53.70 | $9.00 | $10.00 | $30.00 |
| 4 | Remove (8"-12") TRT/untrt base & asphalt pavement (105-7008) | SY | 6,905 | $89.50 | $4.25 | $10.00 | $30.00 |
| 5 | Excavation (roadway) (110-7001) | CY | 21,612 | $31.54 | $20.00 | $30.00 | $30.00 |
| 6 | Embankment (final)(OC)(type B) (132-7003) | CY | 7,581 | $38.77 | $3.50 | $20.00 | $50.00 |
| 7 | Block sodding (162-7002) | SY | 58,681 | $6.00 | $4.00 | $3.75 | $10.00 |
| 8 | Broadcast seed (temporary_cool) (164-7006) | SY | 29,341 | $2.69 | $0.15 | $0.16 | $1.00 |
| 9 | Vegetative watering (168-7001) | TGL | 1,399 | $76.99 | $60.00 | $20.00 | $20.00 |
| 10 | Lime (com or QK)(slurry) or QK(dry) (260-7001) | TON | 367 | $387.48 | $325.00 | $500.00 | $400.00 |
| 11 | Lime TRT (existing material)(6") (260-7006) | SY | 22,655 | $12.50 | $9.00 | $15.00 | $10.00 |
| 12 | D-GR HMA type-B PG64-22 (341-7001) | TON | 9,434 | $135.27 | $115.00 | $113.40 | $180.00 |
| 13 | D-GR HMA type D PG64-22 (341-7043) | TON | 2,049 | $280.00 | $120.00 | $115.50 | $220.00 |
| 14 | SP mixes SP-C PG64-22 (344-7009) | TON | 8,440 | $230.00 | $125.00 | $118.15 | $220.00 |
| 15 | Tack coat (344-7077) | GAL | 4,630 | $5.40 | $5.00 | $5.00 | $10.00 |
| 16 | Planing asphalt concrete pavement(1") (354-7050) | SY | 31,568 | $9.13 | $1.50 | $2.00 | $10.00 |
| 17 | Struct excavation (400-7001) | CY | 926 | $34.33 | $38.00 | $15.00 | $100.00 |
| 18 | Cem stabil BKFL (400-7010) | CY | 585 | $234.95 | $250.00 | $300.00 | $85.00 |
| 19 | Temporary special shoring (403-7001) | SF | 1,505 | $40.00 | $10.00 | $85.00 | $85.00 |
| 20 | Drilled shaft (traffic signal pole) (30 in) (416-7043) | LF | 48 | $585.00 | $500.00 | $424.00 | $500.00 |
| 21 | Drilled shaft (traffic signal pole) (36 in) (416-7044) | LF | 28 | $428.88 | $525.00 | $450.50 | $650.00 |
| 22 | Riprap (concrete)(5 in) (432-7002) | CY | 14 | $1,000.00 | $600.00 | $1,000.00 | $650.00 |
| 23 | Riprap (mow strip)(4 in) (432-7013) | CY | 33 | $1,000.00 | $900.00 | $550.00 | |
| 24 | Riprap (stone protection)(24 in) (432-7045) | CY | 201 | $225.00 | $500.00 | $250.00 | $250.00 |
| 25 | Concrete box culvert (3 FT X 2 FT)(extend) (462-7056) | LF | 12 | $923.53 | $600.00 | $1,200.00 | $1,000.00 |
| 26 | Concrete box culvert (4 FT X 2 FT)(extend) (462-7058) | LF | 12 | $1,350.00 | $700.00 | $1,400.00 | $1,000.00 |
| 27 | Concrete box culvert (5 FT X 5 FT)(extend) (462-7064) | LF | 37 | $1,300.00 | $1,600.00 | $1,500.00 | |
| 28 | RC pipe (CL III)(24 in) (464-7005) | LF | 1,072 | $108.43 | $110.00 | $90.00 | $100.00 |
| 29 | RC pipe (CL III)(30 in) (464-7007) | LF | 72 | $175.00 | $120.00 | $2,000.00 | |
| 30 | Wingwall (FW - S) (HW=6 FT) (466-7162) | EACH | 2 | $17,000 | $20,000 | $25,000 | |
| 31 | Set (type I)(S= 3 FT)(HW= 3 FT)(4:1)(C) (467-7041) | EACH | 1 | $10,000 | $16,000 | $20,000 | $15,000 |
| 32 | Set (type I)(S= 3 FT)(HW= 4 FT)(4:1)(C) (467-7045) | EACH | 1 | $15,890 | $21,000 | $29,000 | $16,500 |
| 33 | Set (type I)(S= 4 FT)(HW= 4 FT)(4:1)(C) (467-7072) | EACH | 2 | $17,000 | $12,000 | $15,000 | $18,500 |
| 34 | Set (type II) (24 in) (RCP) (6: 1) (P) (467-7328) | EACH | 44 | $1,415.25 | $2,400.00 | $1,700.00 | $2,500.00 |
| 35 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 4 | $4,500.00 | $5,100.00 | $3,500.00 | |
| 36 | Clean existing culverts (480-7001) | EACH | 3 | $2,000.00 | $2,300.00 | $5,250.00 | $1,500.00 |
| 37 | Removing structure (set) (496-7004) | EACH | 42 | $378.24 | $39.00 | $250.00 | $500.00 |
| 38 | Removing structure (wingwall) (496-7005) | EACH | 6 | $1,000.00 | $2,300.00 | $5,000.00 | $2,500.00 |
| 39 | Removing structure (pipe) (496-7007) | LF | 945 | $27.50 | $23.00 | $20.00 | $50.00 |
| 40 | Removing structure (box culvert) (496-7008) | LF | 8 | $800.00 | $800.00 | $150.00 | |
| 41 | Mobilization (500-7001) | LS | 1 | $705,649 | $767,000 | $800,000 | $765,000 |
| 42 | Barricades, signs and traffic handling (502-7001) | MO | 13 | $14,000 | $40,000 | $42,000 | $8,500.00 |
| 43 | Portable changeable message sign (503-7002) | EACH | 4 | $16,283 | $15,000 | $9,500.00 | $20,000 |
| 44 | TMA (stationary) (505-7001) | DAY | 360 | $125.85 | $180.00 | $105.00 | $250.00 |
| 45 | TMA (mobile operation) (505-7003) | DAY | 30 | $600.00 | $200.00 | $1,200.00 | $550.00 |
| 46 | Rock filter dams (install) (type 2) (506-7002) | LF | 1,030 | $125.00 | $70.00 | $48.76 | $40.00 |
| 47 | Rock filter dams (remove) (506-7011) | LF | 1,030 | $35.00 | $15.00 | $22.26 | $20.00 |
| 48 | Construction exits (install) (type 2) (506-7021) | SY | 472 | $49.98 | $25.00 | $39.49 | $50.00 |
| 49 | Construction exits (remove) (506-7024) | SY | 472 | $14.41 | $10.00 | $11.66 | $20.00 |
| 50 | Temporary sediment control fence (install) (506-7039) | LF | 1,860 | $5.89 | $6.00 | $3.71 | $4.00 |
| 51 | Temporary sediment control fence (remove) (506-7041) | LF | 1,860 | $1.46 | $1.00 | $1.33 | $2.00 |
| 52 | Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005) | LF | 1,320 | $65.96 | $32.00 | $36.00 | $100.00 |
| 53 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $67.20 | $30.00 | $100.00 | $100.00 |
| 54 | Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029) | LF | 1,260 | $16.00 | $28.00 | $12.00 | $20.00 |
| 55 | Portable concrete traffic barrier (move)(low prof)(type 2) (512-7034) | LF | 20 | $16.91 | $10.00 | $60.00 | $20.00 |
| 56 | Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053) | LF | 1,320 | $18.52 | $25.00 | $18.00 | $20.00 |
| 57 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 40 | $19.74 | $5.00 | $75.00 | $20.00 |
| 58 | Portable concrete traffic barrier(fur & install)(F-shape)(type T) (512-7066) | LF | 20 | $100.00 | $32.00 | $250.00 | $100.00 |
| 59 | Portable concrete traffic barrier(move)(F-shape)(type T) (512-7067) | LF | 10 | $50.00 | $10.00 | $125.00 | $20.00 |
| 60 | Portable concrete traffic barrier(remove)(F-shape)(type T) (512-7069) | LF | 20 | $50.00 | $5.00 | $150.00 | $20.00 |
| 61 | Driveways (concrete) (530-7006) | SY | 593 | $140.00 | $150.00 | $100.00 | |
| 62 | Driveways (ACP) (530-7010) | SY | 1,177 | $104.87 | $90.00 | $93.00 | $45.00 |
| 63 | Mill rumble strips (asphalt) (shoulder) (533-7001) | LF | 4,200 | $4.61 | $2.50 | $2.00 | $1.00 |
| 64 | Metal W-beam guard fence (timber post) (540-7001) | LF | 500 | $28.00 | $26.24 | $30.00 | |
| 65 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,500.00 | $3,253.14 | $3,500.00 | |
| 66 | Crash cushion attenuator (move & reset) (545-7002) | EACH | 5 | $2,150.00 | $2,500.00 | $2,000.00 | $8,500.00 |
| 67 | Crash cushion attenuator (remove) (545-7004) | EACH | 6 | $537.50 | $1,500.00 | $1,000.00 | $2,500.00 |
| 68 | Crash cushion attenuator (install)(S)(N)(TL3) (545-7014) | EACH | 6 | $9,191.25 | $15,000 | $9,000.00 | $21,500 |
| 69 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 4 | $252.67 | $300.00 | $300.00 | $1,500.00 |
| 70 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 100 | $34.68 | $30.00 | $24.38 | $40.00 |
| 71 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 220 | $26.74 | $32.00 | $26.50 | $60.00 |
| 72 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 165 | $56.02 | $50.00 | $40.28 | $80.00 |
| 73 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 235 | $19.26 | $27.00 | $22.26 | $30.00 |
| 74 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 60 | $40.00 | $33.92 | $60.00 | |
| 75 | Electrical conductor (no.6) bare (620-7009) | LF | 485 | $5.52 | $4.50 | $3.71 | $3.00 |
| 76 | Electrical conductor (no.6) insulated (620-7010) | LF | 30 | $7.26 | $5.25 | $4.24 | $3.00 |
| 77 | Tray cable (3 conductor) (12 AWG) (621-7002) | LF | 1,800 | $3.30 | $4.00 | $3.18 | $3.00 |
| 78 | Ground box type D (162922) (624-7007) | EACH | 2 | $2,297.07 | $1,700.00 | $1,431.00 | $1,500.00 |
| 79 | Ground box type D (162922)W/apron (624-7008) | EACH | 8 | $1,733.26 | $2,000.00 | $1,590.00 | $1,500.00 |
| 80 | Elc SRV type D 120/240 060(NS)SS(E)PS(U) (628-7147) | EACH | 2 | $7,750.00 | $8,500.00 | $6,996.00 | $12,500 |
| 81 | Aluminum signs (type A) (636-7001) | SF | 81 | $53.05 | $41.00 | $38.16 | $40.00 |
| 82 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 26 | $808.24 | $750.00 | $715.50 | $1,500.00 |
| 83 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 4 | $831.00 | $850.00 | $832.10 | $1,500.00 |
| 84 | Install small roadside sign support and assembly type 10BWG(1)SA(T-2EXT) (644-7005) | EACH | 1 | $1,776.35 | $950.00 | $927.50 | $1,500.00 |
| 85 | Install small roadside sign support and assembly TYS80(1)SA(P-BM) (644-7026) | EACH | 7 | $782.60 | $1,100.00 | $1,054.70 | $1,500.00 |
| 86 | Install small roadside sign support and assembly TYS80(1)SA(T) (644-7028) | EACH | 1 | $1,100.00 | $1,033.50 | $1,500.00 | |
| 87 | Install small roadside sign support and assembly TYS80(1)SA(T-2EXT) (644-7029) | EACH | 2 | $1,112.47 | $1,200.00 | $1,139.50 | $1,500.00 |
| 88 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $1,100.00 | $1,300.00 | $1,266.70 | $1,500.00 |
| 89 | Remove SM RD SN sup&AM (644-7073) | EACH | 44 | $110.28 | $90.00 | $83.74 | $500.00 |
| 90 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 10 | $28.00 | $26.50 | $100.00 | |
| 91 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 8 | $100.00 | $80.00 | $79.50 | $100.00 |
| 92 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 800 | $2.00 | $5.00 | $6.00 | $6.00 |
| 93 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 400 | $1.50 | $5.00 | $6.15 | $6.00 |
| 94 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 650 | $2.54 | $1.75 | $2.12 | $6.00 |
| 95 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 270 | $11.42 | $10.00 | $8.48 | $20.00 |
| 96 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 41 | $228.28 | $210.00 | $148.40 | $250.00 |
| 97 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 5 | $256.82 | $310.00 | $190.80 | $250.00 |
| 98 | Reflectorized pavement marking type I (Y)24"(solid)(100MIL) (666-7123) | LF | 630 | $13.26 | $9.00 | $8.48 | $20.00 |
| 99 | Reflectorized pavement marking type I (W)6"(solid)(100MIL) (666-7411) | LF | 15,115 | $5.73 | $0.80 | $0.95 | $1.00 |
| 100 | Reflectorized pavement marking type I (Y)6"(broken)(100MIL) (666-7420) | LF | 2,475 | $0.99 | $1.25 | $1.06 | $1.00 |
| 101 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 18,304 | $3.15 | $0.80 | $0.95 | $1.00 |
| 102 | Reflectorized pavement marker type I-C (672-7002) | EACH | 34 | $7.18 | $8.00 | $6.36 | $6.00 |
| 103 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 408 | $8.36 | $8.00 | $5.30 | $6.00 |
| 104 | Install highway traffic signal (isolated) (680-7002) | EACH | 2 | $41,252 | $20,000 | $15,900 | $55,000 |
| 105 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 12 | $386.64 | $500.00 | $397.50 | $325.00 |
| 106 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 2 | $386.46 | $500.00 | $397.50 | $325.00 |
| 107 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 12 | $387.04 | $500.00 | $397.50 | $325.00 |
| 108 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 4 | $342.89 | $500.00 | $397.50 | $325.00 |
| 109 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 12 | $386.64 | $500.00 | $397.50 | $325.00 |
| 110 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 2 | $342.89 | $500.00 | $397.50 | $325.00 |
| 111 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 12 | $199.55 | $300.00 | $233.20 | $250.00 |
| 112 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 2 | $257.17 | $275.00 | $222.60 | $350.00 |
| 113 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 486 | $3.63 | $5.00 | $4.24 | $3.00 |
| 114 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 112 | $4.97 | $6.50 | $5.30 | $3.00 |
| 115 | Traffic signal CBL (type A)(14 AWG)(9 conductor) (684-7035) | LF | 660 | $3.90 | $8.00 | $6.36 | $3.00 |
| 116 | Ins traffic signal PL AM(S)1 arm(24')lum&ilsn (686-7028) | EACH | 1 | $15,000 | $13,462 | $35,000 | |
| 117 | Ins traffic signal PL AM(S)1 arm(28')lum&ilsn (686-7032) | EACH | 1 | $13,840 | $15,500 | $13,780 | $38,500 |
| 118 | Ins traffic signal PL AM(S)1 arm(32')lum&ilsn (686-7036) | EACH | 2 | $19,937 | $16,000 | $14,098 | $40,000 |
| 119 | Ins traffic signal PL AM(S)1 arm(36')lum&ilsn (686-7040) | EACH | 1 | $17,000 | $15,370 | $45,000 | |
| 120 | Ins traffic signal PL AM(S)1 arm(40')lum&ilsn (686-7044) | EACH | 1 | $17,264 | $17,500 | $15,900 | $50,000 |
| 121 | ITS com CBL (ethernet) (6005-7001) | LF | 115 | $4.00 | $4.50 | $3.71 | $10.00 |
| 122 | Bbu system (external battery cabinet) (6007-7001) | EACH | 2 | $10,000 | $10,000 | $8,480.00 | $12,500 |
| 123 | ITS radio (dual) (5 GHZ/5 GHZ)-I-U (6014-7002) | EACH | 2 | $3,500.00 | $4,500.00 | $3,710.00 | $6,500.00 |
| 124 | VDS prosr sys (6017-7001) | EACH | 2 | $35,000 | $35,000 | $27,878 | $30,000 |
| 125 | HVDS W/var LNS (6017-7008) | EACH | 2 | $8,000.00 | $22,000 | $19,080 | $30,000 |
| 126 | VDS CNTRL software (6017-7009) | EACH | 2 | $2,000.00 | $250.00 | $212.00 | $8,500.00 |
| 127 | VDS atspm (6017-7010) | EACH | 2 | $4,000.00 | $3,000.00 | $2,650.00 | $60,000 |
| 128 | VDS cabling (6017-7012) | LF | 903 | $5.00 | $5.00 | $4.24 | $3.00 |
| 129 | VDS recording (6017-7013) | EACH | 2 | $900.00 | $260.00 | $212.00 | $65,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 4, 2025. Compiled by Mirage Metrics.