TxDOT contract A00211468 bid tabulation
Resurface Roadway, SH 10 (West Park Drive to SH 183). Let by Texas DOT on April 8, 2026, Tarrant, Fort Worth District. 7 bids received; low bid $5,358,724 by Eurovia Atlantic Coast LLC, -4.2% against the engineer's estimate of $5,591,882.
- Owner
- Texas DOT
- Letting
- 08 APR 2026
- Pay items
- 52
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Eurovia Atlantic Coast LLC | $5,358,724 | Low | -4.0% |
| 2 | Austin Bridge & Road Services, LP | $5,646,565 | +5.0% | +1.0% |
| 3 | Jagoe-Public Company | $5,869,310 | +10% | +5.0% |
| 4 | Peachtree Construction, LTD. | $6,468,188 | +21% | +16% |
| 5 | Ragle Construction, Inc. | $6,789,347 | +27% | +21% |
| 6 | Overland Corporation | $7,669,358 | +43% | +37% |
| 7 | Texas Materials Group, Inc. | $8,041,491 | +50% | +44% |
Engineer's estimate: $5,591,882.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Eurovia Atlantic Coast LLC | 2. Austin Bridge & Road Services, LP | 3. Jagoe-Public Company | 4. Peachtree Construction, LTD. | 5. Ragle Construction, Inc. | 6. Overland Corporation |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (curb or curb & gutter) (104-7018) | LF | 200 | $18.33 | $21.00 | $21.00 | $15.25 | $23.00 | $6.04 | $41.00 |
| 2 | Embankment (final)(OC)(type B) (132-7003) | CY | 10 | $75.00 | $200.00 | $200.00 | $105.00 | $215.00 | $300.00 | $61.00 |
| 3 | Asphalt (AC-20-5TR) (316-7007) | GAL | 58,204 | $4.50 | $4.65 | $5.25 | $5.50 | $4.65 | $6.50 | $5.25 |
| 4 | Aggregate (type-B, GR-4)(sac-B) (316-7173) | CY | 1,392 | $172.00 | $186.00 | $105.00 | $110.00 | $185.00 | $225.00 | $105.00 |
| 5 | D-GR HMA type D PG64-22 (level-UP) (341-7046) | TON | 4,404 | $125.00 | $112.00 | $120.21 | $125.00 | $157.00 | $113.00 | $156.43 |
| 6 | SP mixes SP-C sac-A PG70-28 (344-7024) | TON | 22,018 | $145.00 | $131.00 | $147.93 | $142.00 | $158.00 | $155.50 | $189.00 |
| 7 | Flexible pavement structure repair(8") (351-7007) | SY | 756 | $68.00 | $105.00 | $102.52 | $90.00 | $120.00 | $167.00 | $142.00 |
| 8 | Planing asphalt concrete pavement (2" to 4 1/2") (354-7081) | SY | 153,169 | $1.80 | $2.77 | $1.09 | $3.00 | $3.15 | $1.65 | $5.00 |
| 9 | Full-depth repair CRCP (8"-10") (361-7065) | SY | 504 | $208.00 | $203.00 | $203.00 | $215.00 | $227.00 | $302.00 | $219.49 |
| 10 | Riprap (mow strip)(4 in) (432-7013) | CY | 31 | $625.00 | $794.00 | $685.00 | $1,150.00 | $740.00 | $638.90 | $687.72 |
| 11 | Mobilization (500-7001) | LS | 1 | $508,353 | $295,000 | $621,122 | $641,000 | $485,000 | $670,000 | $765,000 |
| 12 | Barricades, signs and traffic handling (502-7001) | MO | 6 | $10,000 | $35,500 | $34,599 | $25,000 | $25,500 | $100,000 | $32,465 |
| 13 | Portable changeable message sign (503-7002) | EACH | 2 | $10,000 | $17,500 | $130.00 | $20,000 | $15,000 | $20,000 | $18,500 |
| 14 | TMA (stationary) (505-7001) | DAY | 160 | $170.00 | $320.00 | $1.00 | $25.00 | $150.00 | $287.00 | $1,000.00 |
| 15 | TMA (mobile operation) (505-7003) | DAY | 15 | $175.00 | $700.00 | $1.50 | $335.00 | $475.00 | $616.00 | $5.00 |
| 16 | Biodegradable erosion control logs (install) (8") (506-7043) | LF | 780 | $4.80 | $4.00 | $4.75 | $5.00 | $8.50 | $4.75 | $4.75 |
| 17 | Biodegradable erosion control logs (remove) (506-7046) | LF | 780 | $1.50 | $2.00 | $1.00 | $1.00 | $2.25 | $1.00 | $1.00 |
| 18 | Concrete curb & gutter (type II) (529-7009) | LF | 200 | $40.00 | $69.00 | $69.00 | $65.00 | $75.00 | $30.00 | $70.69 |
| 19 | Metal W-beam guard fence (timber post) (540-7001) | LF | 500 | $30.00 | $28.00 | $24.00 | $28.57 | $30.00 | $28.00 | $28.35 |
| 20 | Downstream anchor terminal section (540-7015) | EACH | 5 | $1,550.00 | $1,200.00 | $1,300.00 | $1,225.00 | $1,300.00 | $1,200.00 | $1,214.94 |
| 21 | Metal beam guard fence (long span system) (540-7027) | EACH | 1 | $1,350.00 | $1,125.00 | $1,200.00 | $1,148.00 | $1,225.00 | $1,125.00 | $1,139.01 |
| 22 | Remove metal beam guard fence (542-7001) | LF | 500 | $3.50 | $3.00 | $3.00 | $3.05 | $3.25 | $3.00 | $3.04 |
| 23 | Remove terminal anchor section (542-7002) | EACH | 10 | $250.00 | $200.00 | $300.00 | $204.00 | $215.00 | $200.00 | $202.49 |
| 24 | Guardrail end treatment (install) (544-7001) | EACH | 5 | $3,280.00 | $2,950.00 | $3,100.00 | $3,300.00 | $3,200.00 | $2,950.00 | $2,986.73 |
| 25 | Work zone pavement marking non-removing (W)6"(broken) (662-7005) | LF | 4,576 | $0.45 | $0.25 | $0.25 | $0.26 | $0.88 | $0.50 | $0.25 |
| 26 | Work zone pavement marking non-removing (W)6"(solid) (662-7008) | LF | 30,885 | $0.36 | $0.19 | $0.19 | $0.19 | $0.90 | $0.45 | $0.19 |
| 27 | Work zone pavement marking non-removing (W)8"(solid) (662-7012) | LF | 9,309 | $0.65 | $0.37 | $0.37 | $0.38 | $1.40 | $0.60 | $0.37 |
| 28 | Work zone pavement marking non-removing (W)12"(solid) (662-7015) | LF | 46 | $1.35 | $1.00 | $1.00 | $1.02 | $4.25 | $2.00 | $1.00 |
| 29 | Work zone pavement marking non-removing (W)24"(solid) (662-7017) | LF | 1,336 | $2.80 | $2.00 | $2.00 | $2.04 | $7.00 | $3.20 | $2.00 |
| 30 | Work zone pavement marking non-removing (W)(arrow) (662-7018) | EACH | 98 | $85.00 | $25.00 | $25.00 | $25.51 | $130.00 | $50.00 | $25.00 |
| 31 | Work zone pavement marking non-removing(W)(word) (662-7030) | EACH | 98 | $75.00 | $28.00 | $28.00 | $28.57 | $150.00 | $60.00 | $28.00 |
| 32 | Work zone pavement marking non-removing (Y)6"(solid) (662-7038) | LF | 30,100 | $0.36 | $0.20 | $0.20 | $0.20 | $0.95 | $0.45 | $0.20 |
| 33 | Work zone pavement marking SHT terminal (tab)type W (662-7112) | EACH | 4,576 | $1.20 | $1.65 | $0.50 | $2.03 | $4.50 | $2.37 | $1.00 |
| 34 | Reflectorized pavement marking type I (W)6"(DOT)(100MIL) (666-7009) | LF | 171 | $1.33 | $1.00 | $1.00 | $1.02 | $1.85 | $1.00 | $1.00 |
| 35 | Reflectorized pavement marking type I (W)8"(solid)(100MIL) (666-7024) | LF | 9,566 | $1.01 | $0.79 | $0.79 | $0.81 | $1.00 | $0.90 | $0.79 |
| 36 | Reflectorized pavement marking type I (W)12"(solid)(100MIL) (666-7030) | LF | 47 | $3.50 | $3.00 | $3.00 | $3.06 | $4.25 | $4.00 | $3.00 |
| 37 | Reflectorized pavement marking type I (W)24"(solid)(100MIL) (666-7036) | LF | 1,350 | $6.44 | $6.29 | $6.29 | $6.42 | $7.50 | $7.10 | $6.29 |
| 38 | Reflectorized pavement marking type I (W)(arrow)(100MIL) (666-7042) | EACH | 98 | $150.00 | $145.00 | $145.00 | $147.96 | $145.00 | $150.00 | $145.00 |
| 39 | Reflectorized pavement marking type I (W)(word)(100MIL) (666-7066) | EACH | 98 | $170.00 | $150.00 | $150.00 | $153.06 | $175.00 | $170.00 | $150.00 |
| 40 | Reflectorized pavement marking type I (Y)12"(solid)(100MIL) (666-7117) | LF | 577 | $3.50 | $2.75 | $2.75 | $2.81 | $4.00 | $4.00 | $2.75 |
| 41 | Type I high perf PM (W)6"(broken)(100MIL) (666-7290) | LF | 15,400 | $0.65 | $0.52 | $0.52 | $0.53 | $0.75 | $0.69 | $0.52 |
| 42 | Type I high perf PM (W)6"(solid)(100MIL) (666-7293) | LF | 31,197 | $0.66 | $0.51 | $0.51 | $0.52 | $0.65 | $0.67 | $0.51 |
| 43 | Type I high perf PM (Y)6"(solid)(100MIL) (666-7305) | LF | 30,406 | $0.60 | $0.51 | $0.51 | $0.52 | $0.65 | $0.67 | $0.51 |
| 44 | Pavement sler 6" (666-7347) | LF | 61,603 | $0.22 | $0.11 | $0.11 | $0.11 | $0.20 | $0.20 | $0.11 |
| 45 | Pavement sler 8" (666-7348) | LF | 9,566 | $0.65 | $0.15 | $0.15 | $0.15 | $0.30 | $0.25 | $0.15 |
| 46 | Pavement sler 12" (666-7350) | LF | 47 | $0.80 | $0.50 | $0.50 | $0.51 | $0.90 | $1.00 | $0.50 |
| 47 | Pavement sler 24" (666-7352) | LF | 1,350 | $2.10 | $0.60 | $0.60 | $0.61 | $1.55 | $2.00 | $0.60 |
| 48 | Pavement sler (arrow) (666-7353) | EACH | 98 | $50.00 | $9.00 | $9.00 | $9.18 | $30.00 | $30.00 | $9.00 |
| 49 | Pavement sler (word) (666-7354) | EACH | 98 | $60.00 | $9.00 | $9.00 | $9.18 | $36.00 | $40.00 | $9.00 |
| 50 | Reflectorized pavement marker type I-C (672-7002) | EACH | 526 | $4.00 | $3.50 | $3.50 | $3.57 | $5.25 | $4.00 | $3.50 |
| 51 | Reflectorized pavement marker type II-C-R (672-7006) | EACH | 959 | $4.24 | $3.49 | $3.49 | $3.56 | $5.25 | $4.00 | $3.49 |
| 52 | Existing manhole adjustments (7041-7002) | EACH | 9 | $2,250.00 | $2,000.00 | $2,000.00 | $650.00 | $2,150.00 | $1,162.00 | $750.98 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of April 8, 2026. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.