TxDOT contract A00218162 bid tabulation
METAL BEAM GUARD FENCE REPAIR, IH0020 (Various locations in to the Big Spring Area). Let by Texas DOT on December 3, 2025, Howard, Abilene District. 5 bids received; low bid $268,963 by Austin Barricade Company, L.L.C., -72% against the engineer's estimate of $966,365.
- Owner
- Texas DOT
- Letting
- 03 DEC 2025
- Pay items
- 27
- Data through
- 19 NOV 2026
Bidders
| Rank | Bidder | Total bid | Against the low bid | Against the estimate |
|---|---|---|---|---|
| 1 | Austin Barricade Company, L.L.C. | $268,963 | Low | -72% |
| 2 | BK Field Operations LLC | $344,530 | +28% | -64% |
| 3 | HJC Farms, Inc. | $758,212 | +182% | -22% |
| 4 | Ti-Zack Concrete, LLC | $996,270 | +270% | +3.0% |
| 5 | E.V.G. Enterprise | $1,094,255 | +307% | +13% |
Engineer's estimate: $966,365.
Bid tabulation
| Line | Pay item | Unit | Quantity | Estimate | 1. Austin Barricade Company, L.L.C. | 2. BK Field Operations LLC | 3. HJC Farms, Inc. | 4. Ti-Zack Concrete, LLC | 5. E.V.G. Enterprise |
|---|---|---|---|---|---|---|---|---|---|
| 1 | Mobilization (callout) (500-7002) | EACH | 5 | $750.00 | $1,385.00 | $1.00 | $1.00 | $5,500.00 | $1,000.00 |
| 2 | Mobilization (emergency) (500-7033) | EACH | 75 | $750.00 | $1.00 | $1.00 | $1.00 | $4,500.00 | $1,000.00 |
| 3 | TMA (stationary) (505-7001) | DAY | 450 | $250.00 | $0.25 | $1.00 | $1.00 | $122.00 | $100.00 |
| 4 | Install delineator assembly (D-SW)SZ 1(BRF)GF2 (658-7018) | EACH | 100 | $50.00 | $1.00 | $10.00 | $50.00 | $15.00 | $10.00 |
| 5 | Install delineator assembly (D-SY)SZ 1(BRF)GF2 (658-7036) | EACH | 5 | $30.00 | $305.00 | $500.00 | $25.00 | $33.00 | $10.00 |
| 6 | Replace rail element (W-beam) (770-7001) | LF | 8,500 | $21.00 | $0.18 | $1.00 | $22.00 | $13.00 | $17.00 |
| 7 | Replace rail element (thrie-beam) (770-7002) | LF | 15 | $58.00 | $50.00 | $20.00 | $115.00 | $95.00 | $17.00 |
| 8 | Repl rail elmnt(thrie-BM trans to W-BM) (770-7003) | EACH | 10 | $75.00 | $50.00 | $1.00 | $1.00 | $750.00 | $20.00 |
| 9 | Replace timber post W/O concrete FND (770-7006) | EACH | 350 | $65.00 | $50.00 | $200.00 | $40.00 | $45.00 | $100.00 |
| 10 | Replace steel post W/O concrete FND (770-7007) | EACH | 350 | $55.00 | $1.00 | $1.00 | $0.01 | $45.00 | $200.00 |
| 11 | Replace timber post W/ concrete FND (770-7008) | EACH | 100 | $65.00 | $50.00 | $100.00 | $40.00 | $99.00 | $100.00 |
| 12 | Replace steel post W/ concrete FND (770-7009) | EACH | 100 | $55.00 | $1.00 | $1.00 | $0.01 | $125.00 | $200.00 |
| 13 | Rem obsolete get & repl W/ SGT (770-7013) | EACH | 91 | $3,500.00 | $985.00 | $1,100.00 | $4,000.00 | $750.00 | $4,500.00 |
| 14 | Repl single gdrail terminal impact head (770-7015) | EACH | 10 | $1,100.00 | $500.00 | $500.00 | $800.00 | $550.00 | $1,000.00 |
| 15 | Replace single gdrail terminal rail (770-7016) | LF | 55 | $25.00 | $89.00 | $18.00 | $35.00 | $122.00 | $20.00 |
| 16 | Replace single gdrail terminal post (770-7017) | EACH | 15 | $63.00 | $287.00 | $100.00 | $375.00 | $1,333.00 | $100.00 |
| 17 | Replace blockout (770-7018) | EACH | 575 | $20.00 | $95.00 | $6.00 | $3.50 | $35.00 | $50.00 |
| 18 | Repair steel post with base plate (770-7019) | EACH | 15 | $175.00 | $56.00 | $100.00 | $260.00 | $950.00 | $100.00 |
| 19 | Replace downstream anchor terminal (770-7026) | EACH | 20 | $650.00 | $1.00 | $200.00 | $1,000.00 | $1,500.00 | $1,200.00 |
| 20 | Repair rail element (curved rail) (770-7027) | LF | 1,150 | $25.00 | $1.00 | $10.00 | $28.00 | $45.00 | $20.00 |
| 21 | Replace posts (TL-4)(gibraltar) (771-7005) | EACH | 50 | $100.00 | $924.00 | $699.00 | $1,250.00 | $500.00 | $150.00 |
| 22 | Replace posts (TL-4)(trinity) (771-7007) | EACH | 50 | $100.00 | $437.00 | $699.00 | $750.00 | $250.00 | $300.00 |
| 23 | Cable splice / turnbuckle (TL-4) (771-7010) | EACH | 45 | $160.00 | $1.00 | $1.00 | $75.00 | $350.00 | $300.00 |
| 24 | Repair concrete foundation (TL-4) (771-7012) | EACH | 55 | $130.00 | $1.00 | $1.00 | $1.00 | $250.00 | $100.00 |
| 25 | Repair or replace cable barrier terminal sec(TL-4) (771-7014) | EACH | 75 | $1,450.00 | $1.00 | $200.00 | $1.00 | $700.00 | $1,900.00 |
| 26 | Replace cable (TL-4) (771-7016) | LF | 4,400 | $2.00 | $0.25 | $3.00 | $1.00 | $12.00 | $1.00 |
| 27 | Concrete rail repair (miscellaneous) (778-7002) | LF | 50 | $500.00 | $94.00 | $500.00 | $5.00 | $250.00 | $10.00 |
The pay item list has one row per line (item, description, unit, quantity, the low bidder's unit price), the flat layout estimating software imports. Pay items with a page of their own open their price history.
Source
Read from TxDOT's tabulation for this contract. TxDOT Bid Tabulations open-data export (data.texas.gov) from September 2024, read 21 November 2026, and TxDOT's legacy Tabulation of Bids pages for January 2020 to August 2024. The legacy pages are a large sample, not every contract: their file names were reused from year to year. Their district is the one TxDOT gives the county. Bids that did not match their published total are left out.
Every contract let that day: TxDOT letting of December 3, 2025. Compiled by Mirage Metrics.