TxDOT contract A00210101 bid tabulation
TRAFFIC SIGNAL MAINTENANCE, IH0035 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT). Let by Texas DOT on April 3, 2025, Travis, Austin District. 2 bids received; low bid $917,361 by Austin Traffic Signal Construction Co., Inc., -24% against the engineer's estimate of $1,199,974.
- Owner
- Texas DOT
- Letting
- 03 APR 2025
- Pay items
- 184
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Traffic Signal Construction Co., Inc. | $917,361 | Low | -24% |
| 2 | E-Z Bel Construction, LLC | $1,586,702 | +73% | +32% |
Engineer's estimate: $1,199,974.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Traffic Signal Construction Co., Inc. | 2. E-Z Bel Construction, LLC |
|---|---|---|---|---|---|---|
| 1 | Furn & place topsoil (4") (160-7002) | SY | 100 | $10.00 | $10.00 | $7.00 |
| 2 | Broadcast seed (permanent_urban_clay) (164-7004) | SY | 100 | $5.00 | $5.00 | $1.00 |
| 3 | Vegetative watering (168-7001) | TGL | 2 | $50.00 | $50.00 | $500.00 |
| 4 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 40 | $250.00 | $125.00 | $620.00 |
| 5 | Mobilization (callout 1) (500-7003) | EACH | 38 | $2,500.00 | $1,500.00 | $5,000.00 |
| 6 | Mobilization (callout 2) (500-7004) | EACH | 17 | $3,500.00 | $2,000.00 | $7,500.00 |
| 7 | Mobilization (emergency) (500-7033) | EACH | 22 | $6,000.00 | $5,000.00 | $7,500.00 |
| 8 | Portable changeable message sign (503-7002) | EACH | 5 | $5,000.00 | $1,000.00 | $1,000.00 |
| 9 | TMA (stationary) (505-7001) | DAY | 10 | $200.00 | $300.00 | $350.00 |
| 10 | TMA (mobile operation) (505-7002) | HR | 20 | $500.00 | $100.00 | $350.00 |
| 11 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 300 | $4.00 | $5.00 | $1.00 |
| 12 | Biodegradable erosion control logs (remove) (506-7046) | LF | 300 | $0.50 | $2.00 | $1.00 |
| 13 | Concrete curb (mono) (type II) (529-7007) | LF | 10 | $250.00 | $250.00 | $50.00 |
| 14 | Concrete directional island (536-7004) | SY | 6 | $500.00 | $400.00 | $150.00 |
| 15 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 300 | $26.00 | $15.00 | $20.00 |
| 16 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 200 | $36.00 | $30.00 | $25.00 |
| 17 | Conduit (PVC) (schedule 40) (3") (618-7036) | LF | 300 | $28.00 | $20.00 | $25.00 |
| 18 | Conduit (PVC) (schedule 40) (3") (bore) (618-7037) | LF | 300 | $45.00 | $33.00 | $30.00 |
| 19 | Conduit (PVC) (schedule 40) (4") (618-7040) | LF | 100 | $30.00 | $20.00 | $35.00 |
| 20 | Conduit (PVC) (schedule 40) (4") (bore) (618-7041) | LF | 100 | $45.00 | $35.00 | $40.00 |
| 21 | Conduit (PVC) (schedule 80) (2") (618-7054) | LF | 100 | $30.00 | $25.00 | $22.00 |
| 22 | Conduit (PVC) (schedule 80) (2") (bore) (618-7055) | LF | 100 | $37.00 | $35.00 | $27.00 |
| 23 | Conduit (PVC) (schedule 80) (2") (bore)(rock) (618-7056) | LF | 100 | $44.00 | $40.00 | $40.00 |
| 24 | Conduit (PVC) (schedule 80) (3") (618-7060) | LF | 100 | $21.00 | $20.00 | $27.00 |
| 25 | Conduit (PVC) (schedule 80) (3") (bore) (618-7061) | LF | 100 | $40.00 | $45.00 | $32.00 |
| 26 | Conduit (PVC) (schedule 80) (3") (bore)(rock) (618-7062) | LF | 100 | $45.00 | $53.00 | $45.00 |
| 27 | Conduit (PVC) (schedule 80) (4") (618-7064) | LF | 100 | $22.00 | $25.00 | $32.76 |
| 28 | Conduit (PVC) (schedule 80) (4") (bore) (618-7065) | LF | 100 | $55.00 | $55.00 | $37.34 |
| 29 | Electrical conductor (no.14) bare (620-7001) | LF | 100 | $2.00 | $2.00 | $3.50 |
| 30 | Electrical conductor (no.14) insulated (620-7002) | LF | 100 | $2.00 | $2.00 | $3.50 |
| 31 | Electrical conductor (no.12) bare (620-7003) | LF | 100 | $2.00 | $2.00 | $3.50 |
| 32 | Electrical conductor (no.12) insulated (620-7004) | LF | 100 | $2.00 | $2.00 | $3.50 |
| 33 | Electrical conductor (no.10) bare (620-7005) | LF | 100 | $2.00 | $2.00 | $3.50 |
| 34 | Electrical conductor (no.10) insulated (620-7006) | LF | 100 | $2.00 | $2.00 | $3.50 |
| 35 | Electrical conductor (no.8) bare (620-7007) | LF | 9,000 | $1.20 | $1.00 | $4.00 |
| 36 | Electrical conductor (no.8) insulated (620-7008) | LF | 11,000 | $1.55 | $1.00 | $4.00 |
| 37 | Electrical conductor (no.6) bare (620-7009) | LF | 800 | $1.85 | $1.00 | $4.00 |
| 38 | Electrical conductor (no.6) insulated (620-7010) | LF | 1,600 | $2.25 | $2.00 | $4.00 |
| 39 | Electrical conductor (no.4) bare (620-7011) | LF | 100 | $3.00 | $2.00 | $5.00 |
| 40 | Electrical conductor (no.4) insulated (620-7012) | LF | 100 | $3.75 | $3.00 | $5.00 |
| 41 | Electrical conductor (no.2) bare (620-7015) | LF | 100 | $4.00 | $3.00 | $7.00 |
| 42 | Electrical conductor (no.2) insulated (620-7016) | LF | 100 | $5.00 | $4.00 | $7.00 |
| 43 | Ground box type A (122311)W/apron (624-7002) | EACH | 10 | $1,750.00 | $900.00 | $2,500.00 |
| 44 | Ground box type C (162911)W/apron (624-7006) | EACH | 10 | $1,500.00 | $1,100.00 | $2,500.00 |
| 45 | Ground box type D (162922)W/apron (624-7008) | EACH | 10 | $2,300.00 | $1,600.00 | $2,500.00 |
| 46 | Zinc-coat steel wire strand (1/4") (625-7002) | LF | 1,500 | $3.00 | $1.00 | $5.00 |
| 47 | Zinc-coat steel wire strand (3/8") (625-7004) | LF | 1,500 | $4.00 | $1.00 | $5.00 |
| 48 | Install small roadside sign support and assembly type 10BWG(1)SA(U) (644-7007) | EACH | 2 | $900.00 | $900.00 | $2,400.00 |
| 49 | Reflectorized pavement marking type I (W)4"(DOT)(100MIL) (666-7003) | LF | 220 | $4.00 | $8.00 | $1.70 |
| 50 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 100 | $6.00 | $15.00 | $2.00 |
| 51 | Reflectorized pavement marking type I (W)8"(DOT)(100MIL) (666-7018) | LF | 100 | $3.00 | $15.00 | $2.30 |
| 52 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 300 | $3.00 | $11.00 | $2.30 |
| 53 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 275 | $8.00 | $16.00 | $5.00 |
| 54 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 200 | $16.00 | $31.00 | $10.00 |
| 55 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 4 | $300.00 | $440.00 | $200.00 |
| 56 | Reflectorized pavement marking type I(W)(double arrow)(100MIL) (666-7045) | EACH | 4 | $400.00 | $440.00 | $275.00 |
| 57 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 4 | $500.00 | $480.00 | $225.00 |
| 58 | Reflectorized pavement marking type II (W) 8" (solid) (666-7179) | LF | 150 | $1.00 | $5.00 | $1.40 |
| 59 | Reflectorized pavement marking type II (W) 24" (solid) (666-7184) | LF | 100 | $12.00 | $9.00 | $8.00 |
| 60 | Reflectorized pavement marking type II (Y) 4" (solid) (666-7210) | LF | 400 | $2.00 | $4.00 | $0.70 |
| 61 | Reflectorized pavement marking type II (Y) 6" (solid) (666-7213) | LF | 100 | $4.00 | $10.00 | $0.90 |
| 62 | Reflectorized profile pavement marking type I(W)4"(solid)(100MIL) (666-7264) | LF | 500 | $1.00 | $11.00 | $4.00 |
| 63 | Reflectorized profile pavement marking type I(W)6"(solid)(100MIL) (666-7266) | LF | 100 | $3.00 | $22.00 | $4.00 |
| 64 | Reflectorized profile pavement marking type I(Y)4"(solid)(100MIL) (666-7268) | LF | 250 | $1.00 | $11.00 | $4.00 |
| 65 | Reflectorized profile pavement marking type I(Y)6"(solid)(100MIL) (666-7270) | LF | 100 | $3.00 | $22.00 | $4.00 |
| 66 | Pavement sler (arrow) (666-7353) | EACH | 2 | $140.00 | $190.00 | $40.00 |
| 67 | Pavement sler (word) (666-7354) | EACH | 1 | $145.00 | $225.00 | $40.00 |
| 68 | Reflectorized pavement marker type I-C (672-7002) | EACH | 10 | $4.00 | $25.00 | $6.00 |
| 69 | Reflectorized pavement marker type II-A-A (672-7004) | EACH | 20 | $4.00 | $25.00 | $6.00 |
| 70 | Eliminating existing PM & markers (4") (677-7001) | LF | 50 | $1.00 | $11.00 | $0.85 |
| 71 | Eliminating existing PM & markers (8") (677-7004) | LF | 50 | $1.00 | $14.00 | $1.70 |
| 72 | Eliminating existing PM & markers (12") (677-7006) | LF | 100 | $3.00 | $17.00 | $2.55 |
| 73 | Eliminating existing PM & markers (24") (677-7008) | LF | 80 | $6.50 | $23.00 | $5.10 |
| 74 | Eliminating existing PM & markers (arrow) (677-7009) | EACH | 2 | $350.00 | $300.00 | $75.00 |
| 75 | Eliminating existing PM & markers (double arrow) (677-7010) | EACH | 2 | $400.00 | $370.00 | $75.00 |
| 76 | Eliminating existing PM & markers (word) (677-7015) | EACH | 2 | $400.00 | $370.00 | $75.00 |
| 77 | Eliminating existing PM & markers (18")(yld tri) (677-7023) | EACH | 6 | $35.00 | $150.00 | $75.00 |
| 78 | Pavement surface preparation for marking (4") (678-7001) | LF | 500 | $0.10 | $1.00 | $0.50 |
| 79 | Pavement surface preparation for marking (8") (678-7004) | LF | 300 | $0.10 | $1.00 | $1.00 |
| 80 | Pavement surface preparation for marking (12") (678-7006) | LF | 275 | $0.60 | $1.00 | $1.50 |
| 81 | Pavement surface preparation for marking (24") (678-7008) | LF | 200 | $1.25 | $1.00 | $5.00 |
| 82 | Pavement surface preparation for marking (arrow) (678-7009) | EACH | 2 | $20.00 | $1.00 | $50.00 |
| 83 | Pavement surface preparation for marking (double arrow) (678-7010) | EACH | 2 | $25.00 | $1.00 | $50.00 |
| 84 | Pavement surface preparation for marking (word) (678-7016) | EACH | 2 | $27.50 | $1.00 | $50.00 |
| 85 | Install highway traffic signal (upgrade) (680-7011) | EACH | 1 | $13,000 | $7,500.00 | $10,000 |
| 86 | Vehicle signal section (12")LED(green) (682-7001) | EACH | 35 | $350.00 | $300.00 | $450.00 |
| 87 | Vehicle signal section (12")LED(green arrow) (682-7002) | EACH | 35 | $350.00 | $300.00 | $450.00 |
| 88 | Vehicle signal section (12")LED(yel) (682-7003) | EACH | 35 | $350.00 | $300.00 | $450.00 |
| 89 | Vehicle signal section (12")LED(yel arrow) (682-7004) | EACH | 35 | $350.00 | $300.00 | $450.00 |
| 90 | Vehicle signal section (12")LED(red) (682-7005) | EACH | 35 | $350.00 | $300.00 | $450.00 |
| 91 | Vehicle signal section (12")LED(red arrow) (682-7006) | EACH | 35 | $350.00 | $300.00 | $450.00 |
| 92 | Pedestrian signal section (LED)(countdown) (682-7018) | EACH | 4 | $900.00 | $800.00 | $800.00 |
| 93 | Back plate (12")(1 sec) (682-7021) | EACH | 2 | $115.00 | $105.00 | $200.00 |
| 94 | Back plate (12")(2 sec) (682-7022) | EACH | 10 | $100.00 | $130.00 | $275.00 |
| 95 | Louver (12") (adjustable) (682-7035) | EACH | 6 | $350.00 | $180.00 | $750.00 |
| 96 | Vehicle signal section (12")(LED)(yel)(solar) (682-7036) | EACH | 10 | $350.00 | $250.00 | $450.00 |
| 97 | Backplate W/reflectorized border(4 sec) (682-7037) | EACH | 10 | $210.00 | $160.00 | $400.00 |
| 98 | Backplate W/reflectorized border(5 sec) (682-7038) | EACH | 10 | $240.00 | $170.00 | $500.00 |
| 99 | Backplate W/reflectorized border(3 sec)aluminum (682-7039) | EACH | 10 | $200.00 | $150.00 | $300.00 |
| 100 | Backplate W/reflectorized border(4 sec)aluminum (682-7040) | EACH | 10 | $210.00 | $160.00 | $400.00 |
| 101 | Backplate W/reflectorized border(5 sec)aluminum (682-7041) | EACH | 10 | $230.00 | $170.00 | $500.00 |
| 102 | Backplate W/ref border(3 sec)(vent)aluminum (682-7042) | EACH | 2 | $432.00 | $150.00 | $300.00 |
| 103 | Backplate W/ref border(4 sec)(vent)aluminum (682-7043) | EACH | 2 | $426.00 | $160.00 | $400.00 |
| 104 | Backplate W/ref border(5 sec)(vent)aluminum (682-7044) | EACH | 2 | $269.00 | $170.00 | $500.00 |
| 105 | Backplate W/reflectorized border(3 sec) (682-7054) | EACH | 10 | $220.00 | $150.00 | $300.00 |
| 106 | Traffic signal CBL (type A)(14 AWG)(5 conductor) (684-7031) | LF | 3,000 | $3.50 | $3.00 | $4.00 |
| 107 | Traffic signal CBL (type A)(14 AWG)(7 conductor) (684-7033) | LF | 3,000 | $3.75 | $4.00 | $4.00 |
| 108 | Traffic signal CBL (type A)(14 AWG)(20 conductor) (684-7046) | LF | 1,500 | $7.75 | $4.00 | $4.00 |
| 109 | Traffic signal CBL (type A)(16 AWG)(3 conductor) (684-7049) | LF | 7,000 | $1.50 | $1.00 | $4.00 |
| 110 | Traffic signal CBL (type C)(12 AWG)(2 conductor) (684-7079) | LF | 1,200 | $3.50 | $2.00 | $4.00 |
| 111 | Install RDSD FLSH BCN assembly (solar PWRD) (685-7004) | EACH | 2 | $9,500.00 | $6,000.00 | $8,000.00 |
| 112 | Pedestrian pole assembly (687-7001) | EACH | 2 | $3,200.00 | $2,500.00 | $2,000.00 |
| 113 | Pedestrian push button pole (687-7002) | EACH | 4 | $3,000.00 | $1,000.00 | $2,000.00 |
| 114 | Pedestrian detect push button (APS) (688-7001) | EACH | 4 | $2,000.00 | $1,000.00 | $1,500.00 |
| 115 | Pedestrian detector controller unit (688-7003) | EACH | 2 | $5,000.00 | $3,000.00 | $5,000.00 |
| 116 | Vehicle LP detect (sawcut)(14 AWG)(BLK) (688-7005) | LF | 800 | $10.00 | $5.00 | $10.00 |
| 117 | Install of vehicle detectors (690-7005) | LF | 700 | $20.00 | $5.00 | $10.00 |
| 118 | Removal of ground boxes (690-7006) | EACH | 3 | $250.00 | $100.00 | $500.00 |
| 119 | Removal of cables (690-7009) | LF | 1,500 | $1.75 | $1.00 | $2.00 |
| 120 | Removal of span cable assembly (690-7016) | LF | 1,200 | $2.00 | $1.00 | $2.00 |
| 121 | Replace of electrical service (690-7019) | EACH | 3 | $6,000.00 | $6,000.00 | $10,000 |
| 122 | Install of electrical service (690-7020) | EACH | 2 | $6,000.00 | $6,000.00 | $10,000 |
| 123 | Removal of timber poles (690-7021) | EACH | 2 | $800.00 | $500.00 | $1,000.00 |
| 124 | Install of timber poles (690-7023) | EACH | 2 | $1,500.00 | $1,500.00 | $2,500.00 |
| 125 | Removal of signal head assembly (690-7024) | EACH | 8 | $130.00 | $300.00 | $100.00 |
| 126 | Removal of signal related signs (690-7027) | EACH | 5 | $100.00 | $100.00 | $50.00 |
| 127 | Install of signal related signs (690-7029) | EACH | 15 | $400.00 | $300.00 | $300.00 |
| 128 | Removal of pedestrian push buttons (690-7030) | EACH | 6 | $100.00 | $90.00 | $140.00 |
| 129 | Replace of pedestrian push buttons (690-7031) | EACH | 1 | $300.00 | $600.00 | $1,500.00 |
| 130 | Install of FND for ground MNT cabinets (690-7036) | EACH | 2 | $4,000.00 | $4,000.00 | $5,000.00 |
| 131 | Replace of control cabinet(GRND MNT) (690-7039) | EACH | 2 | $5,000.00 | $1,500.00 | $3,000.00 |
| 132 | Install of control cabinet(GRND MNT) (690-7040) | EACH | 2 | $2,000.00 | $1,100.00 | $3,000.00 |
| 133 | Removal of control cabinet(pole MNT) (690-7041) | EACH | 1 | $750.00 | $400.00 | $500.00 |
| 134 | Replace of control cabinet(pole MNT) (690-7042) | EACH | 1 | $1,350.00 | $1,100.00 | $3,000.00 |
| 135 | Install of control cabinet(pole MNT) (690-7043) | EACH | 2 | $1,700.00 | $1,000.00 | $3,000.00 |
| 136 | Removal of flasher cabinet (690-7044) | EACH | 2 | $400.00 | $200.00 | $200.00 |
| 137 | Replace of flasher cabinet (690-7045) | EACH | 3 | $1,500.00 | $1,000.00 | $550.00 |
| 138 | Install of flasher cabinet (690-7046) | EACH | 2 | $1,500.00 | $1,000.00 | $550.00 |
| 139 | Install of FND for RDSD FLSH bea assembly (690-7047) | EACH | 2 | $2,000.00 | $2,000.00 | $2,000.00 |
| 140 | Removal of RDSD FLSH beacon assembly (690-7048) | EACH | 1 | $900.00 | $900.00 | $300.00 |
| 141 | Replace of RDSD FLSH beacon assembly (690-7049) | EACH | 2 | $6,000.00 | $5,000.00 | $7,500.00 |
| 142 | Removal of signal pole assembly (690-7051) | EACH | 3 | $1,600.00 | $1,000.00 | $2,500.00 |
| 143 | Replace of signal pole assembly (690-7052) | EACH | 15 | $5,000.00 | $3,500.00 | $3,500.00 |
| 144 | Install of signal pole assembly (690-7053) | EACH | 5 | $2,000.00 | $1,500.00 | $2,500.00 |
| 145 | Removal of pedestrian ramps (690-7057) | EACH | 2 | $550.00 | $500.00 | $1,000.00 |
| 146 | Install of pedestrian ramps (690-7059) | EACH | 2 | $4,000.00 | $5,000.00 | $4,000.00 |
| 147 | Removal of sidewalks (690-7060) | SF | 20 | $300.00 | $100.00 | $10.00 |
| 148 | Install of sidewalks (690-7062) | SF | 20 | $500.00 | $100.00 | $100.00 |
| 149 | Removal of concrete foundations (690-7063) | EACH | 4 | $1,000.00 | $1,000.00 | $1,000.00 |
| 150 | Replace of luminaire head (690-7065) | EACH | 5 | $750.00 | $500.00 | $500.00 |
| 151 | Install of luminaire head (690-7066) | EACH | 4 | $600.00 | $400.00 | $500.00 |
| 152 | Replace of luminaire mast arms (690-7068) | EACH | 2 | $1,000.00 | $600.00 | $900.00 |
| 153 | Install of luminaire mast arms (690-7069) | EACH | 4 | $500.00 | $500.00 | $800.00 |
| 154 | Ins of traffic signal PL FND (24" dril SHFT) (690-7070) | LF | 30 | $200.00 | $150.00 | $300.00 |
| 155 | Ins of traffic signal PL FND (30" dril SHFT) (690-7071) | LF | 30 | $375.00 | $150.00 | $400.00 |
| 156 | Ins of traffic signal PL FND (36" dril SHFT) (690-7072) | LF | 30 | $600.00 | $350.00 | $450.00 |
| 157 | Ins of traffic signal PL FND (42" dril SHFT) (690-7073) | LF | 30 | $600.00 | $400.00 | $550.00 |
| 158 | Ins of traffic signal PL FND (48" dril SHFT) (690-7074) | LF | 30 | $800.00 | $625.00 | $550.00 |
| 159 | Install 12X12X6 PVC weathproof enclse (690-7075) | EACH | 1 | $200.00 | $100.00 | $300.00 |
| 160 | Replace 12X12X6 PVC weathproof enclse (690-7077) | EACH | 1 | $200.00 | $100.00 | $350.00 |
| 161 | Install down guy and anchor W/guard (690-7081) | EACH | 1 | $1,800.00 | $250.00 | $750.00 |
| 162 | Replace down guy and anchor W/guard (690-7082) | EACH | 1 | $400.00 | $300.00 | $1,000.00 |
| 163 | Remove down guy and anchor W/guard (690-7083) | EACH | 1 | $300.00 | $200.00 | $250.00 |
| 164 | Remove pedestrian pole assembly (690-7089) | EACH | 1 | $300.00 | $200.00 | $250.00 |
| 165 | Replace LED traffic signal lamp unit (690-7090) | EACH | 30 | $100.00 | $170.00 | $300.00 |
| 166 | Install LED traffic signal lamp unit (690-7092) | EACH | 30 | $200.00 | $160.00 | $300.00 |
| 167 | Replace pedestrian signal LED traffic signal lamp unit (690-7093) | EACH | 5 | $250.00 | $295.00 | $300.00 |
| 168 | Install pedestrian sign LED traffic signal amp unit (690-7095) | EACH | 2 | $500.00 | $295.00 | $300.00 |
| 169 | Replace spread spectrum antenna (690-7096) | EACH | 2 | $300.00 | $400.00 | $2,700.00 |
| 170 | Install spread spectrum antenna (690-7098) | EACH | 2 | $350.00 | $150.00 | $2,700.00 |
| 171 | Salvage traffic signal (690-7099) | EACH | 1 | $2,500.00 | $1,500.00 | $5,000.00 |
| 172 | Install luminaire pole (690-7125) | EACH | 2 | $500.00 | $500.00 | $1,000.00 |
| 173 | Replace luminaire pole (690-7126) | EACH | 2 | $750.00 | $600.00 | $1,000.00 |
| 174 | Install radar vehicle detection system (690-7134) | EACH | 4 | $1,500.00 | $7,000.00 | $12,000 |
| 175 | Replace radar vehicle detection system (690-7135) | EACH | 2 | $3,000.00 | $7,000.00 | $12,000 |
| 176 | ITS com CBL (ethernet) (6005-7001) | LF | 1,000 | $6.00 | $5.00 | $4.00 |
| 177 | VIVDS prosr sys (6006-7001) | EACH | 1 | $8,000.00 | $8,000.00 | $25,000 |
| 178 | VIVDS CNTRL software (6006-7005) | EACH | 1 | $100.00 | $200.00 | $1,000.00 |
| 179 | VIVDS cabling (6006-7007) | LF | 500 | $4.00 | $6.00 | $4.00 |
| 180 | VIVDS cam assy (install only) (6006-7010) | EACH | 1 | $500.00 | $2,000.00 | $3,500.00 |
| 181 | Bbu system (external battery cabinet) (6007-7001) | EACH | 2 | $9,000.00 | $6,500.00 | $10,000 |
| 182 | RVDS (presence detection only) (6008-7001) | EACH | 2 | $8,200.00 | $7,000.00 | $12,000 |
| 183 | RVDS (advance detection only) (6008-7002) | EACH | 2 | $8,000.00 | $7,000.00 | $12,000 |
| 184 | RVDS (presence and advance detection) (6008-7003) | EACH | 1 | $14,000 | $7,000.00 | $15,000 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 3, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.