TxDOT contract A00212082 bid tabulation

METAL BEAM GUARD FENCE REPAIR, IH0010 (VARIOUS to VARIOUS). Let by Texas DOT on February 18, 2025, Chambers, Beaumont District. 6 bids received; low bid $258,947 by Hazmat International, Inc., -30% against the engineer's estimate of $368,260.

Owner
Texas DOT
Letting
18 FEB 2025
Pay items
68
Data through
19 NOV 2026

Bidders

RankBidderTotal bidAgainst the low bidAgainst the estimate
1Hazmat International, Inc.$258,947Low-30%
2BK Field Operations LLC$270,133+4.0%-27%
3Rhino Equity, LLC$311,609+20%-15%
4Roy Jorgensen Associates, Inc.$327,650+27%-11%
5Ross Sa Enterprise LLC$485,471+87%+32%
6Elite Kings Construction, LLC$943,929+265%+156%
TxDOT contract A00212082: bids by rank

Engineer's estimate: $368,260.

Bid tabulation

LinePay itemUnitQuantityEstimate1. Hazmat International, Inc.2. BK Field Operations LLC3. Rhino Equity, LLC4. Roy Jorgensen Associates, Inc.5. Ross Sa Enterprise LLC6. Elite Kings Construction, LLC
1Removing concrete (riprap) (104-7006)SY15$75.00$5.00$1.00$75.00$200.00$30.00$64.00
2Concrete structure repair (standard) (429-7009)SF100$20.00$20.00$10.00$20.00$125.00$50.00$199.20
3Riprap (mow strip)(4 in) (432-7013)CY30$700.00$300.00$400.00$200.00$600.00$400.00$680.00
4Rail (type T402)(HPC) (450-7013)LF150$160.00$25.00$40.00$60.00$100.00$50.00$199.20
5Mobilization (callout) (500-7002)EACH15$100.00$50.00$1.00$1.00$150.00$50.00$1,200.00
6Mobilization (emergency) (500-7033)EACH5$1,000.00$500.00$1.00$1,000.00$1,500.00$500.00$3,200.00
7Portable changeable message sign (503-7001)DAY15$200.00$75.00$75.00$50.00$250.00$800.00$280.00
8TMA (stationary) (505-7001)DAY25$800.00$3,500.00$1,000.00$500.00$750.00$7,500.00$280.00
9Portable concrete traffic barrier (furnish and install)(F-shape)(type 1) (512-7005)LF120$80.00$50.00$75.00$5.00$50.00$40.00$44.00
10Portable concrete traffic barrier (move)(F-shape)(type 1) (512-7029)LF20$20.00$5.00$180.00$5.00$50.00$40.00$80.00
11Portable concrete traffic barrier (remove)(F-shape)(type 1) (512-7053)LF120$5.00$5.00$1.00$30.00$25.00$40.00$18.40
12Metal W-beam guard fence (timber post) (540-7001)LF100$20.00$30.00$22.00$30.00$40.00$50.00$60.00
13Metal thrie-beam guard fence (timber post) (540-7003)LF25$20.00$5.00$75.00$30.00$100.00$50.00$68.80
14Metal beam guard fence trans (thrie-beam) (540-7005)EACH1$500.00$1,100.00$2,200.00$500.00$1,500.00$2,500.00$2,000.00
15Metal beam guard fence trans (TL2) (540-7006)EACH1$500.00$1.00$1,000.00$500.00$2,000.00$500.00$2,400.00
16Metal beam guard fence trans (T101) (540-7007)EACH1$1,000.00$1.00$500.00$1,000.00$900.00$500.00$2,000.00
17Metal W-beam guard fence adjustment (540-7009)LF100$50.00$10.00$10.00$10.00$25.00$8.00$16.00
18Transition adjustment (540-7012)EACH5$100.00$1.00$1.00$100.00$500.00$50.00$280.00
19Downstream anchor terminal section (540-7015)EACH2$1,800.00$900.00$2,000.00$1,800.00$1,000.00$2,000.00$1,840.00
20Metal beam guard fence (long span system) (540-7027)EACH25$10.00$10.00$5.00$10.00$250.00$300.00$1,280.00
21Remove metal beam guard fence (542-7001)LF500$5.00$5.00$1.00$5.00$15.00$5.00$4.00
22Remove terminal anchor section (542-7002)EACH5$200.00$1.00$1.00$100.00$500.00$1.00$360.00
23Guardrail end treatment (install) (544-7001)EACH2$2,500.00$2,000.00$500.00$4,000.00$3,500.00$3,500.00$2,880.00
24Guardrail end treatment (move & reset) (544-7002)EACH3$200.00$100.00$500.00$10.00$1,000.00$300.00$960.00
25Guardrail end treatment (remove) (544-7003)EACH2$250.00$1.00$100.00$100.00$1,000.00$300.00$448.00
26Crash cushion attenuator (remove) (545-7004)EACH1$500.00$1.00$1.00$500.00$2,500.00$2,000.00$436.80
27Install delineator assembly (D-SW)SZ 1(WFLX)GND (658-7003)EACH20$10.00$1.00$7.00$20.00$120.00$1.00$68.00
28Install delineator assembly (D-SW)SZ 1(WFLX)GND(BI) (658-7004)EACH20$10.00$1.00$7.00$20.00$125.00$1.00$60.00
29Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018)EACH9$35.00$10.00$15.00$50.00$100.00$1.00$44.00
30Install delineator assembly (D-SW)SZ 1(BRF)GF2(BI) (658-7019)EACH5$35.00$10.00$15.00$50.00$150.00$1.00$60.00
31Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036)EACH2$35.00$1.00$20.00$50.00$200.00$1.00$52.00
32Replace rail element (W-beam) (770-7001)LF1,500$50.00$12.00$6.00$20.00$13.00$25.00$28.00
33Replace rail element (thrie-beam) (770-7002)LF25$50.00$20.00$100.00$20.00$75.00$30.00$48.00
34Repl rail elmnt(thrie-BM trans to W-BM) (770-7003)EACH25$30.00$25.00$100.00$20.00$300.00$40.00$400.00
35Replace timber post W/O concrete FND (770-7006)EACH10$30.00$30.00$500.00$200.00$350.00$100.00$160.00
36Replace steel post W/O concrete FND (770-7007)EACH10$80.00$1.00$50.00$200.00$300.00$100.00$88.00
37Replace timber post W/ concrete FND (770-7008)EACH10$80.00$100.00$500.00$200.00$300.00$100.00$224.00
38Realign posts (770-7010)EACH75$25.00$50.00$300.00$15.00$50.00$30.00$48.00
39Rem obsolete get & repl W/ SGT (770-7013)EACH2$3,000.00$6,000.00$12,000$4,000.00$5,500.00$5,000.00$5,200.00
40Repl single gdrail terminal impact head (770-7015)EACH15$1,700.00$500.00$500.00$1,700.00$1,000.00$500.00$1,520.00
41Replace single gdrail terminal rail (770-7016)LF100$100.00$150.00$150.00$200.00$75.00$55.00$44.00
42Replace single gdrail terminal post (770-7017)EACH10$70.00$100.00$100.00$200.00$250.00$100.00$78.40
43Replace blockout (770-7018)EACH50$150.00$150.00$450.00$50.00$50.00$20.00$40.00
44Reset SGT impact head (770-7020)EACH10$400.00$500.00$300.00$200.00$250.00$50.00$464.00
45Replace SGT object marker (770-7021)EACH16$100.00$35.00$1.00$100.00$100.00$10.00$120.00
46Replace SGT cable assembly (770-7023)EACH15$200.00$100.00$1.00$200.00$125.00$10.00$150.40
47Replace SGT strut (770-7024)EACH7$200.00$50.00$1.00$100.00$100.00$20.00$148.00
48Replace posts (TL-4)(trinity) (771-7007)EACH50$225.00$200.00$155.00$150.00$200.00$300.00$400.00
49Cable splice / turnbuckle (TL-4) (771-7010)EACH10$100.00$25.00$1.00$10.00$100.00$150.00$520.00
50Repair concrete foundation (TL-4) (771-7012)EACH2$200.00$1.00$100.00$200.00$1,000.00$80.00$52.00
51Repair or replace cable barrier terminal sec(TL-4) (771-7014)EACH20$500.00$600.00$100.00$100.00$500.00$120.00$6,800.00
52Replace cable (TL-4) (771-7016)LF1,000$2.50$1.00$1.00$0.25$0.50$4.00$48.00
53Check / RE-tension cable (TL-4) (771-7018)EACH10$800.00$200.00$1,000.00$200.00$1,000.00$100.00$248.00
54Remove (tau II-R) narrow (774-7019)EACH10$450.00$2,200.00$1.00$1.00$1,000.00$500.00$1,600.00
55Replace (tau II-R) narrow (774-7020)EACH10$1,000.00$100.00$1,500.00$8,000.00$2,000.00$5,000.00$34,240
56Remove (narrow quad) (774-7025)EACH1$3,000.00$2,000.00$1.00$1.00$2,500.00$1,000.00$2,000.00
57Replace (narrow quad) (774-7026)EACH1$13,000$500.00$30,000$10,000$2,500.00$25,000$20,000
58Repair (narrow quad bay) (774-7029)EACH1$5,000.00$2,000.00$750.00$1,800.00$4,000.00$1,000.00$2,800.00
59Repair (wide quad bay) (774-7034)EACH1$5,000.00$1.00$400.00$2,000.00$4,000.00$1,000.00$1,200.00
60Remove (tau II) wide (774-7039)EACH1$500.00$500.00$1.00$1.00$2,500.00$1,000.00$3,200.00
61Replace (tau II) wide (774-7040)EACH1$2,000.00$225.00$3,000.00$10,000$2,500.00$30,000$32,000
62Remove (narrow tracc) (774-7048)EACH1$2,500.00$1.00$2,000.00$1.00$2,500.00$500.00$2,800.00
63Replace (narrow tracc) (774-7049)EACH1$13,000$1.00$1,000.00$10,000$1,000.00$500.00$640.00
64Remove (wide tracc) (774-7050)EACH1$2,500.00$500.00$1.00$1.00$2,000.00$500.00$280.00
65Replace (wide tracc) (774-7051)EACH1$13,000$500.00$1,000.00$10,000$1,000.00$500.00$200.00
66Repair (wide tracc) (774-7052)LF1$3,000.00$100.00$200.00$2,000.00$1,000.00$500.00$520.00
67Repair (wide tracc bay) (774-7054)EACH1$1,000.00$100.00$1.00$1,500.00$3,000.00$500.00$360.00
68Concrete rail repair (in-kind) (778-7001)LF1$3,500.00$2,000.00$1,250.00$3,500.00$2,000.00$500.00$608.00
TxDOT contract A00212082: unit prices by line

The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.

Source

Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.

Every contract let that day: TxDOT letting of February 18, 2025. Compiled by Mirage Metrics.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.