TxDOT contract A00209952 bid tabulation
BRIDGE PREVENTATIVE MAINTENANCE, IH0040 (Various Locations- See Plan Sheets to Various Locations-See Plan Sheets). Let by Texas DOT on June 5, 2025, Potter, Amarillo District. 8 bids received; low bid $1,052,830 by Pathfield Investments LLC, -19% against the engineer's estimate of $1,301,967.
- Owner
- Texas DOT
- Letting
- 05 JUN 2025
- Pay items
- 24
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Pathfield Investments LLC | $1,052,830 | Low | -19% |
| 2 | PBX Bridge Company | $1,073,741 | +2.0% | -18% |
| 3 | Built Right Construction of Oklahoma, LLC | $1,187,016 | +13% | -9.0% |
| 4 | Gibson & Associates, Inc. | $1,194,269 | +13% | -8.0% |
| 5 | Emc Construction Services Inc. | $1,277,719 | +21% | -2.0% |
| 6 | Structural Integrity Group LLC | $1,384,121 | +31% | +6.0% |
| 7 | The Truesdell Corporation | $1,569,569 | +49% | +21% |
| 8 | Ti-Zack Concrete, LLC | $1,721,385 | +64% | +32% |
Engineer's estimate: $1,301,967.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Pathfield Investments LLC | 2. PBX Bridge Company | 3. Built Right Construction of Oklahoma, LLC | 4. Gibson & Associates, Inc. | 5. Emc Construction Services Inc. | 6. Structural Integrity Group LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Epoxy waterproof finish (type X) (427-7005) | SF | 4,120 | $14.50 | $20.00 | $10.00 | $15.00 | $13.80 | $12.50 | $12.00 |
| 2 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 27 | $300.00 | $298.00 | $145.00 | $300.00 | $725.00 | $350.00 | $1,020.00 |
| 3 | Cleaning and sealing existing joints (438-7001) | LF | 997 | $64.00 | $68.00 | $96.00 | $50.00 | $76.00 | $112.00 | $62.00 |
| 4 | Multi-layer polymer overlay (439-7014) | SY | 11,368 | $64.00 | $37.00 | $43.00 | $50.00 | $42.50 | $35.70 | $43.25 |
| 5 | Header type expansion joint (454-7009) | CF | 9.60 | $575.00 | $1,000.00 | $550.00 | $500.00 | $2,300.00 | $1,184.00 | $1,150.00 |
| 6 | Joint sealant (454-7010) | LF | 92 | $45.00 | $30.00 | $138.00 | $50.00 | $148.00 | $193.00 | $100.00 |
| 7 | Shot blasting (483-7016) | SY | 11,368 | $11.00 | $7.00 | $3.75 | $3.60 | $7.00 | $2.00 | $5.00 |
| 8 | Mobilization (500-7001) | LS | 1 | $100,000 | $100,000 | $147,560 | $100,000 | $179,000 | $289,035 | $145,000 |
| 9 | Barricades, signs and traffic handling (502-7004) | EACH | 11 | $4,000.00 | $6,000.00 | $2,509.50 | $2,000.00 | $6,200.00 | $10,000 | $16,950 |
| 10 | TMA (stationary) (505-7001) | DAY | 94 | $200.00 | $250.00 | $390.00 | $100.00 | $50.00 | $100.00 | $250.00 |
| 11 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 3,360 | $0.50 | $0.40 | $0.95 | $1.20 | $0.58 | $0.95 | $1.40 |
| 12 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 9,170 | $0.50 | $0.40 | $0.95 | $1.20 | $0.58 | $0.95 | $1.40 |
| 13 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 24,442 | $0.50 | $0.45 | $0.95 | $1.20 | $0.58 | $0.95 | $1.40 |
| 14 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 583 | $2.00 | $2.90 | $1.00 | $0.01 | $2.50 | $2.00 | $2.50 |
| 15 | Work zone pavement marking SHT terminal (tab)type Y-2 (662-7114) | EACH | 583 | $2.00 | $2.00 | $1.00 | $0.50 | $2.50 | $2.00 | $2.50 |
| 16 | Pavement sler 6" (666-7347) | LF | 28,536 | $0.50 | $0.40 | $0.72 | $0.80 | $0.35 | $0.72 | $1.50 |
| 17 | Reflectorized pavement marking type I (W)6"(broken)(090MIL) (666-7407) | LF | 4,319 | $1.00 | $0.90 | $1.75 | $2.00 | $1.09 | $1.75 | $2.50 |
| 18 | Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410) | LF | 7,160 | $1.00 | $0.65 | $1.75 | $2.00 | $1.09 | $1.75 | $2.50 |
| 19 | Reflectorized pavement marking type I (Y)6"(broken)(090MIL) (666-7419) | LF | 890 | $1.00 | $2.00 | $1.75 | $2.00 | $1.09 | $1.75 | $2.50 |
| 20 | Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422) | LF | 16,726 | $1.00 | $0.70 | $1.75 | $2.00 | $0.98 | $1.75 | $2.50 |
| 21 | Eliminating existing PM & markers (6") (677-7002) | LF | 18,606 | $0.50 | $0.70 | $1.25 | $1.50 | $0.98 | $1.25 | $2.25 |
| 22 | Bridge joint repair (armor) (785-7004) | LF | 17 | $775.00 | $600.00 | $950.00 | $650.00 | $1,900.00 | $1,520.00 | $1,900.00 |
| 23 | Concrete beam repair (788-7001) | EACH | 20 | $2,300.00 | $4,500.00 | $850.00 | $6,500.00 | $2,950.00 | $2,819.00 | $3,225.00 |
| 24 | Concrete beam repair (CFRP) (788-7002) | EACH | 3 | $4,200.00 | $9,000.00 | $2,500.00 | $7,500.00 | $6,000.00 | $8,193.00 | $4,250.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of June 5, 2025. Compiled by Mirage Metrics.