TxDOT contract A00214578 bid tabulation
METAL BEAM GUARD FENCE REPAIR, IH0020 (Various Roadways in the Kaufman - to Rockwall Maintenance Section). Let by Texas DOT on July 2, 2025, Kaufman, Dallas District. 5 bids received; low bid $608,290 by Fireman Excavating, Inc., -57% against the engineer's estimate of $1,412,845.
- Owner
- Texas DOT
- Letting
- 02 JUL 2025
- Pay items
- 38
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Fireman Excavating, Inc. | $608,290 | Low | -57% |
| 2 | Austin Barricade Company, L.L.C. | $889,672 | +46% | -37% |
| 3 | Ross Sa Enterprise LLC | $914,379 | +50% | -35% |
| 4 | BK Field Operations LLC | $935,880 | +54% | -34% |
| 5 | Rhino Equity, LLC | $1,260,518 | +107% | -11% |
Engineer's estimate: $1,412,845.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Fireman Excavating, Inc. | 2. Austin Barricade Company, L.L.C. | 3. Ross Sa Enterprise LLC | 4. BK Field Operations LLC | 5. Rhino Equity, LLC |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 50 | $200.00 | $75.00 | $55.00 | $50.00 | $75.00 | $65.00 |
| 2 | Mobilization (callout) (500-7002) | EACH | 450 | $2,000.00 | $1.00 | $0.15 | $0.25 | $1.00 | $100.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 365 | $250.00 | $1.00 | $0.15 | $0.25 | $1.00 | $1.00 |
| 4 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 50 | $18.00 | $20.00 | $25.00 | $35.00 | $100.00 | $22.00 |
| 5 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 150 | $18.00 | $20.00 | $25.00 | $35.00 | $50.00 | $22.00 |
| 6 | Replace rail element (W-beam) (770-7001) | LF | 4,000 | $10.00 | $38.00 | $24.00 | $20.00 | $45.00 | $15.00 |
| 7 | Replace rail element (thrie-beam) (770-7002) | LF | 50 | $35.00 | $50.00 | $50.00 | $50.00 | $150.00 | $25.00 |
| 8 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 25 | $350.00 | $50.00 | $50.00 | $800.00 | $1.00 | $350.00 |
| 9 | Replace short radius sys (TL-2) (770-7004) | EACH | 10 | $75.00 | $200.00 | $5.00 | $200.00 | $2,000.00 | $1.00 |
| 10 | Replace timber post W/O concrete FND (770-7006) | EACH | 300 | $5.00 | $100.00 | $50.00 | $150.00 | $1.00 | $100.00 |
| 11 | Replace steel post W/O concrete FND (770-7007) | EACH | 50 | $5.00 | $100.00 | $75.00 | $1.00 | $1.00 | $80.00 |
| 12 | Replace steel post W/ concrete FND (770-7009) | EACH | 10 | $30.00 | $10.00 | $75.00 | $1.00 | $1.00 | $80.00 |
| 13 | Realign posts (770-7010) | EACH | 600 | $27.00 | $1.00 | $1.00 | $25.00 | $1.00 | $5.00 |
| 14 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 50 | $3,200.00 | $6,000.00 | $6,500.00 | $3,200.00 | $5,000.00 | $4,000.00 |
| 15 | Repl single gdrail terminal impact head (770-7015) | EACH | 50 | $1,000.00 | $500.00 | $450.00 | $500.00 | $500.00 | $600.00 |
| 16 | Replace single gdrail terminal rail (770-7016) | LF | 1,500 | $5.00 | $20.00 | $22.00 | $5.00 | $50.00 | $45.00 |
| 17 | Replace single gdrail terminal post (770-7017) | EACH | 150 | $100.00 | $20.00 | $150.00 | $50.00 | $30.00 | $75.00 |
| 18 | Replace blockout (770-7018) | EACH | 400 | $1.00 | $10.00 | $25.00 | $5.00 | $1.00 | $30.00 |
| 19 | Repair steel post with base plate (770-7019) | EACH | 50 | $100.00 | $100.00 | $80.00 | $250.00 | $1.00 | $50.00 |
| 20 | Reset SGT impact head (770-7020) | EACH | 40 | $200.00 | $50.00 | $100.00 | $250.00 | $100.00 | $500.00 |
| 21 | Replace SGT object marker (770-7021) | EACH | 50 | $20.00 | $25.00 | $25.00 | $1.00 | $1.00 | $30.00 |
| 22 | Replace SGT cable anchor (770-7022) | EACH | 60 | $20.00 | $25.00 | $50.00 | $1.00 | $1.00 | $120.00 |
| 23 | Replace SGT cable assembly (770-7023) | EACH | 60 | $20.00 | $25.00 | $50.00 | $1.00 | $1.00 | $150.00 |
| 24 | Replace SGT strut (770-7024) | EACH | 20 | $20.00 | $25.00 | $50.00 | $1.00 | $1.00 | $110.00 |
| 25 | Replace downstream anchor terminal (770-7026) | EACH | 22 | $850.00 | $300.00 | $500.00 | $500.00 | $750.00 | $1,200.00 |
| 26 | Repair rail element (curved rail) (770-7027) | LF | 700 | $12.00 | $15.00 | $30.00 | $40.00 | $50.00 | $50.00 |
| 27 | Replace posts (TL-4)(gibraltar) (771-7005) | EACH | 1,600 | $10.00 | $1.00 | $155.00 | $180.00 | $150.00 | $265.00 |
| 28 | Replace posts (TL-4)(trinity) (771-7007) | EACH | 200 | $10.00 | $1.00 | $150.00 | $125.00 | $175.00 | $265.00 |
| 29 | Cable splice / turnbuckle (TL-4) (771-7010) | EACH | 50 | $25.00 | $100.00 | $150.00 | $25.00 | $100.00 | $400.00 |
| 30 | Repair concrete foundation (TL-4) (771-7012) | EACH | 25 | $800.00 | $1.00 | $50.00 | $200.00 | $1.00 | $100.00 |
| 31 | Repair or replace cable barrier terminal sec(TL-4) (771-7014) | EACH | 30 | $500.00 | $100.00 | $300.00 | $1,200.00 | $600.00 | $1,800.00 |
| 32 | Replace cable (TL-4) (771-7016) | LF | 500 | $5.00 | $3.00 | $3.00 | $1.00 | $1.00 | $3.00 |
| 33 | Check / RE-tension cable (TL-4) (771-7018) | EACH | 600 | $7.00 | $1.00 | $1.00 | $200.00 | $1.00 | $200.00 |
| 34 | Post and cable fence(remv / repl posts) (772-7005) | EACH | 10 | $7.00 | $100.00 | $50.00 | $25.00 | $1.00 | $5.00 |
| 35 | Post and cable fence(remove/repl CNC anch) (772-7006) | EACH | 5 | $10.00 | $100.00 | $25.00 | $10.00 | $1.00 | $1.00 |
| 36 | Post and cable fence (remv/ repl cable) (772-7007) | LF | 25 | $2.00 | $10.00 | $30.00 | $10.00 | $1.00 | $0.50 |
| 37 | Post and cable fence (repair) (772-7008) | LF | 100 | $2.00 | $5.00 | $8.00 | $1.00 | $5.00 | $0.50 |
| 38 | Repair (steel post W/channel iron rail) (776-7025) | LF | 25 | $15.00 | $50.00 | $25.00 | $1.00 | $1.00 | $1.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of July 2, 2025. Compiled by Mirage Metrics.