TxDOT contract A00191714 bid tabulation
METAL BEAM GUARD FENCE REPAIR, SH0288 (VARIOUS HWYS IN BRAZORIA COUNTY to VARIOUS HWYS IN BRAZORIA COUNTY). Let by Texas DOT on March 11, 2025, Brazoria, Houston District. 8 bids received; low bid $678,427 by Rhino Equity, LLC, -26% against the engineer's estimate of $917,668.
- Owner
- Texas DOT
- Letting
- 11 MAR 2025
- Pay items
- 39
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Rhino Equity, LLC | $678,427 | Low | -26% |
| 2 | Above All Contracting LLC | $776,641 | +14% | -15% |
| 3 | BK Field Operations LLC | $829,101 | +22% | -10% |
| 4 | Hazmat International, Inc. | $864,008 | +27% | -6.0% |
| 5 | Roy Jorgensen Associates, Inc. | $886,000 | +31% | -3.0% |
| 6 | B & MS Construction, Inc. | $906,846 | +34% | -1.0% |
| 7 | Isi Contracting, Inc. | $992,324 | +46% | +8.0% |
| 8 | Elite Kings Construction, LLC | $1,289,044 | +90% | +40% |
Engineer's estimate: $917,668.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Rhino Equity, LLC | 2. Above All Contracting LLC | 3. BK Field Operations LLC | 4. Hazmat International, Inc. | 5. Roy Jorgensen Associates, Inc. | 6. B & MS Construction, Inc. |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (mowstrip) (104-7005) | LF | 800 | $12.40 | $1.00 | $5.00 | $9.00 | $10.00 | $20.00 | $45.00 |
| 2 | Remove (4") TRT/untrt base & asphalt pavement (105-7024) | SY | 280 | $14.00 | $1.00 | $5.00 | $20.00 | $11.00 | $50.00 | $40.00 |
| 3 | Riprap (mow strip)(4 in) (432-7013) | CY | 100 | $497.88 | $350.00 | $400.00 | $500.00 | $400.00 | $500.00 | $600.00 |
| 4 | Mobilization (callout) (500-7002) | EACH | 45 | $493.45 | $1.00 | $1.00 | $1.00 | $50.00 | $150.00 | $300.00 |
| 5 | Mobilization (emergency) (500-7033) | EACH | 6 | $675.00 | $1.00 | $1.00 | $1.00 | $1,000.00 | $1,500.00 | $1,000.00 |
| 6 | Portable changeable message sign (503-7001) | DAY | 6 | $142.15 | $100.00 | $300.00 | $1,000.00 | $50.00 | $250.00 | $250.00 |
| 7 | TMA (stationary) (505-7001) | DAY | 250 | $284.88 | $1.00 | $1.00 | $1.00 | $1.00 | $50.00 | $290.00 |
| 8 | Portable concrete traffic barrier (move)(F-shape)(type 4) (512-7032) | LF | 600 | $21.25 | $1.00 | $10.00 | $8.00 | $4.00 | $20.00 | $55.00 |
| 9 | Concrete curb (type II) (529-7002) | LF | 150 | $32.45 | $10.00 | $30.00 | $15.00 | $20.00 | $25.00 | $65.00 |
| 10 | Metal W-beam guard fence (timber post) (540-7001) | LF | 350 | $24.11 | $15.00 | $30.00 | $22.00 | $11.00 | $30.00 | $35.00 |
| 11 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 30 | $2,012.38 | $1,200.00 | $1,900.00 | $1,500.00 | $1,200.00 | $1,500.00 | $2,450.00 |
| 12 | Short radius (28") (540-7013) | LF | 50 | $211.35 | $10.00 | $60.00 | $40.00 | $65.00 | $50.00 | $40.00 |
| 13 | Downstream anchor terminal section (540-7015) | EACH | 10 | $1,534.04 | $1,000.00 | $1,700.00 | $1,200.00 | $1,200.00 | $1,000.00 | $2,200.00 |
| 14 | Metal beam guard fence trans (anchor plate) (540-7029) | EACH | 1 | $648.99 | $100.00 | $1,000.00 | $5,000.00 | $300.00 | $1,000.00 | $950.00 |
| 15 | Remove metal beam guard fence (542-7001) | LF | 800 | $3.26 | $2.00 | $6.00 | $3.00 | $1.00 | $15.00 | $5.50 |
| 16 | Guardrail end treatment (install) (544-7001) | EACH | 2 | $3,143.00 | $2,200.00 | $3,200.00 | $4,000.00 | $3,000.00 | $6,000.00 | $2,100.00 |
| 17 | Guardrail end TRTMNT(retro)(steel post) (544-7008) | EACH | 10 | $2,000.00 | $1,350.00 | $2,900.00 | $1.00 | $1.00 | $2,000.00 | $1,700.00 |
| 18 | Guardrail end TRTMNT(retro)(wood post) (544-7009) | EACH | 10 | $2,000.00 | $1,350.00 | $2,900.00 | $1.00 | $1.00 | $2,000.00 | $1,800.00 |
| 19 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 300 | $47.47 | $1.00 | $25.00 | $5.00 | $6.00 | $25.00 | $20.00 |
| 20 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 5 | $21.90 | $8.00 | $30.00 | $10.00 | $6.00 | $100.00 | $18.00 |
| 21 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BR) (658-7020) | EACH | 5 | $16.38 | $8.00 | $30.00 | $10.00 | $6.00 | $100.00 | $26.00 |
| 22 | Install delineator assembly (D-DW)SZ 1(BRF)GF2 (658-7048) | EACH | 8 | $21.99 | $8.00 | $30.00 | $10.00 | $6.00 | $100.00 | $35.00 |
| 23 | Replace rail element (W-beam) (770-7001) | LF | 5,000 | $20.60 | $20.00 | $28.00 | $15.00 | $16.00 | $17.00 | $28.00 |
| 24 | Replace rail element (thrie-beam) (770-7002) | LF | 50 | $28.71 | $2.00 | $100.00 | $80.00 | $35.00 | $75.00 | $38.00 |
| 25 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 2 | $41.00 | $1.00 | $600.00 | $500.00 | $300.00 | $500.00 | $48.00 |
| 26 | Replace timber post W/O concrete FND (770-7006) | EACH | 100 | $37.55 | $75.00 | $40.00 | $20.00 | $50.00 | $80.00 | $55.00 |
| 27 | Replace timber post W/ concrete FND (770-7008) | EACH | 100 | $33.31 | $250.00 | $40.00 | $400.00 | $50.00 | $260.00 | $60.00 |
| 28 | Realign posts (770-7010) | EACH | 30 | $35.35 | $1.00 | $100.00 | $1.00 | $100.00 | $75.00 | $25.00 |
| 29 | Repl single gdrail terminal impact head (770-7015) | EACH | 150 | $1,162.50 | $1,600.00 | $900.00 | $2,400.00 | $2,000.00 | $1,200.00 | $790.00 |
| 30 | Replace single gdrail terminal rail (770-7016) | LF | 5,000 | $36.38 | $20.00 | $30.00 | $28.00 | $20.00 | $36.00 | $28.00 |
| 31 | Replace single gdrail terminal post (770-7017) | EACH | 600 | $135.75 | $40.00 | $100.00 | $35.00 | $200.00 | $100.00 | $55.00 |
| 32 | Replace blockout (770-7018) | EACH | 100 | $41.17 | $100.00 | $50.00 | $10.00 | $750.00 | $50.00 | $28.00 |
| 33 | Repair steel post with base plate (770-7019) | EACH | 5 | $154.25 | $1.00 | $300.00 | $1.00 | $50.00 | $750.00 | $200.00 |
| 34 | Reset SGT impact head (770-7020) | EACH | 15 | $100.33 | $1.00 | $200.00 | $1.00 | $500.00 | $750.00 | $450.00 |
| 35 | Replace SGT object marker (770-7021) | EACH | 200 | $26.50 | $20.00 | $1.00 | $1.00 | $30.00 | $30.00 | $89.00 |
| 36 | Replace SGT cable anchor (770-7022) | EACH | 120 | $36.60 | $120.00 | $100.00 | $65.00 | $100.00 | $120.00 | $70.00 |
| 37 | Replace SGT cable assembly (770-7023) | EACH | 120 | $36.60 | $120.00 | $100.00 | $65.00 | $100.00 | $120.00 | $70.00 |
| 38 | Replace SGT strut (770-7024) | EACH | 120 | $66.60 | $120.00 | $100.00 | $65.00 | $50.00 | $120.00 | $65.00 |
| 39 | Raise rail (770-7025) | LF | 100 | $3.67 | $2.00 | $50.00 | $15.00 | $5.00 | $30.00 | $39.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of March 11, 2025. Compiled by Mirage Metrics.