TxDOT contract A00206337 bid tabulation

Bridge Maintenance, Various (Districtwide to .). Let by Texas DOT on January 7, 2025, Ector, Odessa District. 6 bids received; low bid $1,886,046 by Relmco, Inc., +15% against the engineer's estimate of $1,638,204.

Owner
Texas DOT
Letting
07 JAN 2025
Pay items
45
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Relmco, Inc.$1,886,046Low+15%
2Icos Management, LLC$2,160,771+15%+32%
3SCR Civil Construction, LLC$2,164,554+15%+32%
4FNH Construction, LLC$2,766,788+47%+69%
5Dan Williams Company$2,850,022+51%+74%
6Ti-Zack Concrete, LLC$3,214,974+70%+96%
TxDOT contract A00206337: bids by rank

Engineer's estimate: $1,638,204.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Relmco, Inc.2. Icos Management, LLC3. SCR Civil Construction, LLC4. FNH Construction, LLC5. Dan Williams Company6. Ti-Zack Concrete, LLC
1Removing concrete (appr slab) (104-7030)SY85$126.67$350.00$220.00$157.00$500.00$65.00$216.49
2D-GR HMA type-C PG70-22 (341-7022)TON28.30$300.00$1,500.00$275.00$2,600.00$1,000.00$3,000.00$817.11
3Flowable backfill (401-7001)CY60.33$464.08$300.00$275.00$811.00$500.00$600.00$1,024.08
4Approach slab (422-7013)CY31$786.28$1,500.00$1,100.00$1,445.00$2,500.00$1,500.00$2,031.73
5Blast finish (427-7007)SF13,105$3.00$4.00$12.00$6.00$15.00$1.50$16.97
6Concrete structure repair(deck rep(part depth)) (429-7003)SF293$140.00$250.00$220.00$275.00$650.00$425.00$451.18
7Concrete structure repair(rapid deck rep(PRT DPT) (429-7004)SF10$166.79$350.00$660.00$400.00$1,000.00$675.00$714.61
8Concrete structure repair (vertical & overhead) (429-7007)SF2,438$200.00$175.00$176.00$240.00$225.00$235.00$618.22
9Concrete structure repair (standard) (429-7009)SF20$287.00$200.00$132.00$500.00$500.00$275.00$628.35
10Riprap (concrete)(4 in) (432-7001)CY60$1,074.00$900.00$660.00$1,280.00$650.00$1,200.00$1,991.44
11Cleaning and sealing existing joints (CL7) (438-7007)LF272$65.40$75.00$44.00$70.00$100.00$65.00$60.08
12Header type expansion joint (454-7009)CF52$426.00$750.00$330.00$1,100.00$850.00$1,300.00$443.34
13Joint sealant (454-7010)LF230$1.00$35.00$44.00$60.00$100.00$60.00$27.62
14Set (replace pipe runner) (467-7004)EACH5$5,000.00$4,500.00$1,650.00$3,110.00$14,500$6,000.00$6,500.07
15Mobilization (500-7001)LS1$127,993$165,000$132,000$216,000$200,000$275,000$318,282
16Barricades, signs and traffic handling (502-7001)MO21$12,000$5,500.00$1.00$4,500.00$8,500.00$20,000$2,952.14
17Portable changeable message sign (503-7001)DAY628$90.37$100.00$1.00$75.00$150.00$150.00$10.00
18Portable changeable message sign (503-7002)EACH1$9,954.07$35,000$1.00$7,000.00$20,000$20,000$12,990
19TMA (stationary) (505-7001)DAY381$218.42$250.00$1.00$225.00$250.00$300.00$25.00
20TMA (mobile operation) (505-7003)DAY3$115.43$250.00$440.00$1,500.00$550.00$675.00$235.00
21Portable concrete traffic barrier (furnish and install)(single slope)(type 1) (512-7001)LF900$60.00$40.00$66.00$107.00$120.00$90.00$116.37
22Portable concrete traffic barrier (move)(single slope)(type 1) (512-7025)LF450$5.89$80.00$44.00$50.00$30.00$10.00$27.86
23Concrete curb (type II) (529-7002)LF25$17.57$100.00$110.00$120.00$150.00$150.00$152.98
24Crash cushion attenuator (move & reset) (545-7002)EACH1$1,798.76$1,500.00$11,000$5,000.00$8,500.00$1,000.00$3,290.87
25Crash cushion attenuator (remove) (545-7004)EACH1$1,323.12$1,500.00$11,000$5,000.00$3,500.00$1,200.00$3,250.10
26Cca (install)(N)(TL3)(work zone) (545-7018)EACH1$9,740.06$15,000$38,500$12,000$30,000$20,000$9,756.01
27Work zone pavement marking removing (W)6"(broken) (662-7065)LF175$1.40$2.75$3.00$2.78$6.00$2.45$2.43
28Work zone pavement marking removing (W)6"(lane drop) (662-7067)LF250$1.18$3.30$3.00$2.87$6.00$2.55$2.51
29Work zone pavement marking removing (W)6"(solid) (662-7068)LF7,299$1.15$1.93$3.00$2.44$3.00$2.15$2.13
30Work zone pavement marking removing (Y)6"(solid) (662-7100)LF6,975$1.30$1.93$3.00$2.44$3.00$2.15$2.13
31Reflectorized pavement marking type II (W) 6" (broken) (666-7172)LF1,154$0.17$1.65$3.00$0.40$3.00$0.35$0.35
32Reflectorized pavement marking type II (W) 6" (solid) (666-7175)LF5,028$0.17$1.65$3.00$0.32$3.00$0.30$0.28
33Reflectorized pavement marking type II (W) 8" (solid) (666-7179)LF308$0.26$1.65$3.00$0.69$6.00$0.60$0.60
34Reflectorized pavement marking type II (Y) 6" (solid) (666-7213)LF4,610$0.17$1.65$3.00$0.32$3.00$0.30$0.28
35Pavement sler 6" (666-7347)LF10,792$0.23$0.88$3.00$0.46$3.00$0.40$0.40
36Pavement sler 8" (666-7348)LF308$0.25$0.99$3.00$0.69$3.00$0.60$0.60
37Eliminating existing PM & markers (6") (677-7002)LF10,792$0.48$1.10$3.00$0.74$3.00$0.65$0.65
38Eliminating existing PM & markers (8") (677-7004)LF308$0.68$1.65$3.00$1.04$3.00$0.95$0.91
39Pothole repair(standard)(0"-5" deep) (700-7001)SY5$210.00$1,500.00$440.00$1,700.00$1,000.00$1,750.00$487.00
40Concrete rail repair (miscellaneous) (778-7002)LF1,741$80.00$175.00$495.00$140.00$200.00$315.00$142.19
41CNC crack repair (discrete)(inject) (780-7002)LF160$180.47$75.00$88.00$210.00$300.00$140.00$205.11
42Concrete CRCK repair(discrete)(rout and seal) (780-7003)LF73$115.52$150.00$88.00$50.00$200.00$190.00$229.35
43Bridge joint repair (full depth) (785-7007)LF8$449.33$500.00$440.00$1,250.00$1,500.00$1,100.00$832.37
44Temporary Q-detect (type 2) (1 sys) (6069-7001)DAY134$150.00$300.00$1.00$200.00$250.00$300.00$388.47
45Bent cap/abutment cap cleaning (7001-7002)EACH25$1,288.24$1,200.00$1,100.00$2,600.00$2,500.00$800.00$698.07
TxDOT contract A00206337: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy