TxDOT contract A00212176 bid tabulation
METAL BEAM GUARD FENCE REPAIR, US0059 (SAN JACINTO COUNTY MAINTENANCE SECTION to VARIOUS ROADWAYS). Let by Texas DOT on January 15, 2025, San Jacinto, Lufkin District. 4 bids received; low bid $143,895 by Above All Contracting LLC, -37% against the engineer's estimate of $229,740.
- Owner
- Texas DOT
- Letting
- 15 JAN 2025
- Pay items
- 34
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Above All Contracting LLC | $143,895 | Low | -37% |
| 2 | Aad Contracting Inc. | $194,475 | +35% | -15% |
| 3 | Austin Barricade Company, L.L.C. | $201,882 | +40% | -12% |
| 4 | Hazmat International, Inc. | $263,720 | +83% | +15% |
Engineer's estimate: $229,740.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Above All Contracting LLC | 2. Aad Contracting Inc. | 3. Austin Barricade Company, L.L.C. | 4. Hazmat International, Inc. |
|---|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (curb) (104-7016) | LF | 70 | $25.00 | $10.00 | $10.00 | $5.00 | $1.00 |
| 2 | Mobilization (callout) (500-7002) | EACH | 10 | $1,000.00 | $1.00 | $2,000.00 | $2,500.00 | $100.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 60 | $200.00 | $1.00 | $250.00 | $1.00 | $500.00 |
| 4 | Metal W-beam guard fence (timber post) (540-7001) | LF | 2,000 | $35.00 | $22.00 | $32.00 | $40.00 | $25.00 |
| 5 | Metal beam guard fence trans (thrie-beam) (540-7005) | EACH | 5 | $1,500.00 | $2,500.00 | $500.00 | $1,000.00 | $1,500.00 |
| 6 | Metal beam guard fence trans (T101) (540-7007) | EACH | 5 | $1,000.00 | $200.00 | $100.00 | $500.00 | $100.00 |
| 7 | Driveway terminal anchor section (540-7014) | EACH | 5 | $50.00 | $200.00 | $100.00 | $1.00 | $25.00 |
| 8 | Downstream anchor terminal section (540-7015) | EACH | 5 | $800.00 | $1,300.00 | $1,600.00 | $500.00 | $1,000.00 |
| 9 | Metal beam guard fence (long span system) (540-7027) | EACH | 5 | $140.00 | $100.00 | $500.00 | $500.00 | $500.00 |
| 10 | Terminal anchor section (540-7041) | EACH | 5 | $35.00 | $100.00 | $100.00 | $1.00 | $200.00 |
| 11 | Remove metal beam guard fence (542-7001) | LF | 2,000 | $4.00 | $3.00 | $1.00 | $0.25 | $2.00 |
| 12 | Remove terminal anchor section (542-7002) | EACH | 5 | $250.00 | $200.00 | $1.00 | $1.00 | $200.00 |
| 13 | Remove downstream anchor terminal (542-7003) | EACH | 5 | $1.00 | $200.00 | $1.00 | $1.00 | $50.00 |
| 14 | Install delineator assembly (D-SW)SZ 1(BRF)GF1 (BI) (658-7016) | EACH | 5 | $40.00 | $40.00 | $25.00 | $25.00 | $20.00 |
| 15 | Install object marker assembly (OM-2Z)(WFLX)GND (658-7058) | EACH | 5 | $40.00 | $40.00 | $25.00 | $30.00 | $50.00 |
| 16 | Replace rail element (W-beam) (770-7001) | LF | 1,250 | $25.00 | $25.00 | $18.00 | $20.00 | $18.00 |
| 17 | Replace timber post W/O concrete FND (770-7006) | EACH | 10 | $60.00 | $100.00 | $65.00 | $200.00 | $50.00 |
| 18 | Replace steel post W/O concrete FND (770-7007) | EACH | 10 | $70.00 | $100.00 | $90.00 | $200.00 | $50.00 |
| 19 | Replace timber post W/ concrete FND (770-7008) | EACH | 10 | $60.00 | $100.00 | $65.00 | $200.00 | $50.00 |
| 20 | Replace steel post W/ concrete FND (770-7009) | EACH | 10 | $70.00 | $100.00 | $90.00 | $200.00 | $50.00 |
| 21 | Realign posts (770-7010) | EACH | 100 | $25.00 | $20.00 | $20.00 | $1.00 | $50.00 |
| 22 | Replace terminal anchor posts (770-7012) | EACH | 5 | $100.00 | $25.00 | $100.00 | $1.00 | $500.00 |
| 23 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 5 | $2,000.00 | $3,100.00 | $4,200.00 | $6,000.00 | $3,500.00 |
| 24 | Repl single gdrail terminal impact head (770-7015) | EACH | 10 | $1,000.00 | $500.00 | $1,600.00 | $850.00 | $2,000.00 |
| 25 | Replace single gdrail terminal rail (770-7016) | LF | 10 | $30.00 | $100.00 | $42.00 | $102.00 | $40.00 |
| 26 | Replace single gdrail terminal post (770-7017) | EACH | 10 | $100.00 | $200.00 | $75.00 | $88.00 | $200.00 |
| 27 | Replace blockout (770-7018) | EACH | 150 | $50.00 | $5.00 | $25.00 | $10.00 | $50.00 |
| 28 | Repair steel post with base plate (770-7019) | EACH | 5 | $50.00 | $200.00 | $100.00 | $145.00 | $20.00 |
| 29 | Reset SGT impact head (770-7020) | EACH | 5 | $200.00 | $200.00 | $200.00 | $253.00 | $500.00 |
| 30 | Replace SGT object marker (770-7021) | EACH | 2 | $25.00 | $50.00 | $20.00 | $1.00 | $50.00 |
| 31 | Replace SGT cable assembly (770-7023) | EACH | 15 | $80.00 | $100.00 | $90.00 | $10.00 | $200.00 |
| 32 | Replace SGT strut (770-7024) | EACH | 2 | $30.00 | $250.00 | $50.00 | $400.00 | $100.00 |
| 33 | Repair (T101RC) (776-7008) | LF | 5 | $100.00 | $100.00 | $1.00 | $46.00 | $25.00 |
| 34 | Concrete rail repair (in-kind) (778-7001) | LF | 50 | $800.00 | $50.00 | $100.00 | $100.00 | $1,500.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of January 15, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.