TxDOT contract A00197211 bid tabulation
Preventive Maintenance, US 90 (South Mesquite to 0.20 E OF PLUM CREEK). Let by Texas DOT on April 4, 2025, Caldwell, Austin District. 6 bids received; low bid $4,315,552 by Hunter Industries, LTD., -22% against the engineer's estimate of $5,525,420.
- Owner
- Texas DOT
- Letting
- 04 APR 2025
- Pay items
- 35
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hunter Industries, LTD. | $4,315,552 | Low | -22% |
| 2 | Lone Star Paving Company | $4,371,612 | +1.0% | -21% |
| 3 | Texas Materials Group, Inc. | $4,407,125 | +2.0% | -20% |
| 4 | Clark Construction of Texas, Inc. | $4,829,731 | +12% | -13% |
| 5 | Allen Keller Company | $5,587,596 | +29% | +1.0% |
| 6 | Grey Sky Construction LLC | $8,194,478 | +90% | +48% |
Engineer's estimate: $5,525,420.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hunter Industries, LTD. | 2. Lone Star Paving Company | 3. Texas Materials Group, Inc. | 4. Clark Construction of Texas, Inc. | 5. Allen Keller Company | 6. Grey Sky Construction LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Backfill (type A) (134-7001) | STA | 172 | $172.00 | $121.00 | $199.00 | $160.00 | $336.97 | $128.52 | $450.00 |
| 2 | SP mixes SP-D PG76-22 (344-7063) | TON | 10,015 | $150.00 | $100.38 | $114.00 | $94.00 | $136.63 | $118.45 | $165.00 |
| 3 | Tom-C PG76-22 sac-B (347-7002) | TON | 6,859 | $165.00 | $130.35 | $135.00 | $142.00 | $143.33 | $183.76 | $215.00 |
| 4 | Flexible pavement structure repair(6") (351-7005) | SY | 24,276 | $52.50 | $42.54 | $48.25 | $42.50 | $47.32 | $49.22 | $60.00 |
| 5 | Planing asphalt concrete pavement(0" to 3") (354-7033) | SY | 121,382 | $2.42 | $1.93 | $1.96 | $2.35 | $1.75 | $1.71 | $7.00 |
| 6 | Cleaning and sealing existing joints (CL3) (438-7004) | LF | 187 | $55.00 | $50.00 | $44.00 | $50.00 | $50.00 | $48.98 | $100.00 |
| 7 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 187 | $55.00 | $50.00 | $58.00 | $50.00 | $50.00 | $48.98 | $100.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $311,240 | $282,615 | $43,500 | $236,600 | $177,000 | $500,000 | $700,000 |
| 9 | Barricades, signs and traffic handling (502-7001) | MO | 4 | $7,500.00 | $3,874.78 | $2,165.00 | $9,775.00 | $2,500.00 | $9,837.91 | $12,500 |
| 10 | Portable changeable message sign (503-7002) | EACH | 2 | $8,750.00 | $4,600.62 | $6,335.00 | $4,700.00 | $15,000 | $6,568.30 | $20,000 |
| 11 | TMA (stationary) (505-7001) | DAY | 64 | $225.00 | $81.19 | $270.00 | $200.00 | $200.00 | $158.04 | $250.00 |
| 12 | TMA (mobile operation) (505-7003) | DAY | 9 | $300.00 | $541.25 | $850.00 | $150.00 | $400.00 | $969.85 | $550.00 |
| 13 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 13,800 | $0.20 | $0.69 | $0.25 | $0.37 | $0.69 | $0.43 | $0.50 |
| 14 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 11,009 | $0.50 | $0.25 | $0.30 | $0.25 | $0.25 | $0.98 | $1.00 |
| 15 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 109,452 | $0.25 | $0.25 | $0.28 | $0.25 | $0.25 | $0.34 | $1.00 |
| 16 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 300 | $1.00 | $0.35 | $0.50 | $0.34 | $0.35 | $1.96 | $5.00 |
| 17 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 655 | $4.50 | $4.00 | $4.00 | $3.00 | $4.00 | $3.92 | $20.00 |
| 18 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 109,452 | $0.25 | $0.25 | $0.28 | $0.25 | $0.25 | $0.42 | $1.00 |
| 19 | Work zone pavement marking removing (W)6"(broken) (662-7065) | LF | 10,334 | $1.37 | $0.55 | $0.72 | $0.34 | $0.55 | $1.23 | $1.00 |
| 20 | Work zone pavement marking removing (Y)6"(solid) (662-7100) | LF | 41,336 | $1.25 | $0.55 | $0.61 | $0.34 | $0.55 | $0.98 | $1.00 |
| 21 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 3,425 | $1.00 | $1.63 | $2.00 | $1.75 | $1.07 | $2.90 | $6.00 |
| 22 | Work zone pavement marking SHT terminal (tab)type Y (662-7113) | EACH | 2,170 | $2.00 | $1.63 | $2.00 | $1.75 | $1.07 | $2.93 | $6.00 |
| 23 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 300 | $1.60 | $1.25 | $1.00 | $1.60 | $1.25 | $2.94 | $5.00 |
| 24 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 655 | $10.22 | $9.00 | $6.50 | $7.52 | $9.00 | $18.62 | $20.00 |
| 25 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 2 | $192.00 | $200.00 | $150.00 | $160.00 | $200.00 | $342.87 | $250.00 |
| 26 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 2 | $235.00 | $200.00 | $175.00 | $275.00 | $200.00 | $391.86 | $250.00 |
| 27 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 31,636 | $0.80 | $0.85 | $0.96 | $1.33 | $0.85 | $1.23 | $1.00 |
| 28 | Reflectorized pavement marking type I (W)6"(broken)(100MIL) (666-7408) | LF | 12,668 | $0.70 | $0.65 | $0.74 | $0.77 | $0.65 | $0.98 | $1.00 |
| 29 | Reflectorized pavement marking type I (Y)6"(solid)(100MIL) (666-7423) | LF | 44,036 | $0.70 | $0.65 | $0.74 | $0.61 | $0.65 | $0.94 | $1.00 |
| 30 | Reflectorized pavement marker type I-C (672-7002) | EACH | 468 | $5.00 | $7.00 | $5.50 | $6.10 | $7.00 | $6.61 | $6.00 |
| 31 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 276 | $4.00 | $7.00 | $5.50 | $6.10 | $7.00 | $6.61 | $6.00 |
| 32 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 97 | $7.00 | $7.00 | $5.50 | $6.10 | $7.00 | $6.61 | $6.00 |
| 33 | Bonding course (3007-7001) | GAL | 10,925 | $4.50 | $3.25 | $3.35 | $3.70 | $4.00 | $5.38 | $5.00 |
| 34 | Composite geogrid for asphalt overlay (3019-7001) | SY | 121,382 | $4.25 | $4.07 | $3.69 | $3.85 | $4.00 | $5.53 | $10.00 |
| 35 | Tack coat (3019-7002) | GAL | 24,250 | $4.75 | $3.25 | $2.90 | $5.75 | $4.00 | $4.59 | $5.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 4, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.