BRIDGE PREVENTATIVE MAINTENANCE, SH0208 (VARIOUS LOCATIONS IN THE SAN ANGELO DIST to VARIOUS LOCATIONS IN THE SAN ANGELO DIST). Let by Texas DOT on November 20, 2025, Tom Green, San Angelo District. 11 bids received; low bid $505,934 by BK Field Operations LLC, -33% against the engineer's estimate of $750,055.
- Owner
- Texas DOT
- Letting
- 20 NOV 2025
- Pay items
- 23
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | BK Field Operations LLC | $505,934 | Low | -33% |
| 2 | Beck-Reit & Sons, LTD. | $521,755 | +3.0% | -30% |
| 3 | Blacksmith Ventures LLC | $568,190 | +12% | -24% |
| 4 | Roy Jorgensen Associates, Inc. | $576,643 | +14% | -23% |
| 5 | Scout 5 Construction LLC | $583,192 | +15% | -22% |
| 6 | Premier Contractors LLC | $689,534 | +36% | -8.0% |
| 7 | MPB, Inc. | $732,531 | +45% | -2.0% |
| 8 | SCR Civil Construction, LLC | $752,678 | +49% | 0.0% |
| 9 | Scott Tucker Construction Company, LLC | $781,118 | +54% | +4.0% |
| 10 | Pathfield Investments LLC | $872,598 | +72% | +16% |
| 11 | 3LW Civil LLC | $938,811 | +86% | +25% |
Engineer's estimate: $750,055.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. BK Field Operations LLC | 2. Beck-Reit & Sons, LTD. | 3. Blacksmith Ventures LLC | 4. Roy Jorgensen Associates, Inc. | 5. Scout 5 Construction LLC | 6. Premier Contractors LLC |
|---|---|---|---|---|---|---|---|---|---|---|
| 1 | Preparation row (tree remove) (0"-12" diameter) (100-7003) | EACH | 3 | $600.00 | $100.00 | $250.00 | $1.00 | $500.00 | $400.00 | $300.00 |
| 2 | Removing concrete (miscellaneous) (104-7047) | CY | 14.80 | $160.00 | $100.00 | $50.00 | $100.00 | $300.00 | $250.00 | $100.00 |
| 3 | Excavation (channel) (110-7002) | CY | 220 | $30.00 | $80.00 | $55.00 | $85.00 | $100.00 | $175.00 | $30.00 |
| 4 | Embankment (final)(OC)(type B) (132-7003) | CY | 275.90 | $50.00 | $1.00 | $1.00 | $50.00 | $250.00 | $180.00 | $10.00 |
| 5 | Flowable backfill (401-7001) | CY | 54 | $500.00 | $400.00 | $411.00 | $500.00 | $250.00 | $400.00 | $350.00 |
| 6 | Concrete structure repair(clean & coat WTH epoxy) (429-7001) | SF | 50 | $150.00 | $100.00 | $55.00 | $20.00 | $275.00 | $100.00 | $250.00 |
| 7 | Concrete structure repair (vertical & overhead) (429-7007) | SF | 2,345 | $120.00 | $90.00 | $120.00 | $125.00 | $50.00 | $71.00 | $200.00 |
| 8 | Riprap (mow strip)(4 in) (432-7013) | CY | 0.60 | $650.00 | $800.00 | $5,000.00 | $3,000.00 | $650.00 | $840.00 | $200.00 |
| 9 | Riprap (stone common)(dry)(6 in) (432-7029) | CY | 3.90 | $100.00 | $800.00 | $250.00 | $195.00 | $1,000.00 | $800.00 | $150.00 |
| 10 | Riprap (stone protection)(12 in) (432-7041) | CY | 81.70 | $200.00 | $240.00 | $150.00 | $195.00 | $500.00 | $500.00 | $200.00 |
| 11 | Cleaning and sealing existing joints (CL7) (438-7007) | LF | 859 | $35.00 | $45.00 | $55.00 | $45.00 | $30.00 | $95.00 | $45.00 |
| 12 | STR steel (miscellaneous bridge) (442-7008) | LB | 5 | $20.00 | $1,000.00 | $55.00 | $1,000.00 | $150.00 | $125.00 | $1,000.00 |
| 13 | Wingwall (FW - S) (HW=6 FT) (466-7162) | EACH | 1 | $22,000 | $8,000.00 | $4,800.00 | $20,000 | $18,000 | $3,000.00 | $20,000 |
| 14 | Set (replace pipe runner) (467-7004) | EACH | 1 | $1,650.00 | $1,200.00 | $1,800.00 | $2,000.00 | $2,500.00 | $1,500.00 | $1,500.00 |
| 15 | Clean existing culverts (480-7002) | CY | 34.40 | $75.00 | $150.00 | $75.00 | $1.00 | $95.00 | $200.00 | $150.00 |
| 16 | Adjust steel shoes (499-7001) | EACH | 9 | $7,500.00 | $7,000.00 | $4,700.00 | $10,000 | $7,000.00 | $2,000.00 | $1,000.00 |
| 17 | Mobilization (500-7001) | LS | 1 | $95,877 | $20,000 | $44,000 | $1.00 | $60,000 | $50,851 | $50,000 |
| 18 | Barricades, signs and traffic handling (502-7001) | MO | 5 | $3,000.00 | $1.00 | $1.00 | $1.00 | $8,000.00 | $2,000.00 | $1.00 |
| 19 | TMA (stationary) (505-7001) | DAY | 10 | $500.00 | $2,000.00 | $1.00 | $1,000.00 | $850.00 | $0.01 | $1.00 |
| 20 | Install object marker assembly (OM-3L)(TWT)GNDHH (658-7271) | EACH | 2 | $250.00 | $1,200.00 | $250.00 | $200.00 | $150.00 | $550.00 | $500.00 |
| 21 | Driftwood removal (735-7060) | CY | 20 | $70.00 | $100.00 | $110.00 | $100.00 | $50.00 | $150.00 | $1.00 |
| 22 | Steel bridge zone painting ref STR #1 (4010-7001) | EACH | 1 | $150,000 | $59,000 | $38,000 | $25,000 | $65,000 | $75,000 | $20,000 |
| 23 | Bent cap/abutment cap cleaning (7001-7002) | EACH | 2 | $400.00 | $500.00 | $800.00 | $750.00 | $1,000.00 | $500.00 | $5,000.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of November 20, 2025. Compiled by Mirage Metrics.
Your own bid history, read the same way
Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.