TxDOT contract A00210146 bid tabulation

Bridge Maintenance, Various (DISTRICT WIDE to .). Let by Texas DOT on January 7, 2025, Potter, Amarillo District. 3 bids received; low bid $1,182,257 by Ti-Zack Concrete, LLC, -3.5% against the engineer's estimate of $1,224,932.

Owner
Texas DOT
Letting
07 JAN 2025
Pay items
41
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Ti-Zack Concrete, LLC$1,182,257Low-3.0%
2Icos Management, LLC$1,509,844+28%+23%
3Built Right Construction of Oklahoma, LLC$1,644,985+39%+34%
TxDOT contract A00210146: bids by rank

Engineer's estimate: $1,224,932.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Ti-Zack Concrete, LLC2. Icos Management, LLC3. Built Right Construction of Oklahoma, LLC
1Removing concrete (riprap) (104-7006)SY3$1,500.00$968.00$500.00$1,000.00
2Removing concrete (wingwall) (104-7028)CY4$1,500.00$1,210.00$1,800.00$1,000.00
3Embankment (final)(OC)(type B) (132-7003)CY60$90.00$66.55$150.00$100.00
4Flowable backfill (401-7001)CY7$400.00$665.50$800.00$500.00
5Class B concrete (flume) (420-7010)CY90$900.00$423.50$800.00$1,500.00
6Class C concrete (pile encasement) (420-7060)CY16$2,000.00$968.00$4,000.00$3,000.00
7Epoxy waterproof finish (type X) (427-7005)SF2,220$17.00$18.15$30.00$50.00
8Concrete structure repair (vertical & overhead) (429-7007)SF999$225.00$151.25$200.00$350.00
9Riprap (concrete)(5 in) (432-7002)CY2$1,250.00$786.50$2,000.00$1,200.00
10Cleaning existing joints (438-7008)LF48$35.00$151.25$90.00$75.00
11Multi-layer polymer overlay (439-7014)SY779$68.00$90.75$110.00$100.00
12Header type expansion joint (454-7009)CF2$500.00$1,210.00$2,500.00$1,000.00
13Shot blasting (483-7016)SY779$10.00$18.15$24.00$12.00
14Remove STR (rail) (496-7017)LF48$40.00$302.50$300.00$250.00
15Mobilization (500-7001)LS1$100,000$102,850$150,000$150,000
16Barricades, signs and traffic handling (502-7004)EACH5$17,000$6,050.00$6,000.00$4,000.00
17Portable changeable message sign (503-7002)EACH2$15,000$6,050.00$6,000.00$10,000
18TMA (stationary) (505-7001)DAY88$300.00$302.50$1.00$350.00
19TMA (mobile operation) (505-7002)HR40$150.00$121.00$1.00$350.00
20Permanent CTB (single slope) (type 1) (42 ) (514-7001)LF1,527$144.00$151.25$170.00$200.00
21Permanent CTB (single slope)(42)(mod) (514-7004)LF60$300.00$242.00$140.00$200.00
22Permanent CTB (single slope) (mod) (514-7035)LF220$200.00$181.50$360.00$200.00
23Permanent CTB (tran SSCB to parapet) (514-7040)LF98$275.00$181.50$450.00$200.00
24Permanent CTB (tran SSCB to T501)(mod) (514-7042)LF36$275.00$242.00$700.00$200.00
25Metal W-beam guard fence (steel post) (540-7002)LF340$40.00$102.85$85.00$35.00
26Metal beam guard fence trans (thrie-beam) (540-7005)EACH6$3,130.00$7,260.00$3,450.00$3,000.00
27Remove metal beam guard fence (542-7001)LF2,046$4.00$10.89$10.00$7.00
28Remove terminal anchor section (542-7002)EACH6$300.00$1,210.00$3,500.00$500.00
29Remove downstream anchor terminal (542-7003)EACH2$430.00$1,815.00$1,500.00$1,000.00
30RM metal beam guard fence trans (thrie-beam) (542-7004)EACH5$225.00$1,815.00$750.00$1,500.00
31Guardrail end treatment (install) (544-7001)EACH6$3,628.00$8,470.00$6,000.00$4,500.00
32Guardrail end treatment (remove) (544-7003)EACH1$350.00$6,050.00$3,500.00$2,000.00
33Crash cushion attenuator (remove) (545-7004)EACH1$1,650.00$4,840.00$6,500.00$2,000.00
34Crash cushion attenuator (install)(L)(W)(TL3) (545-7008)EACH1$36,000$12,100$42,000$75,000
35Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH18$40.00$60.50$300.00$65.00
36Reflectorized pavement marking type I (W)6"(solid)(090MIL) (666-7410)LF330$2.00$6.05$20.00$10.00
37Reflectorized pavement marking type I (Y)6"(solid)(090MIL) (666-7422)LF330$2.00$6.05$20.00$10.00
38Crack cleaning and sealing (JCP) (713-7004)LF37$20.00$268.62$50.00$65.00
39Carbon fiber reinforced polymer protection (786-7001)SF294$130.00$134.31$140.00$135.00
40Concrete beam repair (788-7001)EACH6$5,600.00$8,470.00$12,000$5,000.00
41Bent cap/abutment cap cleaning (7001-7002)EACH12$1,500.00$1,815.00$2,000.00$1,000.00
TxDOT contract A00210146: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of January 7, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.

We use your email to reply to you and, now and then, to tell you about Mirage. You can opt out at any time. Privacy policy