Shamrock Paving, Inc.: WSDOT bid record

Shamrock Paving, Inc. submitted 28 bids on Washington State DOT contracts in the data, from 14 MAR 2013 to 13 APR 2022, and was the low bidder on 12 of them (43%). When it was not low, its total sat a median +13% above the low bid.

Owner
Washington State DOT
Low bid volume
$27,587,706
Latest bid
13 APR 2022
Data through
07 OCT 2026
28Bids
12Low bids
43Win rate, percent
+13%Median gap to the low bid when not low, 16 bids

By year

YearBidsLow bidsWin rate
2013300%
2015100%
201611100%
20174125%
20185240%
20195360%
202022100%
2021200%
20225360%
Shamrock Paving, Inc., WSDOT: bids and low bids by year of letting

By region

RegionBidsLow bidsWin rate
ER region261246%
NCR region200%
Shamrock Paving, Inc., WSDOT: bids and low bids by region

Pay items where it is most often lowest

Pay itemCodeUnitLines bidLowest on the lineIts median priceAll bidders' median
Erosion and sediment control leadDAY2417 (71%)$112.50$100.00
Paint lineLF2314 (61%)$0.16$0.25
Planing bituminous pavementSY2313 (57%)$2.00$4.75
Inlet protectionEACH2113 (62%)$90.00$95.00
Portable changeable message signHR1510 (67%)$4.25$5.12
Joint adhesive for bituminous pavementLF208 (40%)$0.55$0.60
Construction signs class ASF188 (44%)$15.00$16.21
Removing guide postEACH158 (53%)$5.00$7.47
Adjust valve boxEACH118 (73%)$400.00$330.00
Temporary pavement marking-short durationLF177 (41%)$0.20$0.40
Adjust manholeEACH116 (55%)$575.00$500.00
Crushed surfacing base courseTON86 (75%)$28.50$26.44
Shamrock Paving, Inc., WSDOT: pay items where its unit price was the lowest on the line

A line counts when the firm priced it and at least one other bidder did too; the lowest unit price on the line counts whoever won the contract. Token prices and bids over three times the low bid are left out.

Who it meets most

FirmContracts in commonThat firm ranked ahead
CPM Development Corporation179 of 17
Poe Asphalt Paving, Inc.144 of 14
Inland Asphalt Company43 of 4
Spokane Rock Products Inc.32 of 3
N.A. Degerstrom, Inc.32 of 3
WM. Winkler Company21 of 2
Knife River Corporation-Northw11 of 1
Red Diamond Construction Inc11 of 1
T. Lariviere Equipment & Excav11 of 1
DW Excavating, Inc10 of 1
Shamrock Paving, Inc., WSDOT: the firms on the same contracts most often

Latest bids

LetContractRegionProjectRankIts bidAgainst the low bid
13 APR 2022009798ER regionI-90 bridge deck preventative preservation - patching1 of 1$2,929,292Low
30 MAR 2022009792ER regionEr bridge deck preventative preservation - patching1 of 1$2,148,518Low
24 FEB 2022009767NCR regionSr 17 grape dr intersection safety improvement2 of 2$2,350,0010.0%
09 FEB 2022009765ER regionUs 395 immel rd to arden paving1 of 2$2,690,000Low, 2.0% under the second
20 JAN 2022009759ER regionUs 2 davenport to reardan paving3 of 3$2,994,000+3.0%
28 APR 2021009677ER regionI-90 liberty park pl to sprague ave paving2 of 3$1,696,000+6.0%
13 JAN 2021009631NCR regionUs 2 et al ncr 19-21 regionwide curve warning sign update4 of 5$541,143+43%
25 MAR 2020009534ER regionI-90 salnave rd to bnsf rr bridge paving1 of 3$1,673,673Low, 9.0% under the second
15 JAN 2020009505ER regionI-90 sprague i/c to argonne i/c paving1 of 3$5,777,777Low, 7.0% under the second
17 APR 2019009400ER regionUs 2 division wye to farwell rd paving2 of 2$3,400,000+21%
21 FEB 2019009381ER regionUs 195 smythe rd to paradise rd paving1 of 3$856,856Low, 5.0% under the second
06 FEB 2019009377ER regionUs 195 sr 271 to plaza rd paving1 of 3$3,245,935Low, 21% under the second
30 JAN 2019009375ER regionUs 2 colbert rd to westwood rd paving3 of 3$6,666,667+45%
24 JAN 2019009369ER regionUs 195 thorpe rd intersection improvement1 of 4$1,227,227Low, 2.0% under the second
25 APR 2018009258ER regionUs 395 deer park corridor - intersection improvements2 of 2$3,500,000+18%
14 MAR 2018009223ER regionSr 291 charles rd to suncrest paving1 of 3$1,421,494Low, 4.0% under the second
22 FEB 2018009210ER regionSr 25 spokane river bridge n embankment repair3 of 3$2,441,235+71%
18 JAN 2018009189ER regionSr 902 medical lake to i-90 paving1 of 3$1,872,436Low, 9.0% under the second
10 JAN 2018009187ER regionUs 2 jct i-90 to euclid ave paving2 of 3$4,089,068+1.0%
26 APR 2017009072ER regionSr 290 mission ave to sullivan rd paving2 of 3$3,672,641+6.0%
12 APR 2017009068ER regionSr 904 mullenix rd to betz rd paving1 of 2$1,624,312Low, 4.0% under the second
05 APR 2017009063ER regionUs 2 francis ave to division wye paving2 of 2$1,867,266+5.0%
01 FEB 2017009008ER regionUs 395 nsc - spokane river to francis ave grading6 of 7$556,474+45%
20 APR 2016008881ER regionI-90 freya st interchange ramp improvements 16z0101 of 2$2,120,185Low, 2.0% under the second
15 APR 2015008738ER regionSr 290 sullivan rd to idaho state line paving 15z0072 of 2$4,904,963+33%
Shamrock Paving, Inc.: latest WSDOT bids in the data

How this record was read

WSDOT bid tabulation PDFs, one per contract: 2026 tabulations from wsdot.wa.gov and the legacy Bid Check and Bid Tabulation reports of 1999 to 2023. 2000 to 2003 lettings use metric units. Only bids matching their published total are kept.

  • Every bid counted here matched its published total to within one dollar; WSDOT's rank decides who was low.
  • The gap to the low bid is the firm's total over the low total, minus one, on contracts it did not win, leaving out bids over three times the low bid.
  • A record covers the lettings in the data, not every contract the firm ever bid. Coverage by year is on the state page.

A name split in two, or a figure that does not match the owner's tabulation? Write to mehdi@miragemetrics.com and we correct it.

Your own bid history, read the same way

Mirage deploys AI agents for heavy civil estimating teams: quantities from the plan set, specs and addenda read, and bid tabs compared, inside your systems and your rules.