TxDOT contract A00215429 bid tabulation
ILLUMINATION MAINTENANCE, IH0035 (VARIOUS LOCATIONS IN to THE AUSTIN DISTRICT). Let by Texas DOT on December 10, 2025, Travis, Austin District. 3 bids received; low bid $455,590 by Austin Traffic Signal Construction Co., Inc., -24% against the engineer's estimate of $599,664.
- Owner
- Texas DOT
- Letting
- 10 DEC 2025
- Pay items
- 61
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Traffic Signal Construction Co., Inc. | $455,590 | Low | -24% |
| 2 | E-Z Bel Construction, LLC | $751,627 | +65% | +25% |
| 3 | Elecnor Belco Electric, Inc. | $1,445,050 | +217% | +141% |
Engineer's estimate: $599,664.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Traffic Signal Construction Co., Inc. | 2. E-Z Bel Construction, LLC | 3. Elecnor Belco Electric, Inc. |
|---|---|---|---|---|---|---|---|
| 1 | Removing concrete (riprap) (104-7006) | SY | 10 | $1,220.00 | $250.00 | $50.00 | $200.00 |
| 2 | Removing concrete (sidewalk, ramp or shared use path) (104-7014) | CY | 10 | $200.00 | $250.00 | $100.00 | $200.00 |
| 3 | Removing concrete (foundations) (104-7024) | CY | 10 | $685.00 | $500.00 | $100.00 | $1,000.00 |
| 4 | Drilled shaft (roadway illumination pole) (30 in) (416-7040) | LF | 100 | $250.00 | $200.00 | $300.00 | $400.00 |
| 5 | Riprap (concrete) (CL B) (4 in) (432-7007) | CY | 10 | $528.00 | $500.00 | $1,000.00 | $1,000.00 |
| 6 | Mobilization (callout 1) (500-7003) | EACH | 40 | $2,400.00 | $1,600.00 | $4,000.00 | $5,500.00 |
| 7 | Mobilization (callout 2) (500-7004) | EACH | 5 | $3,500.00 | $2,000.00 | $4,000.00 | $9,000.00 |
| 8 | Portable changeable message sign (503-7001) | DAY | 10 | $120.00 | $500.00 | $90.00 | $500.00 |
| 9 | TMA (stationary) (505-7001) | DAY | 30 | $150.00 | $250.00 | $275.00 | $400.00 |
| 10 | TMA (mobile operation) (505-7002) | HR | 180 | $60.00 | $50.00 | $0.01 | $250.00 |
| 11 | Biodegradable erosion control logs (install) (12") (506-7044) | LF | 500 | $6.50 | $4.00 | $10.00 | $10.00 |
| 12 | Biodegradable erosion control logs (remove) (506-7046) | LF | 500 | $2.50 | $2.00 | $1.00 | $5.00 |
| 13 | In RD IL (U/P) (type 1) (150W EQ) LED (610-7014) | EACH | 4 | $950.00 | $1,300.00 | $1,000.00 | $1,200.00 |
| 14 | In RD IL (U/P) (type 2) (150W EQ) LED (610-7016) | EACH | 4 | $1,386.05 | $1,300.00 | $1,000.00 | $1,200.00 |
| 15 | In RD IL (type SA) 40S-8 (250W EQ) LED (610-7116) | EACH | 4 | $5,800.00 | $3,800.00 | $5,000.00 | $5,800.00 |
| 16 | In RD IL (type SA) 40T-8 (250W EQ) LED (610-7124) | EACH | 4 | $6,700.00 | $3,900.00 | $5,300.00 | $6,300.00 |
| 17 | In RD IL (type SP) 48S-10-10(400W EQ)LED (610-7175) | EACH | 4 | $6,000.00 | $6,235.00 | $7,200.00 | $9,200.00 |
| 18 | In RD IL (type SA) 50T-10 (400W EQ) LED (610-7198) | EACH | 4 | $6,501.42 | $5,000.00 | $5,600.00 | $6,600.00 |
| 19 | Conduit (PVC) (schedule 40) (2") (618-7030) | LF | 1,000 | $15.87 | $15.00 | $20.00 | $28.00 |
| 20 | Conduit (PVC) (schedule 40) (2") (bore) (618-7031) | LF | 200 | $26.34 | $60.00 | $100.00 | $48.00 |
| 21 | Conduit (RM) (1 1/2") (618-7076) | LF | 200 | $22.61 | $17.00 | $30.00 | $70.00 |
| 22 | Conduit (RM) (2") (618-7078) | LF | 100 | $32.85 | $19.00 | $35.00 | $90.00 |
| 23 | Electrical conductor (no.10) bare (620-7005) | LF | 500 | $1.32 | $1.00 | $2.00 | $2.00 |
| 24 | Electrical conductor (no.10) insulated (620-7006) | LF | 1,000 | $1.31 | $1.00 | $2.00 | $2.00 |
| 25 | Electrical conductor (no.8) bare (620-7007) | LF | 1,500 | $1.73 | $3.00 | $3.00 | $3.00 |
| 26 | Electrical conductor (no.8) insulated (620-7008) | LF | 4,000 | $1.90 | $4.00 | $3.00 | $3.00 |
| 27 | Electrical conductor (no.6) bare (620-7009) | LF | 200 | $2.14 | $4.00 | $3.00 | $4.00 |
| 28 | Electrical conductor (no.6) insulated (620-7010) | LF | 500 | $2.46 | $5.00 | $3.00 | $4.00 |
| 29 | Electrical conductor (no.4) bare (620-7011) | LF | 200 | $2.56 | $4.00 | $3.00 | $5.00 |
| 30 | Electrical conductor (no.4) insulated (620-7012) | LF | 200 | $3.23 | $5.00 | $3.00 | $5.00 |
| 31 | Electrical conductor (no.2) bare (620-7015) | LF | 500 | $3.89 | $4.00 | $5.00 | $6.00 |
| 32 | Electrical conductor (no.2) insulated (620-7016) | LF | 500 | $4.04 | $5.00 | $5.00 | $6.00 |
| 33 | Ground box type A (122311)W/apron (624-7002) | EACH | 10 | $1,556.47 | $850.00 | $1,250.00 | $1,700.00 |
| 34 | Remove ground box (624-7013) | EACH | 4 | $543.00 | $175.00 | $300.00 | $500.00 |
| 35 | Remove electrical services (628-7002) | EACH | 4 | $1,208.30 | $450.00 | $500.00 | $1,000.00 |
| 36 | Elc SRV type A 120/240 100(NS)SS(E)GC(O) (628-7022) | EACH | 1 | $5,000.00 | $4,500.00 | $12,000 | $8,500.00 |
| 37 | Elc SRV type A 120/240 100(NS)SS(E)SP(O) (628-7025) | EACH | 1 | $5,000.00 | $5,000.00 | $11,000 | $8,500.00 |
| 38 | Elc SRV type A 240/480 100(NS)SS(E)GC(O) (628-7076) | EACH | 1 | $5,500.00 | $4,500.00 | $13,000 | $8,500.00 |
| 39 | Elc SRV type A 240/480 100(NS)SS(E)PS(U) (628-7078) | EACH | 2 | $5,500.00 | $5,000.00 | $11,000 | $9,000.00 |
| 40 | Elc SRV type A 240/480 100(NS)SS(E)SP(O) (628-7079) | EACH | 1 | $5,500.00 | $5,000.00 | $10,000 | $9,500.00 |
| 41 | Replace luminaire pole (690-7126) | EACH | 35 | $400.00 | $1,200.00 | $1,700.00 | $7,000.00 |
| 42 | Install electrical splice (690-7157) | EACH | 50 | $116.46 | $100.00 | $100.00 | $100.00 |
| 43 | Repair underground conduit (690-7159) | EACH | 4 | $26.25 | $400.00 | $1,000.00 | $2,500.00 |
| 44 | Repair underground duct cable (690-7160) | EACH | 4 | $500.00 | $500.00 | $1,000.00 | $1,000.00 |
| 45 | Maintain high mast illumination (690-7185) | EACH | 10 | $1,923.28 | $500.00 | $1,000.00 | $3,500.00 |
| 46 | Maintain underpass fixture (690-7187) | EACH | 10 | $52.50 | $250.00 | $500.00 | $1,500.00 |
| 47 | Maintain induction fluorescent fixture (690-7188) | EACH | 10 | $146.58 | $250.00 | $500.00 | $1,500.00 |
| 48 | Replace transformer base (690-7197) | EACH | 20 | $1,115.28 | $400.00 | $1,250.00 | $10,000 |
| 49 | Install ground rod (690-7200) | EACH | 40 | $69.33 | $50.00 | $100.00 | $350.00 |
| 50 | Replace fuse (690-7218) | EACH | 100 | $56.59 | $50.00 | $100.00 | $125.00 |
| 51 | Replace fuse holder (690-7219) | EACH | 4 | $120.00 | $125.00 | $100.00 | $250.00 |
| 52 | Replace breakaway fuse holder (690-7220) | EACH | 40 | $108.99 | $200.00 | $100.00 | $350.00 |
| 53 | Replace hand-off-auto switch (690-7229) | EACH | 4 | $293.04 | $100.00 | $200.00 | $3,500.00 |
| 54 | Replace contactor (690-7230) | EACH | 4 | $415.71 | $100.00 | $200.00 | $2,000.00 |
| 55 | Replace breaker panel (690-7233) | EACH | 4 | $2,300.16 | $500.00 | $200.00 | $3,500.00 |
| 56 | Install circuit breaker (690-7234) | EACH | 10 | $633.25 | $100.00 | $100.00 | $300.00 |
| 57 | Replace circuit breaker (690-7235) | EACH | 4 | $286.07 | $100.00 | $100.00 | $300.00 |
| 58 | Troubleshoot for repairs (690-7242) | HR | 25 | $183.33 | $250.00 | $175.00 | $150.00 |
| 59 | Replace luminaires (690-7244) | EACH | 200 | $468.62 | $165.00 | $500.00 | $660.00 |
| 60 | Replace photocell (690-7245) | EACH | 20 | $86.22 | $100.00 | $200.00 | $350.00 |
| 61 | Subsurface util locate (non-paved area) (5061-7001) | EACH | 5 | $750.00 | $500.00 | $1,000.00 | $1,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 10, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.