TxDOT contract A00196312 bid tabulation
Construct Pedestrian Infrastructure, BS 71E (SH 71 to Water St). Let by Texas DOT on December 3, 2025, Fayette, Yoakum District. 12 bids received; low bid $4,027,355 by Larry Young Paving, Inc., -20% against the engineer's estimate of $5,028,099.
- Owner
- Texas DOT
- Letting
- 03 DEC 2025
- Pay items
- 84
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Larry Young Paving, Inc. | $4,027,355 | Low | -20% |
| 2 | Professional Traffic Control LLC | $4,077,955 | +1.0% | -19% |
| 3 | Garret Shields Infrastructure | $4,334,940 | +8.0% | -14% |
| 4 | MBN Enterprises LLC | $4,358,949 | +8.0% | -13% |
| 5 | STX Civil | $4,366,772 | +8.0% | -13% |
| 6 | Ti-Zack Concrete, LLC | $4,474,974 | +11% | -11% |
| 7 | 3LW Civil LLC | $4,661,280 | +16% | -7.0% |
| 8 | Castillo Aranda LLC | $4,688,447 | +16% | -7.0% |
| 9 | Grey Sky Construction LLC | $5,214,187 | +29% | +4.0% |
| 10 | Hunter Industries, LTD. | $5,371,339 | +33% | +7.0% |
| 11 | Icos Management, LLC | $5,449,794 | +35% | +8.0% |
| 12 | Roman Emperors Road, LLC | $5,580,083 | +39% | +11% |
Engineer's estimate: $5,028,099.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Larry Young Paving, Inc. | 2. Professional Traffic Control LLC | 3. Garret Shields Infrastructure | 4. MBN Enterprises LLC | 5. STX Civil | 6. Ti-Zack Concrete, LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 20 | $1,000.00 | $1,400.00 | $1,000.00 | $1,000.00 | $3,500.00 | $500.00 | $825.00 |
| 2 | Preparation row (tree remove) (12"-24" diameter) (100-7004) | EACH | 2 | $910.00 | $1,010.80 | $1,200.00 | $2,000.00 | $1,200.00 | $1,650.00 | |
| 3 | Removing concrete (medians) (104-7008) | SY | 50 | $50.00 | $12.00 | $30.40 | $40.00 | $30.00 | $35.00 | $15.96 |
| 4 | Removing concrete (pavers) (104-7010) | SY | 133 | $30.00 | $12.00 | $10.17 | $40.00 | $25.00 | $10.00 | $15.00 |
| 5 | Removing concrete (driveways) (104-7011) | SY | 7,988 | $28.00 | $10.00 | $19.54 | $10.00 | $18.00 | $25.00 | $24.26 |
| 6 | Removing concrete (sidewalk, ramp or shared use path) (104-7013) | SY | 724 | $35.00 | $12.00 | $19.52 | $20.00 | $25.00 | $40.00 | $33.07 |
| 7 | Removing concrete (curb) (104-7016) | LF | 375 | $9.25 | $7.86 | $10.00 | $12.00 | $10.00 | $8.51 | |
| 8 | Removing concrete (curb & gutter) (104-7017) | LF | 3,146 | $9.25 | $17.48 | $10.00 | $4.00 | $15.00 | $7.61 | |
| 9 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 2,513 | $5.50 | $9.25 | $18.37 | $5.00 | $4.00 | $35.00 | $9.53 |
| 10 | Remove (0"-6") TRT/untrt base & asphalt pavement (105-7046) | SY | 1,723 | $25.00 | $10.00 | $7.10 | $30.00 | $11.00 | $14.00 | $23.16 |
| 11 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 278 | $50.00 | $64.00 | $45.00 | $40.00 | $28.00 | $60.00 | $57.41 |
| 12 | Blading (150-7002) | HR | 30 | $260.00 | $104.00 | $100.00 | $130.00 | $100.00 | $110.00 | |
| 13 | Compost manuf topsoil (2") (161-7001) | SY | 642 | $2.75 | $23.00 | $4.00 | $3.00 | $35.00 | $12.43 | |
| 14 | Block sodding (162-7002) | SY | 1,530 | $10.00 | $8.50 | $7.40 | $8.00 | $11.00 | $12.00 | $5.50 |
| 15 | Vegetative watering (168-7001) | TGL | 6.36 | $250.00 | $28.30 | $500.00 | $300.00 | $50.00 | $1.10 | |
| 16 | FL BS (roadway del) (type E GR 1-2) (in vehicle) (247-7235) | CY | 25 | $270.00 | $65.00 | $40.00 | $120.00 | $600.00 | $107.59 | |
| 17 | Flexible pavement structure repair(2") (351-7001) | SY | 100 | $50.00 | $29.60 | $50.00 | $75.00 | $200.00 | $115.50 | |
| 18 | Cem stabil BKFL (400-7010) | CY | 25 | $150.00 | $189.98 | $300.00 | $120.00 | $225.00 | $137.50 | |
| 19 | Class C concrete (rac-R) (420-7055) | CY | 15.34 | $650.00 | $1,500.00 | $1,000.00 | $1,200.00 | $1,250.00 | $2,750.00 | |
| 20 | Riprap (concrete)(4 in) (432-7001) | CY | 11.20 | $850.00 | $775.00 | $790.00 | $600.00 | $1,000.00 | $625.00 | $762.33 |
| 21 | Riprap (concrete)(5 in) (432-7002) | CY | 2 | $775.00 | $1,000.00 | $600.00 | $1,000.00 | $725.00 | $762.33 | |
| 22 | Rail (type C221) (450-7032) | LF | 69.87 | $250.00 | $106.24 | $200.00 | $230.00 | $350.00 | $330.00 | |
| 23 | Rail (handrail)(type B) (450-7059) | LF | 216 | $210.00 | $200.00 | $93.60 | $200.00 | $215.00 | $180.00 | $157.50 |
| 24 | Concrete box culvert (6 FT X 3 FT) (462-7011) | LF | 19 | $850.00 | $390.56 | $1,000.00 | $1,000.00 | $1,300.00 | $825.00 | |
| 25 | Wingwall (PW - 1) (HW=6 FT) (466-7176) | EACH | 1 | $15,000 | $18,400 | $15,000 | $39,000 | $25,000 | $27,500 | |
| 26 | Removing structure (ret wall) (496-7019) | LF | 78 | $107.00 | $35.00 | $260.00 | $100.00 | $400.00 | $50.00 | $27.50 |
| 27 | Remove STR (bollard) (496-7028) | EACH | 4 | $350.00 | $244.80 | $100.00 | $250.00 | $300.00 | $275.00 | |
| 28 | Mobilization (500-7001) | LS | 1 | $450,000 | $380,000 | $100,000 | $400,000 | $400,000 | $393,000 | $263,519 |
| 29 | Barricades, signs and traffic handling (502-7001) | MO | 16 | $3,500.00 | $4,600.00 | $4,000.00 | $5,000.00 | $2,500.00 | $3,600.00 | $2,750.00 |
| 30 | Portable changeable message sign (503-7002) | EACH | 6 | $11,750 | $13,000 | $8,392.00 | $1,000.00 | $10,000 | $5,000.00 | $0.11 |
| 31 | TMA (stationary) (505-7001) | DAY | 140 | $500.00 | $340.00 | $160.00 | $300.00 | $200.00 | $1.00 | $0.11 |
| 32 | Sandbags for erosion control (506-7035) | EACH | 60 | $14.00 | $16.00 | $11.20 | $5.00 | $20.00 | $3.00 | $0.11 |
| 33 | Temporary sediment control fence (install) (506-7039) | LF | 1,000 | $4.25 | $5.75 | $3.81 | $5.00 | $5.00 | $4.00 | $0.11 |
| 34 | Temporary sediment control fence (remove) (506-7041) | LF | 1,000 | $1.25 | $1.50 | $1.06 | $1.00 | $1.00 | $1.00 | $0.11 |
| 35 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 1,000 | $10.00 | $8.25 | $6.10 | $6.00 | $12.00 | $6.00 | $0.11 |
| 36 | Biodegradable erosion control logs (remove) (506-7046) | LF | 1,000 | $3.00 | $2.25 | $1.60 | $1.00 | $1.00 | $1.00 | $0.11 |
| 37 | Portable concrete traffic barrier (furnish and install)(low prof)(type 1) (512-7009) | LF | 100 | $19.00 | $40.00 | $80.00 | $88.00 | $1.00 | $77.00 | |
| 38 | Portable concrete traffic barrier (furnish and install)(low prof)(type 2) (512-7010) | LF | 40 | $23.00 | $44.00 | $130.00 | $88.00 | $1.00 | $88.00 | |
| 39 | Portable concrete traffic barrier (remove)(low prof)(type 1) (512-7057) | LF | 100 | $18.00 | $16.00 | $40.00 | $30.00 | $25.00 | $22.00 | |
| 40 | Portable concrete traffic barrier (remove)(low prof)(type 2) (512-7058) | LF | 40 | $23.00 | $16.00 | $100.00 | $30.00 | $25.00 | $22.00 | |
| 41 | Remove and relay pavers (528-7003) | SY | 3 | $100.00 | $50.00 | $50.00 | $100.00 | $10.00 | $165.00 | |
| 42 | Concrete curb (type II) (529-7002) | LF | 11 | $32.00 | $49.83 | $50.00 | $40.00 | $40.00 | $51.52 | |
| 43 | Concrete curb & gutter (type II) (529-7009) | LF | 8,666 | $90.00 | $32.00 | $38.72 | $30.00 | $20.00 | $40.00 | $47.49 |
| 44 | Concrete curb (slotted) (529-7013) | LF | 1,042 | $30.00 | $28.00 | $19.71 | $40.00 | $15.00 | $45.00 | $51.52 |
| 45 | Concrete curb (type C1) (529-7016) | LF | 442 | $140.00 | $230.00 | $100.00 | $160.00 | $55.00 | $85.01 | |
| 46 | Concrete curb (type F1) (529-7017) | LF | 96 | $150.00 | $240.00 | $165.00 | $100.00 | $210.00 | $95.00 | $170.02 |
| 47 | Driveways (concrete) (530-7006) | SY | 12,078 | $95.00 | $100.00 | $106.80 | $110.00 | $103.00 | $115.00 | $123.86 |
| 48 | Concrete sidewalks (5") (531-7002) | SY | 12,141 | $95.00 | $79.00 | $92.00 | $100.00 | $100.00 | $85.00 | $103.16 |
| 49 | Concrete sidewalks (6") (531-7003) | SY | 87 | $98.00 | $108.00 | $100.00 | $120.00 | $95.00 | $131.89 | |
| 50 | Concrete sidewalk (steps) (531-7004) | SY | 2 | $170.00 | $150.00 | $500.00 | $400.00 | $250.00 | $199.04 | |
| 51 | Curb ramps (type 1) (531-7015) | SY | 98 | $250.00 | $220.00 | $180.00 | $250.00 | $260.00 | $180.00 | $131.89 |
| 52 | Curb ramps (type 2) (531-7016) | SY | 70 | $300.00 | $230.00 | $188.80 | $200.00 | $300.00 | $180.00 | $131.89 |
| 53 | Curb ramps (type 3) (531-7017) | SY | 18 | $230.00 | $190.00 | $200.00 | $300.00 | $180.00 | $131.89 | |
| 54 | Curb ramps (type 5) (531-7018) | SY | 33 | $250.00 | $214.00 | $200.00 | $350.00 | $180.00 | $131.89 | |
| 55 | Curb ramps (type 7) (531-7020) | SY | 364 | $200.00 | $210.00 | $216.00 | $300.00 | $300.00 | $180.00 | $131.89 |
| 56 | Curb ramps (type 10) (531-7021) | SY | 471 | $185.00 | $190.00 | $190.70 | $300.00 | $280.00 | $180.00 | $131.89 |
| 57 | Curb ramps (type 21) (531-7023) | SY | 89 | $230.00 | $230.00 | $204.00 | $250.00 | $300.00 | $180.00 | $131.89 |
| 58 | Concrete directional island (536-7004) | SY | 247 | $150.00 | $150.00 | $210.00 | $120.00 | $100.00 | $165.00 | $131.89 |
| 59 | Remove metal beam guard fence (542-7001) | LF | 75 | $7.00 | $2.20 | $5.00 | $10.00 | $1.00 | $27.50 | |
| 60 | Remove terminal anchor section (542-7002) | EACH | 2 | $700.00 | $183.42 | $500.00 | $200.00 | $150.00 | $275.00 | |
| 61 | Relocate existing mailbox (560-7012) | EACH | 10 | $250.00 | $280.00 | $180.00 | $500.00 | $200.00 | $150.00 | $275.00 |
| 62 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 79 | $15.00 | $23.00 | $12.96 | $25.00 | $25.00 | $19.00 | $20.43 |
| 63 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 135 | $20.00 | $26.00 | $26.36 | $30.00 | $30.00 | $23.00 | $25.31 |
| 64 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 143 | $40.00 | $32.00 | $33.96 | $40.00 | $40.00 | $35.00 | $37.95 |
| 65 | Electrical conductor (no.8) bare (620-7007) | LF | 357 | $1.50 | $1.50 | $2.94 | $4.00 | $3.50 | $2.75 | $2.87 |
| 66 | Ground box type C (162911)W/apron (624-7006) | EACH | 4 | $2,000.00 | $2,500.00 | $1,712.61 | $1,800.00 | $1,900.00 | $1,550.00 | $1,690.50 |
| 67 | Aluminum signs (type A) (636-7001) | SF | 4 | $36.00 | $20.00 | $100.00 | $50.00 | $60.00 | $45.00 | $39.15 |
| 68 | Install small roadside sign support and assembly type 10BWG(1)SA(T) (644-7004) | EACH | 1 | $1,200.00 | $684.00 | $1,000.00 | $1,500.00 | $800.00 | $1,139.45 | |
| 69 | Install small roadside sign support and assembly TYS80(1)SA(U) (644-7031) | EACH | 1 | $6,200.00 | $838.00 | $1,000.00 | $1,600.00 | $850.00 | $1,394.80 | |
| 70 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 1 | $1,700.00 | $880.00 | $1,000.00 | $1,600.00 | $800.00 | $1,329.90 | |
| 71 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 10 | $730.00 | $416.00 | $500.00 | $800.00 | $800.00 | $637.04 | |
| 72 | Relocate SM RD SN sup&AM type 10BWG (644-7065) | EACH | 36 | $700.00 | $910.00 | $520.00 | $300.00 | $750.00 | $280.00 | $716.40 |
| 73 | Remove SM RD SN sup&AM (644-7073) | EACH | 15 | $160.00 | $96.00 | $100.00 | $300.00 | $150.00 | $279.40 | |
| 74 | Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004) | EACH | 3 | $95.00 | $141.43 | $25.00 | $300.00 | $35.00 | $82.50 | |
| 75 | Install object marker assembly (OM-3L)(WFLX)GNDHH (658-7269) | EACH | 3 | $100.00 | $715.00 | $200.00 | $300.00 | $50.00 | $82.50 | |
| 76 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 610 | $20.00 | $25.00 | $13.08 | $16.00 | $20.00 | $15.00 | $16.50 |
| 77 | Prefabricated PM type C (W)(36")(yld tri) (668-7111) | EACH | 15 | $100.00 | $170.00 | $36.00 | $120.00 | $50.00 | $35.00 | $110.00 |
| 78 | Eliminating existing PM & markers (24") (677-7008) | LF | 38 | $15.00 | $8.25 | $3.70 | $60.00 | $15.00 | $7.00 | $5.50 |
| 79 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 4 | $850.00 | $780.00 | $646.56 | $1,200.00 | $1,200.00 | $900.00 | $977.90 |
| 80 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,764 | $1.50 | $2.00 | $3.80 | $5.00 | $4.00 | $3.50 | $3.41 |
| 81 | Pedestrian pole assembly (687-7001) | EACH | 4 | $3,000.00 | $4,100.00 | $2,379.84 | $2,000.00 | $2,000.00 | $1,750.00 | $1,871.10 |
| 82 | Pedestrian detect push button (APS) (688-7001) | EACH | 4 | $1,200.00 | $890.00 | $826.82 | $1,000.00 | $1,200.00 | $900.00 | $961.40 |
| 83 | Pedestrian detector controller unit (688-7003) | EACH | 4 | $3,500.00 | $4,400.00 | $3,048.64 | $4,000.00 | $4,000.00 | $3,700.00 | $4,039.20 |
| 84 | Fixed bollards (5005-7002) | EACH | 63 | $1,200.00 | $1,360.00 | $280.00 | $750.00 | $400.00 | $550.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.