TxDOT contract A00206489 bid tabulation
Hazard Elimination & Safety, FM 531 (US 90A to 3 Mi S of US 90A). Let by Texas DOT on April 7, 2026, Lavaca, Yoakum District. 3 bids received; low bid $2,566,089 by Hunter Industries, LTD., +18% against the engineer's estimate of $2,177,688.
- Owner
- Texas DOT
- Letting
- 07 APR 2026
- Pay items
- 115
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Hunter Industries, LTD. | $2,566,089 | Low | +18% |
| 2 | E-Z Bel Construction, LLC | $2,954,412 | +15% | +36% |
| 3 | Acme Bridge Company, Inc. | $3,436,733 | +34% | +58% |
Engineer's estimate: $2,177,688.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Hunter Industries, LTD. | 2. E-Z Bel Construction, LLC | 3. Acme Bridge Company, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Preparing row (100-7002) | STA | 9.90 | $1,100.00 | $1,587.44 | $6,900.00 | $1,580.00 |
| 2 | Excavation (roadway) (110-7001) | CY | 366 | $11.00 | $23.10 | $22.00 | $56.70 |
| 3 | Subgr widen (OC) (112-7001) | STA | 157.98 | $185.00 | $440.00 | $200.00 | $445.00 |
| 4 | Embankment (vehicle)(OC)(type C) (132-7017) | CY | 343 | $30.00 | $30.80 | $13.50 | $78.60 |
| 5 | Backfill (type A) (134-7001) | STA | 152.28 | $180.00 | $121.00 | $180.00 | $254.00 |
| 6 | Blading (150-7002) | HR | 25 | $86.00 | $110.00 | $158.00 | $85.80 |
| 7 | Broadcast seed (temporary_warm) (164-7005) | SY | 230 | $0.30 | $0.20 | $4.00 | $4.30 |
| 8 | Broadcast seed (temporary_cool) (164-7006) | SY | 230 | $0.30 | $0.20 | $4.00 | $4.30 |
| 9 | Drill seed (permanent_rural_clay) (164-7010) | SY | 52,660 | $0.30 | $0.31 | $0.20 | $0.17 |
| 10 | Drill seed (temporary_warm) (164-7013) | SY | 13,165 | $0.30 | $0.26 | $0.25 | $0.23 |
| 11 | Drill seed (temporary_cool) (164-7014) | SY | 13,165 | $0.30 | $0.26 | $0.25 | $0.23 |
| 12 | Vegetative watering (168-7001) | TGL | 443.26 | $26.00 | $23.10 | $60.00 | $49.80 |
| 13 | FL BS (compacted in place)(tye GR1-2)(final pos) (247-7193) | CY | 78 | $75.00 | $93.50 | $120.00 | $211.00 |
| 14 | Aggregate (type-PE, GR-4)(sac-B) (316-7232) | CY | 383 | $120.00 | $121.42 | $300.00 | $383.00 |
| 15 | Asphalt (AC 20-5TR or AC-20XP or CRS-2P) (316-7264) | GAL | 16,910 | $2.75 | $4.56 | $4.00 | $9.00 |
| 16 | D-GR HMA type-B sac-B PG64-22 (341-7002) | TON | 3,862 | $83.00 | $94.60 | $144.00 | $131.00 |
| 17 | D-GR HMA type-B PG64-22 (level-UP) (341-7004) | TON | 500 | $100.00 | $94.60 | $135.00 | $131.00 |
| 18 | D-GR HMA type D sac-B PG70-22 (341-7050) | TON | 6,062 | $93.50 | $102.43 | $115.00 | $124.00 |
| 19 | Tack coat (341-7082) | GAL | 1,170 | $4.50 | $3.52 | $3.50 | $3.75 |
| 20 | Flexible pavement structure repair(8") (351-7007) | SY | 1,000 | $40.00 | $62.92 | $70.00 | $75.30 |
| 21 | Cut & restoring pavement (400-7006) | SY | 14 | $350.00 | $252.00 | $280.00 | $105.00 |
| 22 | Cut and restore pavement (flex base) (400-7009) | SY | 15 | $200.00 | $56.00 | $45.00 | $105.00 |
| 23 | Cem stabil BKFL (400-7010) | CY | 113 | $168.00 | $224.00 | $280.00 | $171.00 |
| 24 | Temporary special shoring (403-7001) | SF | 256 | $15.00 | $56.00 | $30.00 | $25.50 |
| 25 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 20 | $275.00 | $158.90 | $275.00 | $302.00 |
| 26 | Riprap (concrete)(5 in) (432-7002) | CY | 9 | $620.00 | $952.01 | $600.00 | $571.00 |
| 27 | Riprap (concrete)(CL B) (432-7005) | CY | 0.70 | $1,260.00 | $1,064.01 | $600.00 | $612.79 |
| 28 | Riprap (stone protection)(12 in) (432-7041) | CY | 48 | $200.00 | $200.77 | $270.00 | $158.00 |
| 29 | Retrofit rail (type T131RC) (451-7049) | LF | 440 | $185.00 | $218.00 | $205.00 | $226.00 |
| 30 | CMP (gal steel 12 in) (460-7001) | LF | 8 | $165.00 | $50.40 | $60.00 | $95.90 |
| 31 | CMP (gal steel 18 in) (460-7003) | LF | 28 | $120.00 | $61.60 | $65.00 | $123.00 |
| 32 | CMP (gal steel 24 in) (460-7005) | LF | 24 | $160.00 | $145.60 | $70.00 | $148.00 |
| 33 | CMP (gal steel 30 in) (460-7007) | LF | 8 | $125.00 | $218.40 | $85.00 | $158.00 |
| 34 | CMP (gal steel 42 in) (460-7010) | LF | 16 | $125.00 | $280.00 | $95.00 | $184.00 |
| 35 | CMP AR (gal steel des 1) (460-7015) | LF | 8 | $120.00 | $224.00 | $68.00 | $129.00 |
| 36 | CMP AR (gal steel des 3) (460-7018) | LF | 12 | $105.00 | $392.00 | $78.00 | $139.00 |
| 37 | Concrete box culvert (4 FT X 2 FT) (462-7003) | LF | 33 | $270.00 | $672.00 | $530.00 | $758.00 |
| 38 | Concrete box culvert (6 FT X 2 FT) (462-7010) | LF | 19 | $370.00 | $840.01 | $860.00 | $825.00 |
| 39 | Concrete box culvert (7 FT X 3 FT) (462-7015) | LF | 21 | $975.00 | $952.01 | $1,500.00 | $1,080.00 |
| 40 | Concrete box culvert (10 FT X 4 FT) (462-7032) | LF | 11 | $950.00 | $1,344.01 | $1,650.00 | $1,390.00 |
| 41 | Concrete box culvert (10 FT X 6 FT) (462-7034) | LF | 11 | $1,150.00 | $1,568.01 | $2,050.00 | $1,530.00 |
| 42 | RC pipe (CL III)(24 in) (464-7005) | LF | 53 | $140.00 | $156.80 | $82.00 | $131.00 |
| 43 | RC pipe (CL III)(30 in) (464-7007) | LF | 84 | $225.00 | $224.00 | $110.00 | $179.00 |
| 44 | RC pipe (CL III)(42 in) (464-7010) | LF | 10 | $280.00 | $392.00 | $200.00 | $267.00 |
| 45 | Wingwall (PW - 2) (HW=5 FT) (466-7189) | EACH | 1 | $17,000 | $15,680 | $26,500 | $19,600 |
| 46 | Wingwall (PW - 2) (HW=7 FT) (466-7191) | EACH | 1 | $17,500 | $33,600 | $32,000 | $26,400 |
| 47 | Set (type I)(S= 4 FT)(HW= 3 FT)(3:1)(C) (467-7067) | EACH | 2 | $9,800.00 | $10,080 | $9,000.00 | $9,800.00 |
| 48 | Set (type I)(S= 4 FT)(HW= 3 FT)(4:1)(C) (467-7068) | EACH | 2 | $8,000.00 | $10,640 | $9,750.00 | $9,830.00 |
| 49 | Set (type I)(S= 6 FT)(HW= 3 FT)(3:1)(C) (467-7124) | EACH | 1 | $7,000.00 | $14,560 | $10,500 | $9,990.00 |
| 50 | Set (type I)(S= 6 FT)(HW= 3 FT)(4:1)(C) (467-7125) | EACH | 1 | $11,120 | $16,800 | $11,500 | $10,500 |
| 51 | Set (type I)(S= 7 FT)(HW= 4 FT)(3:1)(C) (467-7153) | EACH | 1 | $7,900.00 | $19,040 | $14,200 | $10,900 |
| 52 | Set (type I)(S= 7 FT)(HW= 4 FT)(4:1)(C) (467-7154) | EACH | 1 | $10,000 | $21,280 | $15,700 | $13,800 |
| 53 | Set (type I)(S= 7 FT)(HW= 4 FT)(6:1)(P) (467-7156) | EACH | 4 | $12,000 | $2,464.02 | $11,700 | $20,400 |
| 54 | Set (type II) (12 in) (CMP) (6: 1) (P) (467-7288) | EACH | 2 | $1,500.00 | $952.01 | $1,100.00 | $1,450.00 |
| 55 | Set (type II) (18 in) (CMP) (6: 1) (P) (467-7304) | EACH | 8 | $1,200.00 | $1,120.01 | $1,200.00 | $1,790.00 |
| 56 | Set (type II) (24 in) (CMP) (6: 1) (P) (467-7324) | EACH | 4 | $1,300.00 | $2,800.02 | $1,350.00 | $2,070.00 |
| 57 | Set (type II) (24 in) (RCP) (3: 1) (C) (467-7325) | EACH | 3 | $1,700.00 | $2,240.01 | $1,950.00 | $2,270.00 |
| 58 | Set (type II) (24 in) (RCP) (4: 1) (C) (467-7326) | EACH | 1 | $2,000.00 | $2,240.01 | $1,950.00 | $2,420.00 |
| 59 | Set (type II) (30 in) (CMP) (6: 1) (P) (467-7344) | EACH | 2 | $2,000.00 | $3,920.03 | $1,500.00 | $2,750.00 |
| 60 | Set (type II) (30 in) (RCP) (6: 1) (P) (467-7348) | EACH | 6 | $3,000.00 | $3,920.03 | $3,350.00 | $3,820.00 |
| 61 | Set (type II) (42 in) (CMP) (6: 1) (P) (467-7376) | EACH | 2 | $4,000.00 | $5,040.03 | $3,750.00 | $5,380.00 |
| 62 | Set (type II) (42 in) (RCP) (3: 1) (C) (467-7377) | EACH | 2 | $5,000.00 | $4,480.03 | $4,400.00 | $6,060.00 |
| 63 | Set (type II) (des 1) (CMP) (6: 1) (P) (467-7414) | EACH | 2 | $1,600.00 | $1,120.01 | $1,175.00 | $2,380.00 |
| 64 | Set (type II) (des 3) (CMP) (6: 1) (P) (467-7430) | EACH | 2 | $1,800.00 | $2,800.02 | $1,250.00 | $2,380.00 |
| 65 | Removing structure (small) (496-7036) | EACH | 3 | $1,200.00 | $1,120.01 | $861.00 | $936.00 |
| 66 | Mobilization (500-7001) | LS | 1 | $175,000 | $189,216 | $285,000 | $304,000 |
| 67 | Barricades, signs and traffic handling (502-7001) | MO | 7 | $2,500.00 | $9,972.13 | $2,050.00 | $32,500 |
| 68 | Portable changeable message sign (503-7002) | EACH | 2 | $5,000.00 | $3,603.65 | $7,500.00 | $17,000 |
| 69 | TMA (stationary) (505-7001) | DAY | 20 | $300.00 | $128.70 | $255.00 | $248.00 |
| 70 | TMA (mobile operation) (505-7003) | DAY | 20 | $320.00 | $308.88 | $500.00 | $399.00 |
| 71 | Rock filter dams (install) (type 1) (506-7001) | LF | 160 | $30.00 | $56.73 | $55.00 | $59.40 |
| 72 | Rock filter dams (remove) (506-7011) | LF | 160 | $6.00 | $21.82 | $12.00 | $13.00 |
| 73 | Temporary sediment control fence (install) (506-7039) | LF | 1,350 | $4.00 | $4.31 | $4.00 | $4.05 |
| 74 | Temporary sediment control fence (remove) (506-7041) | LF | 1,350 | $1.50 | $1.36 | $1.25 | $1.30 |
| 75 | Driveways (ACP) (530-7010) | SY | 1,380 | $46.00 | $44.00 | $20.00 | $21.50 |
| 76 | Mill rumble strips (asphalt) (centerline) (533-7002) | LF | 15,998 | $0.40 | $0.41 | $0.50 | $0.43 |
| 77 | Metal W-beam guard fence (timber post) (540-7001) | LF | 600 | $29.00 | $24.82 | $28.00 | $28.40 |
| 78 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 4 | $2,300.00 | $1,975.66 | $2,100.00 | $1,620.00 |
| 79 | Remove metal beam guard fence (542-7001) | LF | 100 | $2.00 | $2.53 | $3.50 | $4.35 |
| 80 | Guardrail end treatment (install) (544-7001) | EACH | 4 | $3,000.00 | $3,140.79 | $3,100.00 | $3,580.00 |
| 81 | Guardrail end treatment (remove) (544-7003) | EACH | 4 | $180.00 | $253.29 | $275.00 | $272.00 |
| 82 | Wire fence (type A) (552-7001) | LF | 100 | $5.00 | $30.39 | $30.00 | $35.60 |
| 83 | Wire fence (water gap) (552-7010) | LF | 48 | $40.00 | $65.86 | $65.00 | $33.30 |
| 84 | Mailbox install-S (WC-post) type 3 (560-7004) | EACH | 10 | $165.00 | $400.00 | $231.00 | $419.00 |
| 85 | In RD IL (type SA) 50T-10 (400W EQ) LED (610-7198) | EACH | 2 | $5,000.00 | $6,839.73 | $8,855.00 | $7,840.00 |
| 86 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 260 | $15.00 | $17.21 | $21.57 | $18.10 |
| 87 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 110 | $25.00 | $25.98 | $39.50 | $20.50 |
| 88 | Electrical conductor (no.10) bare (620-7005) | LF | 30 | $2.00 | $2.21 | $1.10 | $1.15 |
| 89 | Electrical conductor (no.10) insulated (620-7006) | LF | 90 | $2.00 | $2.45 | $1.00 | $1.65 |
| 90 | Electrical conductor (no.8) bare (620-7007) | LF | 340 | $2.00 | $2.57 | $1.30 | $1.70 |
| 91 | Electrical conductor (no.8) insulated (620-7008) | LF | 680 | $2.50 | $2.76 | $1.00 | $1.85 |
| 92 | Ground box type A (122311)W/apron (624-7002) | EACH | 4 | $1,300.00 | $1,469.70 | $1,250.00 | $1,520.00 |
| 93 | Elc SRV type D 120/240 060(NS)SS(E)SP(O) (628-7148) | EACH | 1 | $8,650.00 | $12,438 | $9,800.00 | $7,000.00 |
| 94 | Aluminum signs (type A) (636-7001) | SF | 24 | $35.00 | $20.00 | $23.00 | $41.90 |
| 95 | Install small roadside sign support and assembly type 10BWG(1)SA(P) (644-7001) | EACH | 3 | $665.00 | $675.00 | $280.00 | $708.00 |
| 96 | Install small roadside sign support and assembly TYS80(1)SA(U-1EXT) (644-7032) | EACH | 3 | $1,450.00 | $800.00 | $1,055.00 | $839.00 |
| 97 | Install small roadside sign support and assembly tytwt(1)WS(P) (644-7057) | EACH | 48 | $400.00 | $400.00 | $305.00 | $419.00 |
| 98 | Install small roadside sign support and assembly tytwt(1)WS(T) (644-7058) | EACH | 2 | $495.00 | $475.00 | $370.00 | $498.00 |
| 99 | Remove SM RD SN sup&AM (644-7073) | EACH | 56 | $90.00 | $100.00 | $75.00 | $105.00 |
| 100 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 10 | $28.00 | $25.00 | $18.00 | $26.20 |
| 101 | Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019) | EACH | 20 | $38.00 | $25.00 | $22.00 | $26.20 |
| 102 | Install object marker assembly (OM-2Y)(WC)GND(BI) (658-7057) | EACH | 16 | $75.00 | $100.00 | $108.00 | $105.00 |
| 103 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 95,994 | $0.19 | $0.28 | $0.25 | $0.26 |
| 104 | Work zone pavement marking non-removing (Y)6"(broken) (662-7036) | LF | 6,192 | $0.19 | $0.28 | $0.25 | $0.26 |
| 105 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 62,745 | $0.19 | $0.28 | $0.25 | $0.26 |
| 106 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 4,998 | $1.10 | $1.60 | $1.50 | $1.05 |
| 107 | Reflectorized profile pavement marking type I(W)6"(solid)(090MIL) (666-7265) | LF | 31,998 | $0.65 | $0.86 | $0.80 | $0.82 |
| 108 | Type I high perf PM (Y)6"(broken)(100MIL) (666-7302) | LF | 2,064 | $1.25 | $0.86 | $0.80 | $0.82 |
| 109 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 20,915 | $1.00 | $0.86 | $0.80 | $0.82 |
| 110 | PRFB rumble strip (BLK)(4')(transverse) (668-7001) | LF | 80 | $17.50 | $38.54 | $35.00 | $36.70 |
| 111 | Prefabricated PM type C (W)(24")(solid) (668-7089) | LF | 12 | $15.00 | $16.51 | $15.00 | $15.70 |
| 112 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 366 | $6.00 | $6.06 | $5.50 | $5.80 |
| 113 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 2 | $350.00 | $515.62 | $382.00 | $434.00 |
| 114 | Install RDSD flash beacon assembly (685-7001) | EACH | 1 | $5,000.00 | $6,184.96 | $7,996.00 | $7,240.00 |
| 115 | TMSP radar speed control monitor (6025-7001) | EACH | 2 | $6,000.00 | $5,148.07 | $8,481.00 | $25,200 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 7, 2026. Compiled by Mirage Metrics.